← Back
Elevator apt, fireproof without stores
Drew-hamilton (NYCHA)
2430 ADAM C POWELL BLVD · BIN 1086083
💬 Discuss this project
1964Year Built
21Stories
D3Building Class
R7-2Zoning
212,887 sfGross Floor Area
238Units
LL97 Covered5 Open Violations ▸FISP: UNSAFE
Elevator apt, fireproof without stores · Owner of record: NYC HOUSING AUTHORITY · 34,970 sf lot · 6.09 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralPlumbing
Roof5p · 1 filing · 20 docs
Bulkhead7p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
NYCHA2107/08/2026
NYC HOUSING AUTHORITY603/22/2026
NYCHA 99203/22/2026
TECHNICO CONSTRUCTION SER103/22/2026
NEW YORK CITY HOUSING AUTHORITY303/21/2026
NY HOUSING AUTHORITY103/21/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
PURCELL EVERETT ARCHITECTS1603/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
ZORIA HOUSING, LLCGeneral Contractor507/08/2026
RICHARDS PLUM & HTG CO,INGeneral Contractor407/08/2026
MNK ENTERPRISES LLCGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
TECTONIC ENGINEERING CONS106402/05/2024
RLM ENGINEERING PLLC6913108/14/2023
COWI CONSULTING INC.1260205/11/2023
Building Lifecycle
All (83)Filed (13)Permit Issued (6)Signed Off (4)Facade (FISP) (12)Violation (18)Special Inspection (30)
07/24/2025
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
01/22/2025
Signed off — Alteration
Bldg#4 Roofing replacement and railing removal with associated bulkhead alterations. No change in use, egress or occupancy.
M00615748-S1
12/13/2024
Signed off — Alteration
Bldg#4 Roofing replacement and railing removal with associated bulkhead alterations. No change in use, egress or occupancy.
M00615748-I1
03/15/2024
Signed off — Alteration
INSTALLATION OF TEMPORARY SIDEWALK SHED AS PER PLANS. SIDEWALK SHED SHALL COMPLY WITH CHAPTER 33 OF THE 2022 NYC BUILDING CODE. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
M00890658-I1
03/15/2024
Signed off — Alteration
INSTALLATION OF TEMPORARY CHAIN LINK FENCE AS PER PLANS. CHAIN LINK FENCE SHALL COMPLY WITH CHAPTER 33 OF THE 2022 NYC BUILDING CODE. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
M00890662-I1
02/05/2024
Filed — Alteration
Bldg#4 Roofing replacement and railing removal with associated bulkhead alterations. No change in use, egress or occupancy.
M00615748-P5
02/05/2024
Special inspection requirement — Masonry
GEORGE GHEBRYAL
02/05/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
GEORGE GHEBRYAL
02/05/2024
Special inspection requirement — Final
GEORGE GHEBRYAL
02/05/2024
Special inspection requirement — Insulation placement and R values
GEORGE GHEBRYAL
02/05/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
GEORGE GHEBRYAL
02/05/2024
Special inspection requirement — Masonry
GEORGE GHEBRYAL
02/05/2024
Special inspection requirement — Final
GEORGE GHEBRYAL
02/05/2024
Special inspection requirement — Insulation placement and R values
GEORGE GHEBRYAL
11/01/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
10/26/2023
Filed — Alteration
Bldg#4 Roofing replacement and railing removal with associated bulkhead alterations. No change in use, egress or occupancy.
M00615748-P4
10/25/2023
Special inspection requirement — Final
GEORGE GHEBRYAL
10/25/2023
Special inspection requirement — Insulation placement and R values
GEORGE GHEBRYAL
10/25/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
GEORGE GHEBRYAL
10/25/2023
Special inspection requirement — Masonry
GEORGE GHEBRYAL
09/28/2023
Filed — Alteration
INSTALLATION OF TEMPORARY SIDEWALK SHED AS PER PLANS. SIDEWALK SHED SHALL COMPLY WITH CHAPTER 33 OF THE 2022 NYC BUILDING CODE. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
M00890658-P1
09/14/2023
Permit issued — General Construction
M00615748-I1-GC
09/14/2023
Permit issued — Structural
M00615748-S1-ST
08/23/2023
Permit issued — Mechanical Systems
M00909269-I1-MS
08/17/2023
Permit issued — Construction Fence
M00909269-S1-FN
08/14/2023
Filed — Alteration
Replacing existing underground steam piping and underground condensate return piping as per plans filed herewith.
M00909269-S1
08/14/2023
Filed — Alteration
Replacing existing underground steam piping and underground condensate return piping as per plans filed herewith.
M00909269-I1
08/09/2023
Special inspection requirement — Tenant Protection Plan Compliance
Ronald Merhige
08/09/2023
Special inspection requirement — Energy Code Compliance Inspections
Ronald Merhige
08/09/2023
Special inspection requirement — HVAC-R and service water piping design and insulation
Ronald Merhige
07/25/2023
Special inspection requirement — Mechanical Systems
Ronald Merhige
07/25/2023
Special inspection requirement — Final
Ronald Merhige
06/16/2023
Permit issued — Sidewalk Shed
M00890658-I1-SH
06/15/2023
Filed — Alteration
INSTALLATION OF TEMPORARY SIDEWALK SHED AS PER PLANS. SIDEWALK SHED SHALL COMPLY WITH CHAPTER 33 OF THE 2022 NYC BUILDING CODE. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
M00890658-I1
06/15/2023
Filed — Alteration
INSTALLATION OF TEMPORARY CHAIN LINK FENCE AS PER PLANS. CHAIN LINK FENCE SHALL COMPLY WITH CHAPTER 33 OF THE 2022 NYC BUILDING CODE. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
M00890662-I1
06/15/2023
Permit issued — Construction Fence
M00890662-I1-FN
05/16/2023
Filed — Alteration
Bldg#4 Roofing replacement and railing removal with associated bulkhead alterations. No change in use, egress or occupancy.
M00615748-P3
05/16/2023
Special inspection requirement — Final
GEORGE GHEBRYAL
05/16/2023
Special inspection requirement — Concrete - Cast-In-Place
GEORGE GHEBRYAL
05/16/2023
Special inspection requirement — Masonry
GEORGE GHEBRYAL
05/16/2023
Special inspection requirement — Structural Steel - Details
GEORGE GHEBRYAL
05/16/2023
Special inspection requirement — Structural Stability – Alterations of existing buildings
GEORGE GHEBRYAL
05/16/2023
Special inspection requirement — Post-installed Anchors
GEORGE GHEBRYAL
05/11/2023
Filed — Alteration
Bldg#4 Roofing replacement and railing removal with associated bulkhead alterations. No change in use, egress or occupancy.
M00615748-P2
05/09/2023
Special inspection requirement — Structural Stability – Alterations of existing buildings
GENARO VELEZ
05/09/2023
Special inspection requirement — Final
05/09/2023
Special inspection requirement — Concrete - Cast-In-Place
GENARO VELEZ
05/09/2023
Special inspection requirement — Masonry
GENARO VELEZ
05/09/2023
Special inspection requirement — Post-installed Anchors
GENARO VELEZ
05/09/2023
Special inspection requirement — Structural Steel - Details
GENARO VELEZ
05/08/2023
Special inspection requirement — Final
05/05/2023
Filed — Alteration
Bldg#4 Roofing replacement and railing removal with associated bulkhead alterations. No change in use, egress or occupancy.
M00615748-P1
04/12/2023
Cycle 9 facade report submitted
04/12/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
04/03/2023
Cycle 9 facade report signed — UNSAFE
02/22/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
02/17/2023
Cycle 9 facade inspection completed
01/25/2022
Filed — Alteration
Bldg#4 Roofing replacement and railing removal with associated bulkhead alterations. No change in use, egress or occupancy.
M00615748-S1
01/21/2022
Filed — Alteration
Bldg#4 Roofing replacement and railing removal with associated bulkhead alterations. No change in use, egress or occupancy.
M00615748-S2
01/19/2022
Filed — Alteration
Bldg#4 Roofing replacement and railing removal with associated bulkhead alterations. No change in use, egress or occupancy.
M00615748-I1
Latest 60 of 83 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offZORIA HOUSING, LLC09/14/2023
DOB NOWStructuralSigned-offZORIA HOUSING, LLC09/14/2023
DOB NOWMechanical SystemsPermit IssuedRICHARDS PLUM & HTG CO,IN08/23/2023
DOB NOWConstruction FencePermit IssuedRICHARDS PLUM & HTG CO,IN08/17/2023
DOB NOWSidewalk ShedSigned-offMNK ENTERPRISES LLC06/16/2023
DOB NOWConstruction FenceSigned-offZORIA HOUSING, LLC06/15/2023
BISOTISSUEDTECHNICO CONSTRUCTION03/29/2011
BISEQISSUEDTECHNICO CONSTRUCTION03/24/2011
BISEQISSUEDTECHNICO CONSTRUCTION03/24/2011
BISOTISSUEDTECHNICO CONSTRUCTION07/15/2010
BISEQISSUEDTECHNICO CONSTRUCTION04/29/2010
BISPLISSUEDPERFORMANCE PLBG11/21/2006
1 project · most recent 02/05/2024
Storm
FiledStatusContractorScope
02/05/2024——Storm
5 projects · most recent 03/30/2026
General Wiring
FiledStatusContractorScope
03/30/2026CompleteSEZEKCOL ELECTRIC INCGeneral Wiring
06/14/2023CompleteQ.Y. ELECTRIC, INC—
05/11/2023CompleteQ.Y. ELECTRIC, INC—
11/04/2020CompleteWEBSITE ELECTRIC CORP.—
09/09/2020CompleteLEONE ELECTRIC CO. INCGeneral Wiring
1 project · most recent 02/05/2024
Steel Concrete Masonry
FiledStatusContractorScope
02/05/2024Signed-offZORIA HOUSING, LLCSteel, Concrete, Masonry
1 project · most recent 08/14/2023
Fence
FiledStatusContractorScope
08/14/2023Permit IssuedRICHARDS PLUM & HTG CO,INFence
▾Special Inspection Requirements (DOB NOW) — 37
DateRequirementInspectorRole
02/05/2024MasonryGEORGE GHEBRYALspecial
02/05/2024Fire-Resistant Penetrations and JointsGEORGE GHEBRYALspecial
02/05/2024FinalGEORGE GHEBRYALprogress
02/05/2024Insulation placement and R valuesGEORGE GHEBRYALenergy_progress
02/05/2024Fire-Resistant Penetrations and JointsGEORGE GHEBRYALspecial
02/05/2024MasonryGEORGE GHEBRYALspecial
02/05/2024FinalGEORGE GHEBRYALprogress
02/05/2024Insulation placement and R valuesGEORGE GHEBRYALenergy_progress
10/25/2023FinalGEORGE GHEBRYALprogress
10/25/2023Insulation placement and R valuesGEORGE GHEBRYALenergy_progress
10/25/2023Fire-Resistant Penetrations and JointsGEORGE GHEBRYALspecial
10/25/2023MasonryGEORGE GHEBRYALspecial
08/09/2023Tenant Protection Plan ComplianceRonald Merhigespecial
08/09/2023Energy Code Compliance InspectionsRonald Merhigeprogress
08/09/2023HVAC-R and service water piping design and insulationRonald Merhigeenergy_progress
07/25/2023Mechanical SystemsRonald Merhigespecial
07/25/2023FinalRonald Merhigeprogress
05/16/2023FinalGEORGE GHEBRYALprogress
05/16/2023Concrete - Cast-In-PlaceGEORGE GHEBRYALspecial
05/16/2023MasonryGEORGE GHEBRYALspecial
05/16/2023Structural Steel - DetailsGEORGE GHEBRYALspecial
05/16/2023Structural Stability – Alterations of existing buildingsGEORGE GHEBRYALspecial
05/16/2023Post-installed AnchorsGEORGE GHEBRYALspecial
05/09/2023Structural Stability – Alterations of existing buildingsGENARO VELEZspecial
05/09/2023Final—progress
Latest 25 of 37.
▾Documents — 115 on file (BIS + DOB NOW)
▸Plans & Drawings13
▸DOB NOWPlans/Sketch13
09/03/2026M00615748-P2Request digital key ↗
09/03/2026M00615748-P3Request digital key ↗
09/03/2026M00615748-P5Request digital key ↗
Showing 3 of 13 on file for this type
▸Applications & Permits15
▸BISPLAN / WORK APPROVAL APPLICATION10
08/16/2016122159804Open ↗
05/13/2016122159804Open ↗
11/06/2015122159804Open ↗
Showing 3 of 10 on file for this type
▸BISWORK PERMIT APPLICATION5
05/09/2011120330212Open ↗
03/31/2011120312839Open ↗
03/28/2011120334325Open ↗
Showing 3 of 5 on file for this type
▸Seals & Professional Certifications42
▸DOB NOWDPL-1: Design Professional Seal & Signature13
09/03/2026M00615748-P3Open ↗
09/03/2026M00615748-P1Open ↗
09/03/2026M00615748-P2Open ↗
Showing 3 of 13 on file for this type
▸DOB NOWProgress Inspector Seal & Signature10
09/01/2026M00615748-S1Open ↗
08/29/2026M00615748-P5Open ↗
08/29/2026M00615748-P5Open ↗
Showing 3 of 10 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION7
06/27/2013120334325Open ↗
11/21/2011120312839Open ↗
11/21/2011120312839Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature6
09/01/2026M00615748-S1Open ↗
08/29/2026M00615748-P5Open ↗
08/28/2026M00615748-I1Open ↗
Showing 3 of 6 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST3
05/24/2010120330212Open ↗
05/05/2010120334325Open ↗
04/19/2010120312839Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM3
05/24/2010120330212Open ↗
05/05/2010120334325Open ↗
04/19/2010120312839Open ↗
▸Trade Schedules & Equipment1
▸BISFA - FDNY APPROVAL : FD-FAA1
09/01/2017122159804Open ↗
▸Environmental & Asbestos7
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER2
05/24/2010120330212Open ↗
05/05/2010120334325Open ↗
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form2
09/03/2026M00615748-I1Open ↗
09/03/2026M00615748-S1Open ↗
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'1
05/25/2011120699930Open ↗
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
11/06/2015122159804Open ↗
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/13/2026M00909269-I1Open ↗
▸Energy Compliance1
▸DOB NOWEN2: As Built Energy Analysis.1
08/13/2026M00615748-I1Open ↗
▸Approvals, Objections & Sign-offs24
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter13
09/03/2026M00615748-P4Open ↗
09/03/2026M00615748-P3Open ↗
09/03/2026M00615748-P2Open ↗
Showing 3 of 13 on file for this type
▸BISADMINISTRATIVE OBJECTIONS4
05/26/2011120699930Open ↗
05/24/2010120330212Open ↗
05/06/2010120334325Open ↗
Showing 3 of 4 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST3
09/26/2017122159804Open ↗
06/27/2013120334325Open ↗
10/11/2011120330212Open ↗
▸BISLETTERS - SUPPORTING DOCUMENTATION2
06/27/2013120334325Open ↗
10/11/2011120330212Open ↗
▸DOB NOWDEP Variance (V5) letter2
09/03/2026M00615748-I1Open ↗
09/03/2026M00615748-S1Open ↗
▸Cost, Insurance & Ownership3
▸BISCOST AFFIDAVIT3
11/06/2015122159804Open ↗
05/25/2011120699930Open ↗
04/19/2010120312839Open ↗
▸Filing & Intake Forms6
▸BISEFILING COVER SHEET5
11/06/2015122159804Open ↗
05/26/2011120699930Open ↗
05/24/2010120330212Open ↗
Showing 3 of 5 on file for this type
▸BISBOROUGH INTAKE FORM1
09/26/2017122159804Open ↗
▸Other Documents3
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION3
11/06/2015122159804Open ↗
05/09/2011120330212Open ↗
07/16/2010120312839Open ↗