← Back
BuildNYC
Two family converted from one family
244 ASHFORD STREET
BROOKLYN · Cypress Hills · BIN 3088345
💬 Discuss this project
1901Year Built
2Stories
B3Building Class
R6BZoning
4,220 sfGross Floor Area
2Units
Rent Stabilized7 Active Violations 5 unresolved · 2 paperwork only ▸FDNY Report ↗
Two family converted from one family · Owner of record: 244 Ashford Group · 4,500 sf lot · 0.94 FAR built · Flood zone X
Locations of Work
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Roof1 filing · 20 docs
Floor 31 filing · 20 docs
Floor 21 filing · 20 docs
Floor 1Unit 1, Unit 1A, Unit 1B +21 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Simhacreation103/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
SH Engineering204/23/2026
Chosen MEP309/02/2025
Xpdite Group109/02/2025
Lester Katz, Ncarb105/07/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Buildings Reprisentative1003/21/2026
Building Lifecycle
08/31/2026
Objection resolved — Resolved
04/26/2026
Objection raised — Other
04/25/2026
Objection raised — Other
04/23/2026
Filed — ALT-CO - New Building with Existing Elements to Remain
PROPOSED ALTERATION FROM A 2 STORY BUILDING TO A 4 STORY RESIDENTIAL BUILDING TOTAL OF 16 DWELLING UNITS.
B01219618-S6
04/15/2026
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
55 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Nothing on file for this building.
1 project · most recent 04/23/2026
Sprinkler System
FiledStatusContractorScope
04/23/2026——Sprinkler System
1 project · most recent 04/23/2026
Storm Water/Sanitary
FiledStatusContractorScope
04/23/2026——Storm, Water/Sanitary
1 project · most recent 04/23/2026
Steel Concrete Masonry
FiledStatusContractorScope
04/23/2026——Steel, Concrete, Masonry
▾Special Inspection Requirements (DOB NOW) — 41
DateRequirementInspectorRole
04/15/2026Subsurface Investigations (Borings/Test Pits)—special
04/15/2026Subgrade Inspections—special
04/15/2026Concrete - Cast-In-Place—special
08/28/2025HVAC-R and service water piping design and insulation—energy_progress
08/28/2025HVAC-R and service water heating equipment—energy_progress
08/28/2025HVAC-R and service water heating system controls—energy_progress
08/28/2025Maintenance information—energy_progress
08/26/2025Fire-Resistant Penetrations and Joints—special
08/26/2025Energy Code Compliance Inspections—progress
08/26/2025HVAC-R and service water heating equipment—energy_progress
08/26/2025HVAC-R and service water heating system controls—energy_progress
08/26/2025HVAC-R and service water piping design and insulation—energy_progress
08/26/2025Duct leakage testing, insulation and design—energy_progress
08/26/2025Shutoff dampers—energy_progress
08/26/2025Maintenance information—energy_progress
08/25/2025Fire-Resistant Penetrations and Joints—special
08/25/2025Post-installed Anchors—special
08/25/2025Structural Stability – Alterations of existing buildings—special
08/25/2025Structural Stability – Alterations of existing buildings—special
07/16/2025Final—progress
07/16/2025Mechanical Systems—special
07/16/2025Sprinkler Systems—special
07/16/2025Final—progress
07/16/2025Footing and Foundation—progress
07/14/2025Interior lighting power—energy_progress
Latest 25 of 41.
39 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account