← Back
Primarily 5-6 family with 1 store or office
2438 NOSTRAND AVENUE
BROOKLYN · BIN 3207874
💬 Discuss this project
1931Year Built
3Stories
S5Building Class
R6Zoning
5,040 sfGross Floor Area
6Units
Rent Stabilized47 Open Violations ▸FDNY Report ↗
Primarily 5-6 family with 1 store or office · Owner of record: PARNASAH TOVAH REALTY LLC · 2,100 sf lot · 2.4 FAR built · Flood zone X
Locations of Work
ArchitectureMechanical
Cellar2p · 1 filing · 20 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
M B KIM ARCHITECT P C403/15/2022
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
WASOFF PLBG & UTILITY COPlumbing307/08/2026
M.B.KIM,ARCHITECT,P.CGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
M B KIM ARCHITECT P C4257403/15/2022
Building Lifecycle
All (81)Filed (4)Permit Issued (4)Signed Off (2)Violation (60)Inspection (1)Special Inspection (10)
05/05/2026
Violation issued (HPD, open)
A
11/18/2025
Violation issued (HPD, open)
I
04/11/2024
Violation issued (HPD, closed)
A
12/01/2023
Violation issued (HPD, closed)
C
12/01/2023
Violation issued (HPD, open)
C
12/01/2023
Violation issued (HPD, closed)
B
12/01/2023
Violation issued (HPD, closed)
B
12/01/2023
Violation issued (HPD, closed)
A
12/01/2023
Violation issued (HPD, closed)
C
12/01/2023
Violation issued (HPD, closed)
B
12/01/2023
Violation issued (HPD, closed)
B
12/01/2023
Violation issued (HPD, closed)
B
12/01/2023
Violation issued (HPD, closed)
B
03/24/2023
Violation issued (HPD, closed)
A
09/02/2022
Signed off — Alteration
REPLACE EXISTING GAS-FIRED HIGH PRESSURE STEAM BOILER WITH NEW GAS-FIRED HIGH PRESSURE STEAM BOILER AT NEW BOILER ROOM AT CELLAR. THE GENERAL CONSTRUCTION FOR NEW BOILER ROOM WAS FILED SEPARATE APPLICATION (JOB # B00676808-I1)
B00676808-I1
09/02/2022
Signed off — Alteration
REPLACE EXISTING GAS-FIRED HIGH PRESSURE STEAM BOILER WITH NEW GAS-FIRED HIGH PRESSURE STEAM BOILER AT NEW BOILER ROOM AT CELLAR. THE GENERAL CONSTRUCTION FOR NEW BOILER ROOM WAS FILED SEPARATE APPLICATION (JOB # B00676808-I1)
B00676808-S1
08/25/2022
Inspection — Pass-Final Boiler Equipment Inspection
Pass
View inspection ↗
08/18/2022
Permit issued — Boiler Equipment
B00676808-S1-BE
08/08/2022
Permit issued — Boiler Equipment
B00676808-S1-BE
03/16/2022
Special inspection requirement — Heating Systems
MOON KIM
03/16/2022
Special inspection requirement — HVAC-R and service water heating system controls
MOON KIM
03/16/2022
Special inspection requirement — HVAC-R and service water heating equipment
MOON KIM
03/16/2022
Special inspection requirement — Maintenance information
MOON KIM
03/15/2022
Filed — Alteration
REPLACE EXISTING GAS-FIRED HIGH PRESSURE STEAM BOILER WITH NEW GAS-FIRED HIGH PRESSURE STEAM BOILER AT NEW BOILER ROOM AT CELLAR. THE GENERAL CONSTRUCTION FOR NEW BOILER ROOM WAS FILED SEPARATE APPLICATION (JOB # B00676808-I1)
B00676808-P2
03/15/2022
Filed — Alteration
REPLACE EXISTING GAS-FIRED HIGH PRESSURE STEAM BOILER WITH NEW GAS-FIRED HIGH PRESSURE STEAM BOILER AT NEW BOILER ROOM AT CELLAR. THE GENERAL CONSTRUCTION FOR NEW BOILER ROOM WAS FILED SEPARATE APPLICATION (JOB # B00676808-I1)
B00676808-P1
03/14/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
MOON KIM
03/14/2022
Special inspection requirement — Heating Systems
MOON KIM
03/14/2022
Special inspection requirement — Final
MOON KIM
03/14/2022
Special inspection requirement — Maintenance information
MOON KIM
03/14/2022
Special inspection requirement — HVAC-R and service water heating equipment
MOON KIM
03/14/2022
Special inspection requirement — HVAC-R and service water heating system controls
MOON KIM
03/01/2022
Violation issued (HPD, closed)
I
03/01/2022
Violation issued (HPD, closed)
A
02/21/2022
Permit issued — Boiler Equipment
B00676808-S1-BE
02/17/2022
Permit issued — General Construction
B00676808-I1-GC
02/14/2022
Filed — Alteration
REPLACE EXISTING GAS-FIRED HIGH PRESSURE STEAM BOILER WITH NEW GAS-FIRED HIGH PRESSURE STEAM BOILER AT NEW BOILER ROOM AT CELLAR. THE GENERAL CONSTRUCTION FOR NEW BOILER ROOM WAS FILED SEPARATE APPLICATION (JOB # B00676808-I1)
B00676808-S1
02/12/2022
Filed — Alteration
REPLACE EXISTING GAS-FIRED HIGH PRESSURE STEAM BOILER WITH NEW GAS-FIRED HIGH PRESSURE STEAM BOILER AT NEW BOILER ROOM AT CELLAR. THE GENERAL CONSTRUCTION FOR NEW BOILER ROOM WAS FILED SEPARATE APPLICATION (JOB # B00676808-I1)
B00676808-I1
04/12/2021
Violation issued (HPD, closed)
A
03/16/2020
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
10/16/2019
Violation issued (HPD, closed)
C
09/26/2019
Violation issued (HPD, open)
C
09/19/2019
Violation issued (HPD, closed)
C
09/19/2019
Violation issued (HPD, closed)
B
09/19/2019
Violation issued (HPD, closed)
B
09/19/2019
Violation issued (HPD, open)
A
09/19/2019
Violation issued (HPD, open)
A
09/19/2019
Violation issued (HPD, open)
C
09/19/2019
Violation issued (HPD, open)
C
09/19/2019
Violation issued (HPD, open)
C
09/19/2019
Violation issued (HPD, open)
B
09/19/2019
Violation issued (HPD, open)
C
09/19/2019
Violation issued (HPD, open)
A
09/19/2019
Violation issued (HPD, open)
A
09/19/2019
Violation issued (HPD, open)
A
04/08/2018
Violation issued (HPD, closed)
C
04/08/2018
Violation issued (HPD, closed)
C
04/08/2018
Violation issued (HPD, open)
C
04/08/2018
Violation issued (HPD, open)
B
03/24/2018
Violation issued (HPD, open)
A
10/30/2017
Violation issued (HPD, open)
B
Latest 60 of 81 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWBoiler EquipmentSigned-offWASOFF PLBG & UTILITY CO08/18/2022
DOB NOWBoiler EquipmentSigned-offWASOFF PLBG & UTILITY CO08/08/2022
DOB NOWBoiler EquipmentSigned-offWASOFF PLBG & UTILITY CO02/21/2022
DOB NOWGeneral ConstructionSigned-offM.B.KIM,ARCHITECT,P.C02/17/2022
BISSPISSUEDRIGID PLBG CONTRACTORS IN07/30/2020
BISPLISSUEDRIGID PLUMBING CONT INC07/30/2020
BISBLISSUEDEXCEL PLBG & HTG05/31/2002
BISPLISSUEDEXCEL PLBG & HTG05/31/2002
Nothing on file for this building.
▾Field Inspections (DOB CAP) — 1
DateTypeResultReport
08/25/2022Pass-Final Boiler Equipment InspectionPassView ↗
▾Special Inspection Requirements (DOB NOW) — 10
DateRequirementInspectorRole
03/16/2022Heating SystemsMOON KIMspecial
03/16/2022HVAC-R and service water heating system controlsMOON KIMenergy_progress
03/16/2022HVAC-R and service water heating equipmentMOON KIMenergy_progress
03/16/2022Maintenance informationMOON KIMenergy_progress
03/14/2022Fire-Resistant Penetrations and JointsMOON KIMspecial
03/14/2022Heating SystemsMOON KIMspecial
03/14/2022FinalMOON KIMprogress
03/14/2022Maintenance informationMOON KIMenergy_progress
03/14/2022HVAC-R and service water heating equipmentMOON KIMenergy_progress
03/14/2022HVAC-R and service water heating system controlsMOON KIMenergy_progress
▾Documents — 45 on file (BIS + DOB NOW)
▸Plans & Drawings4
▸DOB NOWPlans/Sketch4
08/31/2026B00676808-I1Request digital key ↗
08/31/2026B00676808-S1Request digital key ↗
08/31/2026B00676808-P2Request digital key ↗
Showing 3 of 4 on file for this type
▸Applications & Permits7
▸BISPLAN / WORK APPROVAL APPLICATION4
01/21/2022321957799Open ↗
09/04/2019321957799Open ↗
07/01/2019321957799Open ↗
Showing 3 of 4 on file for this type
▸BISWORK PERMIT APPLICATION3
07/30/2020321957799Open ↗
07/30/2020321957799Open ↗
09/04/2019321957799Open ↗
▸Seals & Professional Certifications18
▸DOB NOWProgress Inspector Seal & Signature7
09/23/2026B00676808-S1Open ↗
09/23/2026B00676808-S1Open ↗
09/23/2026B00676808-S1Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature4
08/31/2026B00676808-P1Open ↗
08/31/2026B00676808-S1Open ↗
08/31/2026B00676808-P2Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature3
09/23/2026B00676808-S1Open ↗
09/01/2026B00676808-P2Open ↗
08/23/2026B00676808-P1Open ↗
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION2
09/04/2019321957799Open ↗
08/25/2010320206120Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM1
08/25/2010320206120Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST1
08/25/2010320206120Open ↗
▸Safety & Tenant Protection1
▸BISTenant Protection Plan and Notes1
09/03/2019321957799Open ↗
▸Environmental & Asbestos6
▸DOB NOWDEP ACP-5: Asbestos Assessment Report4
08/31/2026B00676808-P2Open ↗
08/31/2026B00676808-P1Open ↗
08/31/2026B00676808-I1Open ↗
Showing 3 of 4 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
09/03/2019321957799Open ↗
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'1
08/25/2010320206120Open ↗
▸Energy Compliance2
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS1
07/01/2019321957799Open ↗
▸DOB NOWEN2: As Built Energy Analysis1
08/31/2026B00676808-S1Open ↗
▸Inspections & Test Reports1
▸BISHYDRO FLOW TEST LETTER1
09/03/2019321957799Open ↗
▸Approvals, Objections & Sign-offs1
▸BISADMINISTRATIVE OBJECTIONS1
08/25/2010320206120Open ↗
▸Cost, Insurance & Ownership2
▸BISCOST AFFIDAVIT2
07/01/2019321957799Open ↗
08/25/2010320206120Open ↗
▸Filing & Intake Forms3
▸BISEFILING COVER SHEET2
07/01/2019321957799Open ↗
08/25/2010320206120Open ↗
▸BISADDITIONAL INFORMATION1
01/31/2022321957799Open ↗