HPD08/04/2026§ 27-2056.6 ADM CODE - CORRECT THE LEAD-BASED PAINT HAZARD - PRESUMED LEAD PAINT THAT IS PEELING OR ON A DETERIORATED SUBSURFACE USING WORK PRACTICES SET FORTH IN 28 RCNY §11-06(B)(2) NORTH WALL IN THE PRIVATE HALLWAY LOCATED AT APT 4L, 4th STORY, 1st APARTMENT FROM SOUTH AT WEST
HPD08/04/2026§ 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) ( C) MDL AND 28 RCNY §25-171: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MISSING OR DEFECTIVE REPALCE WITH FIRE RATED DOOR IN THE ENTRANCE LOCATED AT APT 4L, 4th STORY, 1st APARTMENT FROM SOUTH AT WEST
HPD08/04/2026§ 27-2043.1 HMC INSTALL THE MISSING OR REPAIR/REPLACE THE DEFECTIVE WINDOW GUARD(S) IN ACCORDANCE WITH THE SPECIFICATIONS OF THE NEW YORK CITY HEALTH CODE SECTION 24 RCNY CHAPTER 12. WG TO INSTALL = 0; WG TO REPLACE = 0; WG TO REPAIR = 2; IN THE ENTIRE APARTMENT LOCATED AT APT 4L, 4th STORY, 1st APARTMENT FROM SOUTH AT WEST
HPD08/04/2026HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF MICE IN THE ENTIRE APARTMENT LOCATED AT APT 4L, 4th STORY, 1st APARTMENT FROM SOUTH AT WEST
HPD08/04/2026§ 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR BULDING, CRACKS AT CEILING AND AT ALL WALLS IN THE KITCHEN LOCATED AT APT 4L, 4th STORY, 1st APARTMENT FROM SOUTH AT WEST
HPD08/04/2026§ 27-2005 ADM CODE REPAIR THE ROOF SO THAT IT WILL NOT LEAK AT CEILING IN THE PRIVATE HALLWAY LOCATED AT APT 4L, 4th STORY, 1st APARTMENT FROM SOUTH AT WEST
HPD08/04/2026§ 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR CRACKS, CHIPPING AT CEILINGS AND NORTH WALL IN THE PRIVATE HALLWAY LOCATED AT APT 4L, 4th STORY, 1st APARTMENT FROM SOUTH AT WEST
HPD08/04/2026§ 27-2056.6 ADM CODE - CORRECT THE LEAD-BASED PAINT HAZARD - PRESUMED LEAD PAINT THAT IS PEELING OR ON A DETERIORATED SUBSURFACE USING WORK PRACTICES SET FORTH IN 28 RCNY §11-06(B)(2) CEILING IN THE KITCHEN LOCATED AT APT 4L, 4th STORY, 1st APARTMENT FROM SOUTH AT WEST
HPD04/08/2026§ 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT EAST WALL, SOUTH WALL IN THE 3rd ROOM FROM EAST AT SOUTH LOCATED AT APT 4L, 4th STORY, 1st APARTMENT FROM SOUTH AT WEST
HPD04/08/2026§ 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING IN THE KITCHEN LOCATED AT APT 4L, 4th STORY, 1st APARTMENT FROM SOUTH AT WEST
HPD04/08/2026§ 27-2056.6 ADM CODE - CORRECT THE LEAD-BASED PAINT HAZARD - PAINT THAT TESTED POSITIVE FOR LEAD CONTENT AND THAT IS PEELING OR ON A DETERIORATED SUBSURFACE - USING WORK PRACTICES SET FORTH IN 28 RCNY §11-06(B)(2) CEILING, EAST WALL, WEST WALL IN THE 2nd ROOM FROM EAST LOCATED AT APT 4L, 4th STORY, 1st APARTMENT FROM SOUTH AT WEST
HPD04/02/2026§ 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... GREATER THAN 10 SQ.FT AT CEILING, NORTH WALL, EAST WALL AND WEST WALL IN THE BATHROOM LOCATED AT APT 4L, 4th STORY, 1st APARTMENT FROM SOUTH AT WEST
DOB11/14/2025VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION
DOB11/14/2025VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION
HPD05/26/2025567 (C) § 27-2017, 27-2017.1, 27-2017.4, 27-2017.5, 27-2017.8, 27-2019, 27-2021 HMC: ABATE THE NUISANCE CONSISTING OF EVIDENCE OF RATS AND ALL UNDERLYING CAUSES CREATING THE PEST INFESTATIONS, BY USING INTEGRATED PEST MANAGEMENT (IPM), ELIMINATE ALL BURROW ENTRY AND PASSAGEWAYS, PEST NESTS, HOLES, GAPS OR CRACKS IN WALLS, CEILINGS, FLOORS, FIXING LEAKS AND MANAGING GARBAGE IN PUBLIC AREAS. EVIDENCE FOUND AT LIVE RATS YARD
DOB06/20/2023VIOLATION ISSUED-FAILURE TO FILE 2018 EXTERNAL LOW PRESSURE INSPECTION
ECB12/04/2017WORK W/O A PERMIT. ILLUMINATED BUSINESS ACCESSORY AWNING APPROX SIZE 30X4FT READS HARVEST DELI INSTALLED W/O A PERMIT. REMEDY: OBTAIN PERMIT OR RESTORE PREMISES TO PRIOR LEGAL CONDITION.$516 due
DOB07/22/2017THE DEPARTMENT OF BUILDINGS INTENDS TO REVOKE ALL PLUMBING APPROVALS A ND PERMITS UNDER PLUMBING APPLICATION #321392337 DUE TO SUSPENSION OF LICENSE.STOP ALL PLUMBING WORK IMMEDIATELY EXCEPT TO MAKE SITE SAFE
DOB07/22/2017V-DOB VIOLATION - ACTIVE