BuildNYC
Elevator apt, semi-fireproof without stores
2436 WALTON AVENUE
BRONX · BIN 2130756
💬 Discuss this project
2021Year Built
9Stories
D1Building Class
R8Zoning
22,951 sfGross Floor Area
35Units
Rent Stabilized74 Active Violations 70 unresolved · 4 paperwork only ▸
Elevator apt, semi-fireproof without stores · Owner of record: 2434-2436 Walton Avenue · 3,969 sf lot · 5.78 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingFire ProtectionEquipmentGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Whole building & multi-floor projectsLati Properties LLC3 filings
CellarLati Properties LLC1 filing
Site & exteriorConstruction fence and sidewalk shed3 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Lati Properties4407/08/2026
2436 Walton Ave703/21/2026
2434-2436 Walton Avenue303/22/2026
1602-1610 Avenue S303/21/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
01/09/2020$585K—— → —— not available
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Bayside Associates1005/30/2023
Jian Engineering508/31/2022
Jimenez Building Consulting606/09/2022
NY Acorn Engineering310/04/2021
Construction Management & Safety Con101/27/2020
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
JRL Skyline2403/21/2026
SD Design Studio403/21/2026
H Z Building NY203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
99 ConstructionScaffold1203/21/2026
99 ConstructionGeneral Contractor807/08/2026
Winway DevelopmentScaffold807/08/2026
RRP PlumbingFire Protection407/08/2026
Lati ConstructionGeneral Contractor407/08/2026
Tri State Plumbing & HeatingPlumbing310/04/2026
A C Morgan ElectricGeneral Contractor203/22/2026
Dynamic Plumbing & SprinklerFire Protection207/08/2026
Classic Consulting GroupScaffold107/08/2026
Dynamic Plumbing & SprinklerPlumbing107/08/2026
Xiucheng LiElectrical103/21/2026
Weidner DouglasGeneral Contractor103/21/2026
Tri State Plumbing & HeatingGeneral Contractor103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Jian Engineering7397905/30/2023
M. International Engineering3129403/30/2023
SD Testing & Inspection S7010201/24/2022
Building Lifecycle
All (156)Filed (25)Permit Issued (24)Signed Off (7)Violation (60)Inspection (10)Special Inspection (30)
08/11/2026
Violation issued (HPD, open)
B
08/11/2026
Violation issued (HPD, open)
C
07/09/2026
Violation issued (HPD, open)
C
07/09/2026
Violation issued (HPD, open)
B
07/09/2026
Violation issued (HPD, open)
A
06/29/2026
Violation issued (HPD, open)
C
06/29/2026
Violation issued (HPD, open)
C
06/29/2026
Violation issued (HPD, open)
C
06/29/2026
Violation issued (HPD, open)
A
06/29/2026
Violation issued (HPD, open)
B
06/29/2026
Violation issued (HPD, open)
A
04/15/2026
Violation issued (HPD, closed)
B
04/15/2026
Violation issued (HPD, closed)
C
04/15/2026
Violation issued (HPD, closed)
C
04/15/2026
Violation issued (HPD, closed)
B
04/09/2026
Violation issued (ECB, closed)
Elevators
10/18/2025
Violation issued (HPD, open)
B
08/17/2025
Violation issued (HPD, open)
C
08/17/2025
Violation issued (HPD, open)
C
08/03/2025
Violation issued (HPD, open)
B
07/30/2025
Violation issued (ECB, open)
Elevators
04/09/2025
Violation issued (HPD, open)
B
04/09/2025
Violation issued (HPD, open)
B
04/09/2025
Violation issued (HPD, closed)
B
04/09/2025
Violation issued (HPD, open)
B
04/09/2025
Violation issued (HPD, open)
B
03/26/2025
Violation issued (HPD, open)
C
03/26/2025
Violation issued (HPD, closed)
A
03/26/2025
Violation issued (HPD, open)
C
03/26/2025
Violation issued (HPD, open)
C
03/26/2025
Violation issued (HPD, open)
B
03/26/2025
Violation issued (HPD, open)
B
03/26/2025
Violation issued (HPD, open)
B
03/26/2025
Violation issued (HPD, open)
B
03/26/2025
Violation issued (HPD, closed)
B
10/04/2024
Violation issued (ECB, open)
Elevators
06/25/2024
Violation issued (ECB, open)
Elevators
03/20/2024
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
01/17/2024
Violation issued (ECB, open)
Boilers
08/10/2023
Signed off — Alteration
INSTALLATION OF WATER/SANITARY, STORM & GAS SYSTEM AND RELATED PIPING AS SHOWN ON DRAWINGS FILED HEREWITH. IN CONJUNCTION WITH NB #210180971.
X00539858-I1
06/20/2023
Signed off — Alteration
INSTALLATION OF COMBINED SPRINKLER w/ STANDPIPE SYSTEM AND RELATED PIPING AS SHOWN ON DRAWINGS FILED HEREWITH. IN CONJUNCTION WITH NB #210180971
X00536340-I1
06/01/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
JIAN DENG
05/30/2023
Filed — Alteration
INSTALLATION OF WATER/SANITARY, STORM & GAS SYSTEM AND RELATED PIPING AS SHOWN ON DRAWINGS FILED HEREWITH. IN CONJUNCTION WITH NB #210180971.
X00539858-P5
05/25/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
JIAN DENG
04/18/2023
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
04/13/2023
Inspection — Pass-Final SP - Up to 3 Requested Floors
Pass
View inspection ↗
03/31/2023
Special inspection requirement — Standpipe Systems
NANIK MASSAND
03/31/2023
Special inspection requirement — Sprinkler Systems
NANIK MASSAND
03/30/2023
Filed — Alteration
INSTALLATION OF COMBINED SPRINKLER w/ STANDPIPE SYSTEM AND RELATED PIPING AS SHOWN ON DRAWINGS FILED HEREWITH. IN CONJUNCTION WITH NB #210180971
X00536340-P2
03/22/2023
Inspection — Pass-Final SD - Up to 3 Requested Floors
Pass
View inspection ↗
03/22/2023
Inspection — Pass-Final SP - Up to 9 Requested Floors
Pass
View inspection ↗
03/18/2023
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
03/18/2023
Inspection — Certified StandPipe-SD-Piping-Hydrostatic Test
Certified
View inspection ↗
03/17/2023
Permit issued — Standpipe
X00536340-I1-EW-SD
03/17/2023
Permit issued — Sprinklers
X00536340-I1-EW-SP
03/15/2023
Permit issued — Plumbing
X00539858-I1-PL
02/28/2023
Filed — Alteration
INSTALLATION OF WATER/SANITARY, STORM & GAS SYSTEM AND RELATED PIPING AS SHOWN ON DRAWINGS FILED HEREWITH. IN CONJUNCTION WITH NB #210180971.
X00539858-P3
02/28/2023
Filed — Alteration
INSTALLATION OF COMBINED SPRINKLER w/ STANDPIPE SYSTEM AND RELATED PIPING AS SHOWN ON DRAWINGS FILED HEREWITH. IN CONJUNCTION WITH NB #210180971
X00536340-P1
02/28/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
JIAN DENG
02/23/2023
Signed off — Alteration
X00304604-I1
Latest 60 of 156 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWStandpipeSigned-offCitywide Plumbing, Heating & Sprinkler03/17/2023
DOB NOWSprinklersSigned-offCitywide Plumbing, Heating & Sprinkler03/17/2023
DOB NOWPlumbingSigned-offCitywide Plumbing & Heating & SPKLS03/15/2023
DOB NOWPlumbingSigned-offDW Plumbing12/08/2022
DOB NOWStructuralSigned-offSong Dong08/30/2022
DOB NOWConstruction FenceSigned-offSong Dong08/28/2022
DOB NOWStandpipeSigned-offRalph W. Landolfi JR01/20/2022
DOB NOWSprinklersSigned-offRalph W. Landolfi JR01/20/2022
DOB NOWPlumbingSigned-offDW Plumbing01/17/2022
DOB NOWSupport of ExcavationSigned-offSong Dong01/06/2022
DOB NOWSidewalk ShedSigned-offSong Dong12/22/2021
DOB NOWSidewalk ShedSigned-offSong Dong10/18/2021
DOB NOWStructuralSigned-offSong Dong10/18/2021
DOB NOWConstruction FenceSigned-offSong Dong10/05/2021
DOB NOWSidewalk ShedSigned-offWinway Development07/20/2021
DOB NOWSprinklersSigned-offRalph W. Landolfi JR07/09/2021
DOB NOWStandpipeSigned-offRalph W. Landolfi JR07/09/2021
DOB NOWPlumbingSigned-offJW Development Holdings06/25/2021
DOB NOWStructuralSigned-offLati Construction06/14/2021
DOB NOWSupported ScaffoldSigned-offClassic Consulting Group06/04/2021
DOB NOWConstruction FenceSigned-offWinway Development05/14/2021
DOB NOWSidewalk ShedSigned-offWinway Development04/19/2021
DOB NOWStructuralSigned-offLati Construction03/29/2021
DOB NOWConstruction FenceSigned-offWinway Development05/12/2020
BISEQISSUEDClassic Consulting Group09/19/2022
BIS—ISSUED99 Construction09/02/2022
BIS—ISSUED99 Construction10/20/2021
BIS—ISSUED99 Construction10/20/2021
BIS—ISSUED5D Architect and Engineering08/05/2021
BISEQISSUEDClassic Consulting Group07/29/2021
BIS—ISSUEDLati Construction03/10/2021
BIS—ISSUEDLati Construction03/10/2021
BIS—ISSUEDH&Z Building Consulting I01/11/2021
5 projects · most recent 05/11/2023
General Wiring
FiledStatusContractorScope
05/11/2023CompleteA.C. Morgan ElectricGeneral Wiring
10/20/2021CompleteTitan Electrical & Elev Contracting—
06/09/2021CompleteRichard NeuGeneral Wiring
05/24/2021CompleteA.C. Morgan ElectricGeneral Wiring
05/13/2021CompleteA.C. Morgan Electric—
▾Field Inspections (DOB CAP) — 10
DateTypeResultReport
04/18/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
04/13/2023Pass-Final SP - Up to 3 Requested FloorsPassView ↗
03/22/2023Pass-Final SD - Up to 3 Requested FloorsPassView ↗
03/22/2023Pass-Final SP - Up to 9 Requested FloorsPassView ↗
03/18/2023Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
03/18/2023Certified StandPipe-SD-Piping-Hydrostatic TestCertifiedView ↗
12/13/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
11/22/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
10/29/2021Pass-Final PL - Up to 9 Requested FloorsPassView ↗
10/13/2021Pass-Final PL - Up to 9 Requested FloorsPassView ↗
▾Special Inspection Requirements (DOB NOW) — 34
DateRequirementInspectorRole
06/01/2023Fire-Resistant Penetrations and JointsJIAN DENGspecial
05/25/2023Fire-Resistant Penetrations and JointsJIAN DENGspecial
03/31/2023Standpipe SystemsNANIK MASSANDspecial
03/31/2023Sprinkler SystemsNANIK MASSANDspecial
02/28/2023Fire-Resistant Penetrations and JointsJIAN DENGspecial
11/10/2022Fire-Resistant Penetrations and JointsNANIK MASSANDspecial
08/31/2022Concrete - Cast-In-PlaceJIAN DENGspecial
08/31/2022MasonryJIAN DENGspecial
08/31/2022FinalJIAN DENGprogress
08/31/2022Sprayed fire-resistant materialsJIAN DENGspecial
08/31/2022Structural Stability – Alterations of existing buildingsJIAN DENGspecial
08/31/2022Energy Code Compliance InspectionsJIAN DENGprogress
06/09/2022FinalJIAN DENGprogress
04/28/2022FinalJIAN DENGprogress
04/08/2022Structural Stability – Alterations of existing buildingsJIAN DENGspecial
04/08/2022FinalJIAN DENGprogress
04/08/2022Excavations - Sheeting, Shoring, and BracingJIAN DENGspecial
04/08/2022Structural Stability – Alterations of existing buildingsJIAN DENGspecial
04/08/2022Concrete - Cast-In-PlaceJIAN DENGspecial
04/08/2022MasonryJIAN DENGspecial
04/08/2022Sprayed fire-resistant materialsJIAN DENGspecial
04/08/2022Energy Code Compliance InspectionsJIAN DENGprogress
01/18/2022Concrete - Cast-In-PlaceXIUCHENG LIspecial
01/18/2022MasonryXIUCHENG LIspecial
01/18/2022Sprayed fire-resistant materialsXIUCHENG LIspecial
Latest 25 of 34.
▾Documents — 255 on file (BIS + DOB NOW)
▸Plans & Drawings24
▸DOB NOWPlans/Sketch18
08/25/2026X00489439-P1Request digital key ↗
08/25/2026X00536340-P2Request digital key ↗
08/25/2026X00536340-P1Request digital key ↗
Showing 3 of 18 on file for this type
▸DOB NOWPlans/Sketch - Structural5
08/25/2026X00455813-I1Request digital key ↗
08/25/2026X00455813-P3Request digital key ↗
08/25/2026X00455813-P4Request digital key ↗
Showing 3 of 5 on file for this type
▸DOB NOWPlans/Sketch - Construction Fence1
08/26/2026X00304604-I1Request digital key ↗
▸Applications & Permits31
▸BISPLAN / WORK APPROVAL APPLICATION18
07/28/2023210180971Open ↗
04/10/2023210180971Open ↗
03/23/2023210180971Open ↗
Showing 3 of 18 on file for this type
▸BISWORK PERMIT APPLICATION10
09/06/2022210180971Open ↗
10/25/2021210180971Open ↗
10/25/2021210180971Open ↗
Showing 3 of 10 on file for this type
▸BISPLAN - WORK & PERMITS - SUPPPORTING DOCUMENTATION2
07/14/2023210180971Open ↗
11/17/2021210180971Open ↗
▸BISPLAN - WORK & PERMITS - SUPPPORTING DOCUMENTATION1
09/06/2022210180971Open ↗
▸Zoning, Tax Lot & Property Records7
▸BISZONING EXHIBIT I: CERTIFICATION2
08/18/2021220740465Open ↗
09/03/2020210180971Open ↗
▸BISTAX LOT: TENTATIVE LOT NUMBER ISSUED1
09/03/2020210180971Open ↗
▸BISZONING EXHIBIT III:DESC. & OWNRSHP.STMNT1
09/03/2020210180971Open ↗
▸BISVERIFY TAX LOT1
11/16/2022210180971Open ↗
▸BISCO OBJ: VERIFY ADDRESS-TOPO STAMP1
11/16/2022210180971Open ↗
▸BISZONING DIAGRAM1
10/05/2020210180971Open ↗
▸Seals & Professional Certifications52
▸DOB NOWDPL-1: Design Professional Seal & Signature24
08/26/2026X00304604-I1Open ↗
08/25/2026X00489439-P1Open ↗
08/25/2026X00536340-I1Open ↗
Showing 3 of 24 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature17
10/08/2026X00489439-P1Open ↗
09/28/2026X00455813-P2Open ↗
09/25/2026X00539858-P1Open ↗
Showing 3 of 17 on file for this type
▸DOB NOWProgress Inspector Seal & Signature8
09/28/2026X00455813-P2Open ↗
09/02/2026X00455813-P4Open ↗
09/02/2026X00455813-P4Open ↗
Showing 3 of 8 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT1
06/18/2021240306067Open ↗
▸BISAPPLICANT OWNER SIGNATURE1
09/08/2021240299958Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
06/18/2021240306067Open ↗
▸Trade Schedules & Equipment6
▸BISWATER CUT-OFF1
01/11/2021220735186Open ↗
▸BISHVAC & SERVICE WATER HEATING EQUIPMENT1
08/10/2023210180971Open ↗
▸BISELECTRIC CUT-OFF1
01/11/2021220735186Open ↗
▸BISSEWER CUT-OFF1
01/11/2021220735186Open ↗
▸BISHVAC & SERVICE WATER HEATING SYSTEM CONTROLS1
08/10/2023210180971Open ↗
▸BISSPRINKLER SYSTEMS1
02/27/2023210180971Open ↗
▸Safety & Tenant Protection11
▸BISEXCAVATION OR DEMOLITION: 5-DAY NOTICE6
01/11/2021220735186Open ↗
01/11/2021220735186Open ↗
01/11/2021220735186Open ↗
Showing 3 of 6 on file for this type
▸BISSTREET TREE CHECKLIST3
09/08/2021240299958Open ↗
10/05/2020210180971Open ↗
06/16/2020210180971Open ↗
▸BISDEMOLITION SUBMITTAL CERTIFICATION FORM1
01/11/2021220735186Open ↗
▸BISSTREET TREE SUPPORTING DOCUMENT1
03/18/2021210180971Open ↗
▸Energy Compliance11
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY3
04/11/2022210180971Open ↗
04/11/2022210180971Open ↗
10/05/2020210180971Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS2
03/18/2021210180971Open ↗
03/18/2021210180971Open ↗
▸BISAIR SEALING AND INSULATION - VISUAL1
08/10/2023210180971Open ↗
▸BISINTERIOR LIGHTING POWER1
08/10/2023210180971Open ↗
▸BIS* DUCT LEAKAGE TESTING1
08/10/2023210180971Open ↗
▸BISFENESTRATION U-FACTOR & PRODUCT RATING1
08/10/2023210180971Open ↗
▸BISFENESTRATION AREAS1
08/10/2023210180971Open ↗
▸BISINSULATION PLACEMENT & R VALUES1
08/10/2023210180971Open ↗
▸Inspections & Test Reports20
▸BISTECHNICAL REPORT: RESPONSIBILITY7
09/19/2022240306067Open ↗
09/19/2022240306067Open ↗
04/08/2022210180971Open ↗
Showing 3 of 7 on file for this type
▸BISTECHNICAL REPORT: CONCRETE/TEST CYLINDER3
02/14/2022210180971Open ↗
02/14/2022210180971Open ↗
03/18/2021210180971Open ↗
▸BISTECHNICAL REPORT: SOIL INSPECTION3
05/11/2022210180971Open ↗
10/05/2020210180971Open ↗
10/05/2020210180971Open ↗
▸BISSUBSURFACE / SOILS-FILL PLACEMENT IN-PLACE DENSITY1
02/27/2023210180971Open ↗
▸BISCONCRETE - CAST-IN-PLACE1
02/27/2023210180971Open ↗
▸BISTR2: CONCRETE FIELD TESTING TECHNICAL REPORT1
09/13/2023210180971Open ↗
▸BISFIRE-RESISTANT PENETRATIONS AND JOINTS (FIRESTOP)1
02/27/2023210180971Open ↗
▸BISFIRE-RESISTIVE RATED CONSTRUCTION1
02/27/2023210180971Open ↗
▸BISFOOTING AND FOUNDATION INSPECTION1
02/27/2023210180971Open ↗
▸BISMASONRY1
02/27/2023210180971Open ↗
▸Approvals, Objections & Sign-offs27
▸BISLETTERS - SUPPORTING DOCUMENTATION18
11/17/2021210180971Open ↗
09/15/2021220740465Open ↗
08/18/2021220740465Open ↗
Showing 3 of 18 on file for this type
▸BISSCHEDULE A - OCCUPANCY / USE4
03/23/2023210180971Open ↗
03/17/2023210180971Open ↗
05/20/2021210180971Open ↗
Showing 3 of 4 on file for this type
▸BISSUPERSEDING LETTER2
10/25/2021210180971Open ↗
08/11/2021210180971Open ↗
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST1
09/19/2022240306067Open ↗
▸BISTAP LETTER - DOM SVC : DEP-DOM1
03/22/2023210180971Open ↗
▸BISLANDMARKS APPROVAL1
01/11/2021220735186Open ↗
▸Cost, Insurance & Ownership5
▸BISPROJECT-SPECIFIC GL INSURANCE5
09/06/2022210180971Open ↗
10/25/2021210180971Open ↗
08/11/2021210180971Open ↗
Showing 3 of 5 on file for this type
▸Filing & Intake Forms18
▸BISADDITIONAL INFORMATION11
07/14/2023210180971Open ↗
07/14/2023210180971Open ↗
03/02/2023210180971Open ↗
Showing 3 of 11 on file for this type
▸BISBOROUGH INTAKE FORM4
09/06/2022210180971Open ↗
10/25/2021210180971Open ↗
03/18/2021210180971Open ↗
Showing 3 of 4 on file for this type
▸BISEFILING COVER SHEET2
08/18/2021220740465Open ↗
10/16/2020220735186Open ↗
▸BISBPP: CHECKLIST IN LIEU OF PLANS-ALT31
09/08/2021240299958Open ↗
▸Other Documents12
▸BISPLOT DIAGRAM2
09/15/2021220740465Open ↗
09/03/2020210180971Open ↗
▸DOB NOWPlot Diagram2
08/13/2026X00489439-P1Open ↗
08/13/2026X00489439-I1Open ↗
▸BISSHUTOFF DAMPERS1
08/10/2023210180971Open ↗
▸BISSUSTAINABLE ROOF ZONE FORM1
09/03/2020210180971Open ↗
▸BISLOWEST FLOOR ELEVATION1
02/27/2023210180971Open ↗
▸BISEXTERIOR INSULATION AND FINISH SYSTEMS (EIFS)1
02/27/2023210180971Open ↗
▸BISVESTIBULES1
08/10/2023210180971Open ↗
▸BISMAINTENANCE INFORMATION1
08/10/2023210180971Open ↗
▸BISRECORDS MGMT FEE PAYMENT RECEIPT1
09/15/2021220740465Open ↗
▸DOB NOWAdjoining Owners Notification1
08/13/2026X00489439-I1Open ↗