← Back
BuildNYC
Elevator apt, semi-fireproof with stores
244 EAST 86TH STREET
MANHATTAN · BIN 1048772
💬 Discuss this project
1920Year Built
6Stories
D7Building Class
C2-8AZoning
54,763 sfGross Floor Area
40Units
LL97 CoveredRent Stabilized1 Active Violation ▸
Elevator apt, semi-fireproof with stores · Owner of record: 244 East 86th Street · 10,216 sf lot · 5.36 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
RoofChase Bank3p · 1 filing · 8 docs
Floor 1Ember, LaserAway +1Under Construction37p · 3 filings · 20 docs
CellarEmberUnder Construction11p · 1 filing · 15 docs
Site & exteriorCharles Thompson, LLC C/O Shore Ass9p · 5 filings · 16 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
244 East 86th7503/22/2026
Shore Assets2410/13/2026
244 E 86 St1103/21/2026
Charles Thompson LLC C/O Shore807/08/2026
Laseraway610/13/2026
244E86TH St LLC Shore Assets403/21/2026
Mept Realty203/21/2026
Piaza203/21/2026
2244 East 86th Street103/21/2026
Shore103/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
EP Engineering209/08/2026
IW Architecture208/24/2026
Parkbench Architects108/21/2026
Case Engineering207/09/2026
Dxu107/08/2026
Rigid Structural Design107/10/2025
Merritt Engineering Consultants105/07/2024
Shaaban Engineering209/15/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Merritt Engineering Consultant203/21/2026
Rigid Structural Design203/21/2026
Kazam Consultants403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
William C. Gerakaris P&HPlumbing209/03/2026
Performance MechancialGeneral Contractor203/21/2026
Vanguard Construction andGeneral Contractor207/30/2026
Mauceri Sign CoSign hanger208/26/2026
National MaintenanceSign hanger207/08/2026
Home Run ElectricElectrical203/21/2026
Blueberry BuildersGeneral Contractor209/26/2026
Nash Electric ServicesElectrical103/21/2026
Torres IvanElectrical103/21/2026
V. Vass ElectricElectrical103/21/2026
Empire Lic Electrical ContractorsElectrical103/21/2026
Republic Scaffold & HoistScaffold104/09/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Outsource Special Inspection2827108/21/2026
Metric Consulting and Ins1803307/09/2026
CDG Architects LLC /Dba1327105/07/2024
Merritt Engineering Consulting460105/07/2024
Building Lifecycle
All (120)Filed (12)Permit Issued (12)Signed Off (6)Violation (60)Special Inspection (30)
10/07/2026
Signed off — Alteration
ERECT AN ILLUMINATED BUSINESS ACCESSORY WALL SIGN. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
M01440161-I1
10/07/2026
Signed off — Alteration
ERECT AN ILLUMINATED BUSINESS ACCESSORY BLADE SIGN. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
M01440164-I1
09/25/2026
Permit issued — General Construction
M01436314-I1-GC
09/08/2026
Filed — Alteration
MODIFICATION TO PLUMBING FIXTURES FOR INTERIOR BUILDOUT - EMBER. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
M01436314-S1
09/08/2026
Filed — Alteration
MODIFICATION TO PLUMBING FIXTURES FOR INTERIOR BUILDOUT - EMBER. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
M01436314-S2
09/08/2026
Permit issued — General Construction
M01436314-I1-GC
09/02/2026
Permit issued — Plumbing
M01420694-S2-PL
08/26/2026
Special inspection requirement — Maintenance information
08/26/2026
Special inspection requirement — Duct leakage testing, insulation and design
08/26/2026
Special inspection requirement — HVAC-R and service water heating equipment
08/26/2026
Special inspection requirement — HVAC-R and service water heating system controls
08/26/2026
Special inspection requirement — Final
08/26/2026
Special inspection requirement — Tenant Protection Plan Compliance
08/26/2026
Special inspection requirement — Energy Code Compliance Inspections
08/26/2026
Special inspection requirement — HVAC-R and service water heating system controls
08/26/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
08/26/2026
Special inspection requirement — Mechanical Systems
08/26/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
08/26/2026
Special inspection requirement — Post-installed Anchors
08/26/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
08/26/2026
Special inspection requirement — Post-installed Anchors
08/26/2026
Special inspection requirement — Tenant Protection Plan Compliance
08/26/2026
Special inspection requirement — Energy Code Compliance Inspections
08/26/2026
Special inspection requirement — HVAC-R and service water heating equipment
08/26/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
08/25/2026
Permit issued — Sign
M01440161-I1-SG
08/25/2026
Permit issued — Sign
M01440164-I1-SG
08/24/2026
Filed — Alteration
ERECT AN ILLUMINATED BUSINESS ACCESSORY WALL SIGN. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
M01440161-I1
08/24/2026
Filed — Alteration
ERECT AN ILLUMINATED BUSINESS ACCESSORY BLADE SIGN. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
M01440164-I1
08/21/2026
Filed — Alteration
MODIFICATION TO PLUMBING FIXTURES FOR INTERIOR BUILDOUT - EMBER. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
M01436314-I1
08/03/2026
Special inspection requirement — Final
Israel Wertentheil
08/03/2026
Special inspection requirement — Final
Israel Wertentheil
07/29/2026
Permit issued — Mechanical Systems
M01420694-S1-MS
07/29/2026
Permit issued — Plumbing
M01420694-S2-PL
07/27/2026
Permit issued — General Construction
M01420694-I1-GC
07/24/2026
Special inspection requirement — Energy Code Compliance Inspections
jennifer ewald
07/24/2026
Special inspection requirement — Post-installed Anchors
JONAR MADRIAGA
07/24/2026
Special inspection requirement — Tenant Protection Plan Compliance
JONAR MADRIAGA
07/24/2026
Special inspection requirement — Final
jennifer ewald
07/24/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
JONAR MADRIAGA
07/24/2026
Special inspection requirement — Fire-Resistance Rated Construction
jennifer ewald
07/24/2026
Special inspection requirement — Interior lighting power
jennifer ewald
07/24/2026
Special inspection requirement — Lighting controls
jennifer ewald
07/09/2026
Filed — Alteration
SUBSEQUENT FILING FOR PLUMBING MODIFICATION WORK FOR 1ST FLOOR EXISTING COMMERICAL SPACE AS PER PLANS FILED HEREWITH. NO CHANGE IN EGRESS, USE OR OCCUPANCY.
M01420694-S1
07/08/2026
Filed — Alteration
SUBSEQUENT FILING FOR PLUMBING MODIFICATION WORK FOR 1ST FLOOR EXISTING COMMERICAL SPACE AS PER PLANS FILED HEREWITH. NO CHANGE IN EGRESS, USE OR OCCUPANCY.
M01420694-S2
07/08/2026
Filed — Alteration
SUBSEQUENT FILING FOR PLUMBING MODIFICATION WORK FOR 1ST FLOOR EXISTING COMMERICAL SPACE AS PER PLANS FILED HEREWITH. NO CHANGE IN EGRESS, USE OR OCCUPANCY.
M01420694-I1
06/22/2026
Special inspection requirement — HVAC-R and service water heating equipment
SAMI HAJJAR P.E
06/22/2026
Special inspection requirement — Mechanical Systems
SAMI HAJJAR P.E
05/14/2026
Signed off — Alteration
Installation of a temporarily heavy-duty sidewalk shed per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
M01244765-I1
07/10/2025
Filed — Alteration
Installation of a temporarily heavy-duty sidewalk shed per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
M01244765-I1
07/10/2025
Permit issued — Sidewalk Shed
M01244765-I1-SH
11/25/2024
Signed off — Alteration
ERECT ILLUMINATED ACCESSORY BUSINESS WALL SIGN; COPY READING "CHASE WITH LOGO"
M00915486-I1
11/25/2024
Signed off — Alteration
ERECT ILLUMINATED ACCESSORY BUSINESS WALL SIGN; COPY READING "CHASE WITH LOGO"
M00915494-I1
10/03/2024
Signed off — Alteration
HVAC REPLACMENT AS PER PLANS SUBMITTED HEREWITH, NO CHANGE IN USE, OCCUPANCY OR EGRESS.
M01043208-I1
08/22/2024
Permit issued — Mechanical Systems
M01043208-I1-MS
08/02/2024
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
05/07/2024
Filed — Alteration
HVAC REPLACMENT AS PER PLANS SUBMITTED HEREWITH, NO CHANGE IN USE, OCCUPANCY OR EGRESS.
M01043208-I1
05/02/2024
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
09/15/2023
Filed — Alteration
ERECT ILLUMINATED ACCESSORY BUSINESS WALL SIGN; COPY READING "CHASE WITH LOGO"
M00915486-I1
09/15/2023
Filed — Alteration
ERECT ILLUMINATED ACCESSORY BUSINESS WALL SIGN; COPY READING "CHASE WITH LOGO"
M00915494-I1
Latest 60 of 120 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedBlueberry Builders09/25/2026
DOB NOWGeneral ConstructionPermit IssuedBlueberry Builders09/08/2026
DOB NOWPlumbingPermit IssuedWilliam C. Gerakaris P&H09/02/2026
DOB NOWSignSigned-offMauceri Sign Co08/25/2026
DOB NOWSignSigned-offMauceri Sign Co08/25/2026
DOB NOWMechanical SystemsPermit IssuedVanguard Construction and07/29/2026
DOB NOWPlumbingPermit IssuedWilliam C. Gerakaris P&H07/29/2026
DOB NOWGeneral ConstructionPermit IssuedVanguard Construction and07/27/2026
DOB NOWSidewalk ShedSigned-offRepublic Scaffold & Hoist07/10/2025
DOB NOWMechanical SystemsSigned-offPerformance Mechancial08/22/2024
DOB NOWSignSigned-offNational Maintenance09/15/2023
DOB NOWSignSigned-offNational Maintenance09/15/2023
BISMHISSUEDAir Depot Commercial Refrigeration05/13/2019
BISMHISSUEDAir Depot Commercial Refrigeration03/20/2019
BISPLISSUEDJ-J Plumbing12/18/2018
BISPLISSUEDJ-J Plumbing12/18/2018
BISOTISSUEDPrologic Construction of NY12/17/2018
BISOTISSUEDPrologic Construction of NY12/17/2018
BISPLISSUEDJ-J Plumbing11/13/2018
BISOTISSUEDPrologic Construction of NY08/24/2018
BISMHISSUEDAir Depot Commercial Refrigeration04/17/2018
BISMHISSUEDAir Depot Commercial Refrigeration03/06/2018
BISPLISSUEDJ-J Plumbing11/14/2017
BISOTISSUEDPrologic Construction of NY10/10/2017
BISOTISSUEDConcept Air Conditioning09/08/2017
BISOTISSUEDWade Ray & Associates Construction02/28/2017
BISEQISSUEDRepublic Scaffold & Hoist01/25/2017
BISEQISSUEDRepublic Scaffold & Hoist01/25/2017
BISPLISSUEDJ-J Plumbing12/27/2016
BISOTISSUEDPrologic Construction of NY12/20/2016
BISOTISSUEDWade Ray & Associates Construction10/19/2016
BISOTISSUEDWindecker Construction10/17/2014
BIS—ISSUEDCad Signs NYC10/17/2014
BISEQISSUEDWindecker Construction10/17/2014
BIS—ISSUEDCad Signs NYC10/17/2014
BISPLISSUEDJ-J Plumbing09/19/2014
BISEQISSUEDPrologic Construction of NY06/12/2014
BISEQISSUEDJag Contracting Service05/21/2014
BISOTISSUEDPrologic Construction of NY05/06/2014
BISMHISSUEDM. Cary11/08/2012
+ 22 more permits on file
2 projects · most recent 09/08/2026
Heating and Air Conditioning Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
09/08/2026Permit IssuedBlueberry BuildersHeating and Air Conditioning Systems
Heat / Cool
Lg ZRNU123MAAA 494 CFM · Vrf Indoor ×1
ZRNU183CFUA 565 CFM · Vrf Indoor ×1
ZRNU183SKSA 494 CFM · Vrf Indoor ×1
ZRUM048GSS0 5,400 BTU · Vrf Outdoor ×1
Daikin BCHD0081 58,626 CFM · Vrf Indoor ×1
REYA72AATJA 81,000 BTU · Vrf Outdoor ×1
07/09/2026Permit IssuedVanguard Construction andHeating and Air Conditioning Systems, Ventilation Systems
Heat / Cool
Samsung AM024TNVDCH/AA 23,800 BTU · Vrf Indoor ×3
AM024TXMDCH/AA 27,000 BTU · Vrf Indoor ×1
AM048TXMDCH/AA 54,000 BTU · Vrf Outdoor ×1
Trane PUZ-AK48NLHZ 60,000 BTU · Ahu ×1
PVA-AA48NL 60,000 BTU · Ahu ×1
Ventilation
Greenheck EFD-635 480 CFM · Exhaust Fan ×1
Samsung AN036NSEDAV/AA - 300 CFM · Vrf Indoor ×1
2 projects · most recent 09/08/2026
Water/Sanitary
FiledStatusContractorScope
09/08/2026——Water/Sanitary
07/09/2026Permit IssuedWilliam C. Gerakaris P&HWater/Sanitary
14 projects · most recent 10/14/2026
General Wiring HVAC Wiring
FiledStatusContractorScope
10/14/2026Permit IssuedMontgomery Electrical ContractingGeneral Wiring
10/14/2026Permit IssuedMontgomery Electrical Contracting—
10/14/2026Pending Payment VerificationMontgomery Electrical ContractingGeneral Wiring
09/25/2026Permit IssuedExecutive Electl ServicesGeneral Wiring
06/03/2026Permit IssuedGMJ ElectricGeneral Wiring
06/23/2025CompleteNash Electric Services—
01/18/2024Permit IssuedHome Run Electric—
01/18/2024Permit IssuedHome Run Electric—
04/10/2023CompleteEmpire Lic Electrical Contractors1 meters, 1 new_meters
09/16/2020CompleteHY-Lee Electric CoGeneral Wiring
04/23/2020Complete247 Electrical—
09/18/2019CompleteIntelogic ElectricGeneral Wiring
01/31/2019Permit IssuedAll Ways Electric Corp.wHVAC Wiring
01/11/2019Permit IssuedDola Electrical Co2 meters, 2 new_meters
1 project · most recent 07/10/2025
Sidewalk Shed
FiledStatusContractorScope
07/10/2025Signed-offRepublic Scaffold & HoistSidewalk Shed
▾Special Inspection Requirements (DOB NOW) — 50
DateRequirementInspectorRole
08/26/2026Maintenance information—energy_progress
08/26/2026Duct leakage testing, insulation and design—energy_progress
08/26/2026HVAC-R and service water heating equipment—energy_progress
08/26/2026HVAC-R and service water heating system controls—energy_progress
08/26/2026Final—progress
08/26/2026Tenant Protection Plan Compliance—special
08/26/2026Energy Code Compliance Inspections—progress
08/26/2026HVAC-R and service water heating system controls—energy_progress
08/26/2026HVAC-R and service water piping design and insulation—energy_progress
08/26/2026Mechanical Systems—special
08/26/2026Fire-Resistant Penetrations and Joints—special
08/26/2026Post-installed Anchors—special
08/26/2026Fire-Resistant Penetrations and Joints—special
08/26/2026Post-installed Anchors—special
08/26/2026Tenant Protection Plan Compliance—special
08/26/2026Energy Code Compliance Inspections—progress
08/26/2026HVAC-R and service water heating equipment—energy_progress
08/26/2026HVAC-R and service water piping design and insulation—energy_progress
08/03/2026FinalIsrael Wertentheilprogress
08/03/2026FinalIsrael Wertentheilprogress
07/24/2026Energy Code Compliance Inspectionsjennifer ewaldprogress
07/24/2026Post-installed AnchorsJONAR MADRIAGAspecial
07/24/2026Tenant Protection Plan ComplianceJONAR MADRIAGAspecial
07/24/2026Finaljennifer ewaldprogress
07/24/2026Fire-Resistant Penetrations and JointsJONAR MADRIAGAspecial
Latest 25 of 50.
▾Tenants in the building
TenantSpaceFloorsRenovation projects
EmberRetailCellar, Floor 1
Project M01436314 Alteration · Permit Entire · 08/21/2026
LaserAwayMedical / HealthcareFloor 1
Project M01420694 Alteration · Permit Entire · 07/08/2026
Chase BankBank / Financial branchRoof
Project M01043208 Alteration · LOC Issued · 05/07/2024
Names are taken automatically from the text of each project’s filed documents (title blocks and cover sheets) and screened to exclude owners, landlords and designers. They may be incomplete or wrong; check the filing.
▾Documents — 542 on file (BIS + DOB NOW)
▸Plans & Drawings10
▸DOB NOWPlans/Sketch10
08/29/2026M00915494-I1Request digital key ↗
08/29/2026M00915486-I1Request digital key ↗
08/27/2026M01043208-I1Request digital key ↗
Showing 3 of 10 on file for this type
▸Applications & Permits107
▸BISPLAN / WORK APPROVAL APPLICATION54
11/27/2020122049988Open ↗
10/29/2020122049988Open ↗
05/26/2020122049988Open ↗
Showing 3 of 54 on file for this type
▸BISWORK PERMIT APPLICATION52
05/13/2019123417105Open ↗
03/20/2019123510664Open ↗
12/18/2018123510664Open ↗
Showing 3 of 52 on file for this type
▸BISCERTIFICATE OF OCCUPANCY APPLICATION1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Seals & Professional Certifications156
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION76
11/26/2019123510664Open ↗
11/26/2019123510664Open ↗
11/26/2019123417105Open ↗
Showing 3 of 76 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST21
12/14/2018123417105Open ↗
12/14/2018123510664Open ↗
03/01/2018123436763Open ↗
Showing 3 of 21 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT15
12/14/2018123417105Open ↗
12/14/2018123417105Open ↗
12/14/2018123510664Open ↗
Showing 3 of 15 on file for this type
▸DOB NOWProgress Inspector Seal & Signature14
09/23/2026M01436314-I1Open ↗
09/23/2026M01440164-I1Open ↗
09/23/2026M01440161-I1Open ↗
Showing 3 of 14 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature12
09/10/2026M01436314-S2Open ↗
09/10/2026M01436314-S1Open ↗
08/27/2026M01043208-I1Open ↗
Showing 3 of 12 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM9
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 9 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature7
09/23/2026M01436314-I1Open ↗
09/23/2026M01436314-I1Open ↗
09/23/2026M01436314-I1Open ↗
Showing 3 of 7 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Trade Schedules & Equipment34
▸BISEQUIPMENT USE APPLICATION/PERMIT8
11/26/2019123510664Open ↗
11/26/2019123417105Open ↗
11/13/2018123436763Open ↗
Showing 3 of 8 on file for this type
▸BISSCHEDULE B - PLUMBING7
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 7 on file for this type
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE5
12/14/2018123417105Open ↗
12/14/2018123510664Open ↗
05/09/2018122818718Open ↗
Showing 3 of 5 on file for this type
▸BISEQUIPMENT USE PERMITS5
11/26/2019123510664Open ↗
11/26/2019123417105Open ↗
11/13/2018123436763Open ↗
Showing 3 of 5 on file for this type
▸BISSELF-CERT PLUMBING NOTICE4
02/27/2015121133371Open ↗
Showing 1 of 4 on file for this type
▸BISSIGN HANGER CERTIFICATE3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISFA - FDNY APPROVAL : FD-FAA1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Safety & Tenant Protection9
▸BISTenant Protection Plan and Notes7
12/14/2018123417105Open ↗
12/14/2018123510664Open ↗
09/01/2017123137818Open ↗
Showing 3 of 7 on file for this type
▸BISSTREET TREE CHECKLIST2
09/11/2017123137818Open ↗
09/01/2017123137818Open ↗
▸Environmental & Asbestos35
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'10
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 10 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)9
12/14/2018123417105Open ↗
12/14/2018123510664Open ↗
03/01/2018123436763Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWDEP ACP-5: Asbestos Assessment Report9
09/10/2026M01436314-S2Open ↗
09/10/2026M01436314-S1Open ↗
08/27/2026M01043208-I1Open ↗
Showing 3 of 9 on file for this type
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸BISACP5 ASBESTOS: CERTIFICATION (DEP ACP5)2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸Energy Compliance29
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS19
11/26/2019123510664Open ↗
11/26/2019123417105Open ↗
12/14/2018123417105Open ↗
Showing 3 of 19 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS7
11/26/2019123510664Open ↗
11/26/2019123417105Open ↗
11/29/2018122818718Open ↗
Showing 3 of 7 on file for this type
▸BISTR8: Energy Code Progress Inspections1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISELECTRICAL APPLICATION FOR SIDEWALK SHED LIGHTING1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWPreliminary Commissioning Report Certification1
08/13/2026M01043208-I1Open ↗
▸Inspections & Test Reports1
▸BISTECHNICAL REPORT: RESPONSIBILITY1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Approvals, Objections & Sign-offs49
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST30
11/26/2019123510664Open ↗
11/26/2019123417105Open ↗
11/29/2018122818718Open ↗
Showing 3 of 30 on file for this type
▸BISADMINISTRATIVE OBJECTIONS13
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 13 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISSCHEDULE A - OCCUPANCY / USE3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸Cost, Insurance & Ownership47
▸BISCOST AFFIDAVIT47
11/26/2019123510664Open ↗
11/26/2019123417105Open ↗
12/14/2018123417105Open ↗
Showing 3 of 47 on file for this type
▸Filing & Intake Forms58
▸BISEFILING COVER SHEET32
12/14/2018123417105Open ↗
12/14/2018123417105Open ↗
12/14/2018123510664Open ↗
Showing 3 of 32 on file for this type
▸BISBOROUGH INTAKE FORM13
03/18/2020122049988Open ↗
11/26/2019123510664Open ↗
11/26/2019123417105Open ↗
Showing 3 of 13 on file for this type
▸BISADDITIONAL INFORMATION11
09/24/2019123510664Open ↗
09/24/2019123417105Open ↗
05/08/2019123417105Open ↗
Showing 3 of 11 on file for this type
▸BISeFiling Job Application Cover Sheet2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸Other Documents7
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION6
12/14/2018123417105Open ↗
Showing 1 of 6 on file for this type
▸BISPLOT DIAGRAM1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type