2427 EAST 29TH STREET · BIN 3334400
💬 Discuss this project
1955Year Built
6Stories
D4Building Class
R4Zoning
210,028 sfGross Floor Area
169Units
LL97 CoveredRent Stabilized4 Active Violations 2 old, status unconfirmed ▸FISP: SAFEFDNY Report ↗
Elevator cooperative · Owner of record: Sheepshead Terrace Co-OP Apts · 64,500 sf lot · 3.26 FAR built · Flood zone X500
Locations of Work
ArchitectureStructuralElectricalMechanicalEquipmentGeneralOther
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
RoofRooftop antenna installation6p · 2 filings · 14 docs
Floor 1Concrete and demolition work5p · 1 filing · 8 docs
Sub-BasementRooftop antenna installation1 filing · 7 docs
Site & exteriorRooftop antenna installation4p · 2 filings · 11 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Sheepdhead Bay Terrace Coop3303/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
George J. Xerakias, PE106/08/2026
KMB Design Group204/10/2023
Grant203/20/2023
Royal T&E108/17/2018
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Construction Permit Services403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Watch Hill Wireless SoluGeneral Contractor303/21/2026
Phoenix Sutton STRScaffold207/08/2026
Jubilee ElectricElectrical203/21/2026
DC ProjectsGeneral Contractor207/01/2026
Cross Hudson ElectricalElectrical103/21/2026
Century Electric CoElectrical103/22/2026
E.T. VanderbeckGeneral Contractor107/08/2026
Falco Electrical ServicesElectrical103/21/2026
Jubilee Electrical Service CoElectrical103/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
George J. Xerakias, PE1658106/08/2026
KMB Design Group513204/10/2023
Grant Engineering Consulting3512203/20/2023
Building Lifecycle
All (101)Filed (6)Permit Issued (6)Signed Off (4)Facade (FISP) (12)Violation (60)Objection (8)Special Inspection (5)
09/30/2026
Signed off — Alteration
GARAGE PATCHING AND REPAIR WORK AS PER PLAN. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
B01234519-I1
06/29/2026
Permit issued — General Construction
B01234519-I1-GC
06/22/2026
Permit issued — General Construction
B01234519-I1-GC
06/08/2026
Filed — Alteration
GARAGE PATCHING AND REPAIR WORK AS PER PLAN. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
B01234519-I1
05/11/2026
Special inspection requirement — Masonry
George Xerakias
05/11/2026
Special inspection requirement — Post-installed Anchors
George Xerakias
05/11/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
George Xerakias
05/11/2026
Special inspection requirement — Tenant Protection Plan Compliance
George Xerakias
05/07/2026
Violation issued (HPD, open)
A
11/20/2025
Violation issued (HPD, open)
I
06/12/2025
Violation issued (HPD, open)
A
06/02/2025
Special inspection requirement — Final
George Xerakias
11/29/2024
Violation issued (HPD, open)
I
09/10/2024
Signed off — Alteration
NEW INSTALLATION OF DISH WIRELESS SITE. INSTALL (3) NEW ANTENNA SECTORS (3 PANEL ANTENNAS TOTAL), (1) GPS UNIT, (6) RRH UNITS, AND (1) WALL-MOUNTED EQUIPMENT CABINET. RELATED CONDUIT ROUTAGE FOR EQUIPMENT SERVICING FROM BASEMENT TO ROOF.
B00551669-I1
12/27/2023
Cycle 9 facade report signed — SAFE
11/22/2023
Violation issued (HPD, closed)
C
11/16/2023
Cycle 9 facade report submitted
11/14/2023
Cycle 9 facade inspection completed
04/10/2023
Filed — Alteration
NEW INSTALLATION OF DISH WIRELESS SITE. INSTALL (3) NEW ANTENNA SECTORS (3 PANEL ANTENNAS TOTAL), (1) GPS UNIT, (6) RRH UNITS, AND (1) WALL-MOUNTED EQUIPMENT CABINET. RELATED CONDUIT ROUTAGE FOR EQUIPMENT SERVICING FROM BASEMENT TO ROOF.
B00551669-P1
03/28/2023
Signed off — Alteration
Decommission of existing Sprint site. Remove antennas and equipment from the roof. Initial installation approved under application # 310131899. All mounting hardware to remain.
B00611131-I1
03/20/2023
Filed — Alteration
Decommission of existing Sprint site. Remove antennas and equipment from the roof. Initial installation approved under application # 310131899. All mounting hardware to remain.
B00611131-P1
12/05/2022
Violation issued (FDNY_NOV, closed)
11/14/2022
Violation issued (HPD, closed)
I
08/28/2022
Permit issued — Antenna
B00551669-I1-AN
08/01/2022
Objection resolved — Addressed
08/01/2022
Objection resolved — Addressed
08/01/2022
Objection resolved — Addressed
08/01/2022
Objection resolved — Addressed
07/05/2022
Objection raised — Zoning
06/27/2022
Objection raised — Fire_Protection
06/27/2022
Objection raised — Scope
06/27/2022
Objection raised — Admin
06/23/2022
Filed — Alteration
NEW INSTALLATION OF DISH WIRELESS SITE. INSTALL (3) NEW ANTENNA SECTORS (3 PANEL ANTENNAS TOTAL), (1) GPS UNIT, (6) RRH UNITS, AND (1) WALL-MOUNTED EQUIPMENT CABINET. RELATED CONDUIT ROUTAGE FOR EQUIPMENT SERVICING FROM BASEMENT TO ROOF.
B00551669-I1
03/08/2022
Violation issued (HPD, closed)
A
01/04/2022
Permit issued — Antenna
B00611131-I1-AN
12/14/2021
Filed — Alteration
Decommission of existing Sprint site. Remove antennas and equipment from the roof. Initial installation approved under application # 310131899. All mounting hardware to remain.
B00611131-I1
11/11/2021
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
11/11/2021
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
11/11/2021
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
11/11/2021
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
04/16/2021
Violation issued (HPD, closed)
I
04/16/2021
Violation issued (HPD, closed)
A
01/22/2021
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
01/22/2021
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
11/18/2020
Violation issued (ECB, closed)
Construction
11/04/2019
Violation issued (HPD, closed)
I
10/01/2019
Violation issued (ECB, closed)
Elevators
10/01/2019
Violation issued (ECB, closed)
Elevators
06/27/2019
Signed off — Alteration
B00071804-I1
02/06/2019
Cycle 8 facade report submitted
02/04/2019
Cycle 8 facade inspection completed
01/14/2019
Cycle 8 facade report signed — SWARMP
11/02/2018
Permit issued — Sidewalk Shed
B00071804-I1-SH
08/18/2018
Permit issued — Sidewalk Shed
B00071804-I1-SH
08/17/2018
Filed — Alteration
B00071804-I1
04/06/2018
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
04/06/2018
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
11/23/2016
Violation issued (HPD, closed)
I
05/01/2015
Violation issued (HPD, closed)
A
12/30/2014
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
Latest 60 of 101 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offDC Projects06/29/2026
DOB NOWGeneral ConstructionSigned-offDC Projects06/22/2026
DOB NOWAntennaSigned-offE.T. Vanderbeck08/28/2022
DOB NOWAntennaSigned-offWatch Hill Wireless Solu01/04/2022
DOB NOWSidewalk ShedSigned-offPhoenix Sutton STR11/02/2018
DOB NOWSidewalk ShedSigned-offPhoenix Sutton STR08/18/2018
BISOTISSUEDMcFar Construction11/23/2018
BISOTISSUEDMcFar Construction09/10/2018
BISSPISSUEDFire Prevention Prod12/28/2017
BISOTISSUEDWilliam K. Construction Group09/25/2017
BISSPISSUEDUnited States Sprinkler12/28/2016
BISOTISSUEDWilliam K. Construction Group10/06/2016
BISOTISSUEDWilliam K. Construction Group08/03/2016
BISOTISSUEDOdyssia Global Commercial02/28/2013
BISEQISSUEDEverest Scaffolding06/04/2012
BISOTISSUEDOdyssia Global Commercial05/16/2012
BISOTISSUEDMC Far Contractors11/22/2011
BISEQISSUEDEverest Scaffolding06/27/2011
BISOTISSUEDMC Far Contractors06/17/2011
BISOTISSUEDMC Far Contractors06/07/2011
BISOTISSUEDMC Far Contractors10/21/2010
BISOTISSUEDBci Communications01/22/2009
BISOTISSUEDSba Communications03/17/2005
BISOTISSUEDSba Communications08/09/2004
BISEQISSUEDSpring Enterprises11/25/1998
BISEQISSUEDSpring Enterprises11/25/1998
BISOTISSUEDMcFar Contractors10/10/1997
BISEQRE-ISSUEDSpring Enterprises09/24/1997
BISEQRE-ISSUEDSpring Enterprises09/24/1997
BISFSISSUEDBetter Energy Group10/10/1995
BISPLISSUEDEbm Plumbing10/06/1995
BISPLISSUEDVarsity Plumbing08/25/1995
BISMHISSUEDVarsity Plumbing08/25/1995
BISBLISSUEDAggressive Heating11/08/1993
6 projects · most recent 10/21/2022
General Wiring
FiledStatusContractorScope
10/21/2022Permit IssuedAssociated Electric Cont of NGeneral Wiring
06/10/2020CompleteAll Boro Electric—
01/20/2020CompleteCentury ElectricGeneral Wiring
01/20/2020CompleteCentury ElectricGeneral Wiring
10/01/2018CompleteJubilee Electrical Service CoGeneral Wiring
08/14/2018CompleteElpo Electrical Contg—
▾Special Inspection Requirements (DOB NOW) — 5
DateRequirementInspectorRole
05/11/2026MasonryGeorge Xerakiasspecial
05/11/2026Post-installed AnchorsGeorge Xerakiasspecial
05/11/2026Structural Stability – Alterations of existing buildingsGeorge Xerakiasspecial
05/11/2026Tenant Protection Plan ComplianceGeorge Xerakiasspecial
06/02/2025FinalGeorge Xerakiasprogress
▾Documents — 122 on file (BIS + DOB NOW)
▸Plans & Drawings6
▸DOB NOWPlans/Sketch6
09/03/2026B00071804-I1Request digital key ↗
08/31/2026B00611131-P1Request digital key ↗
08/31/2026B00611131-I1Request digital key ↗
Showing 3 of 6 on file for this type
▸Applications & Permits25
▸BISWORK PERMIT APPLICATION15
09/11/2018321428745Open ↗
01/02/2018321486110Open ↗
12/29/2016321486110Open ↗
Showing 3 of 15 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION10
05/01/2019340665827Open ↗
11/28/2016321486110Open ↗
08/01/2016321428745Open ↗
Showing 3 of 10 on file for this type
▸Seals & Professional Certifications29
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION11
02/26/2018321486110Open ↗
02/26/2018321486110Open ↗
08/17/2017321486110Open ↗
Showing 3 of 11 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature6
09/03/2026B00071804-I1Open ↗
08/29/2026B00551669-I1Open ↗
08/29/2026B00551669-P1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature4
08/25/2026B01234519-I1Open ↗
08/25/2026B01234519-I1Open ↗
08/25/2026B01234519-I1Open ↗
Showing 3 of 4 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT3
05/01/2019340665827Open ↗
11/28/2016321486110Open ↗
08/01/2016321428745Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST2
11/28/2016321486110Open ↗
08/01/2016321428745Open ↗
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION1
05/01/2019340665827Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
05/01/2019340665827Open ↗
▸DOB NOWProgress Inspector Seal & Signature1
08/25/2026B01234519-I1Open ↗
▸Trade Schedules & Equipment2
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE1
11/28/2016321486110Open ↗
▸BISPLUMBING - SUPPORTING DOCUMENTATION1
05/01/2019340665827Open ↗
▸Safety & Tenant Protection2
▸BISTenant Protection Plan and Notes2
08/01/2016321428745Open ↗
05/01/2019340665827Open ↗
▸Environmental & Asbestos11
▸DOB NOWDEP ACP-5: Asbestos Assessment Report5
08/29/2026B00551669-P1Open ↗
08/16/2026B01234519-I1Open ↗
08/14/2026B00551669-I1Open ↗
Showing 3 of 5 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'3
05/10/2012320475099Open ↗
08/25/2010320210339Open ↗
04/29/2008310131899Open ↗
▸BISASBESTOS: CERTIFICATION (DEP ACP5)3
05/01/2019340665827Open ↗
11/28/2016321486110Open ↗
08/01/2016321428745Open ↗
▸Energy Compliance6
▸BISAS-BUILT ENERGY ANALYSIS2
07/19/2019321428745Open ↗
07/25/2014320475099Open ↗
▸DOB NOWEN2: As Built Energy Analysis.2
08/14/2026B00551669-I1Open ↗
08/13/2026B00611131-I1Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY1
05/01/2019340665827Open ↗
▸BISTECHNICAL REPORT: ENERGY1
05/10/2012320475099Open ↗
▸Inspections & Test Reports1
▸BISTECHNICAL REPORT: RESPONSIBILITY1
05/01/2019340665827Open ↗
▸Approvals, Objections & Sign-offs11
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST5
03/05/2018321486110Open ↗
08/17/2017321486110Open ↗
01/16/2013320210339Open ↗
Showing 3 of 5 on file for this type
▸BISADMINISTRATIVE OBJECTIONS3
05/10/2012320475099Open ↗
08/25/2010320210339Open ↗
04/29/2008310131899Open ↗
▸BISLETTERS - SUPPORTING DOCUMENTATION2
01/02/2018321486110Open ↗
08/17/2017321486110Open ↗
▸BISThird Party Electrical Signoff Compliance Report1
08/10/2012320328196Open ↗
▸Cost, Insurance & Ownership15
▸BISCOST AFFIDAVIT15
07/19/2019321428745Open ↗
07/19/2019321428745Open ↗
05/01/2019340665827Open ↗
Showing 3 of 15 on file for this type
▸Filing & Intake Forms12
▸BISADDITIONAL INFORMATION5
06/04/2014320475099Open ↗
02/01/2014320475099Open ↗
03/29/2012320328196Open ↗
Showing 3 of 5 on file for this type
▸BISEFILING COVER SHEET4
11/30/2016321486110Open ↗
08/01/2016321428745Open ↗
05/10/2012320475099Open ↗
Showing 3 of 4 on file for this type
▸BISBOROUGH INTAKE FORM2
07/19/2019321428745Open ↗
03/05/2018321486110Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET1
05/01/2019340665827Open ↗
▸Other Documents2
▸BISCONSTRUCTION - SUPPORTING DOCUMENTATION1
09/11/2018321428745Open ↗
▸DOB NOWBSA Meeting Minutes/BSA Resolution1
08/13/2026B00071804-I1Open ↗