Over six families without stores
244 IRVING AVENUE
BROOKLYN · BIN 3075442
💬 Discuss this project
1931Year Built
4Stories
C1Building Class
R6Zoning
6,720 sfGross Floor Area
8Units
Rent Stabilized11 Open Violations ▸FDNY Report ↗
Over six families without stores · Owner of record: BADABING REALTY CORP · 2,280 sf lot · 2.95 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbing
Permit Issued — active, not yet Signed-off
Roof3p · 2 filings · 9 docs
Floor 4Under Construction11p · 4 filings · 20 docs
Floor 3Under Construction6p · 3 filings · 20 docs
Floor 2Under Construction6p · 3 filings · 20 docs
Floor 1Under Construction7p · 4 filings · 20 docs
CellarUnder Construction6p · 3 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
BADABING REALTY CORP1303/22/2026
OWNER OF 244 IRVING AVE103/22/2026
SELECT SERVICE LTD.203/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
KEMS ENGINEERING AND CONSTRUCTION805/21/2025
DARIO PASQUARIELLO ARCHITECT209/04/2024
ASR ENGINEERING PC108/29/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
ANTHONY CUCICH ARCHITECT203/21/2026
LEWSAN CONSULTING1603/21/2026
ADVANCED BUILDERS SERVICES103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
GIROLAMO RESTORATION CORPGeneral Contractor1407/23/2026
BAZZINI PLUMBING ANDPlumbing207/08/2026
MAURAT, TELMOElectrical103/21/2026
TESTA, ANTHONYElectrical103/21/2026
TOPLINE NYC INCGeneral Contractor104/09/2026
BOSCO PLUMBING & HTG INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
EC SPECIAL INSPECTIONS8355805/21/2025
DARIO ARCHITECTURE &DESIG6878109/04/2024
Building Lifecycle
All (103)Filed (11)Permit Issued (14)Signed Off (1)Violation (33)Inspection (4)Objection (16)Special Inspection (24)
07/22/2026
Permit issued — General Construction
B00811913-I1-GC
05/05/2026
Violation issued (HPD, closed)
A
03/23/2026
Permit issued — General Construction
B00811913-I1-GC
03/23/2026
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
02/19/2026
Permit issued — General Construction
B00811887-I1-PL
01/30/2026
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
01/30/2026
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
11/24/2025
Signed off — Alteration
INSTALLATION OF 300PSF SIDEWALK SHED AS PER PLANS. ALL EQUIPMENT SHALL COMPLY WITH CH #33 OF THE NYC CODE 2022. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
B01103702-I1
06/17/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
06/10/2025
Violation issued (HPD, closed)
A
05/21/2025
Filed — Alteration
REMOVE GAS-FIRE EQUIPMENT, GAS METERS & GAS PIPING THROUGHOUT AND PERFORM PLUMBING WORK THROUGHOUT BUILDING. INSTALL 9 NON-GAS WATER HEATERS, A TENANT LAUNDRY ROOM & TOILET IN CELLAR.
B00811887-P3
05/20/2025
Special inspection requirement — Fenestration and door U-factor and product ratings
Steven Bendoraitis
05/20/2025
Special inspection requirement — Lighting in dwelling units
Steven Bendoraitis
05/20/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
ABDALLAH ELCHERBINI
05/20/2025
Special inspection requirement — Energy Code Compliance Inspections
Steven Bendoraitis
05/20/2025
Special inspection requirement — Final
Steven Bendoraitis
05/19/2025
Filed — Alteration
INTERIOR RENOVATION AND ALTERATION FOR THE ENTIRE BUILDING, REPLACE ALL WINDOWS, REPLACE APT. ENTRY DOORS WITH FPSC METAL DOORS. ADDED A TENANT LAUNDRY ROOM IN CELLAR AND TOILET IN CELLAR
B00811913-P3
05/16/2025
Special inspection requirement — Lighting in dwelling units
Steven Bendoraitis
05/16/2025
Special inspection requirement — Fenestration and door U-factor and product ratings
Steven Bendoraitis
05/16/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
ABDALLAH ELCHERBINI
05/16/2025
Special inspection requirement — Energy Code Compliance Inspections
Steven Bendoraitis
05/16/2025
Special inspection requirement — Final
Steven Bendoraitis
04/17/2025
Permit issued — Mechanical Systems
B01096536-I1-MS
04/17/2025
Permit issued — General Construction
B01024338-I1-GC
04/17/2025
Permit issued — General Construction
B00811913-I1-GC
03/06/2025
Permit issued — General Construction
B00811887-I1-PL
02/20/2025
Permit issued — General Construction
B00811913-I1-GC
12/30/2024
Filed — Alteration
REMOVE GAS-FIRE EQUIPMENT, GAS METERS & GAS PIPING THROUGHOUT AND PERFORM PLUMBING WORK THROUGHOUT BUILDING. INSTALL 9 NON-GAS WATER HEATERS, A TENANT LAUNDRY ROOM & TOILET IN CELLAR.
B00811887-P2
12/30/2024
Filed — Alteration
INTERIOR RENOVATION AND ALTERATION FOR THE ENTIRE BUILDING, REPLACE ALL WINDOWS, REPLACE APT. ENTRY DOORS WITH FPSC METAL DOORS. ADDED A TENANT LAUNDRY ROOM IN CELLAR AND TOILET IN CELLAR
B00811913-P2
12/20/2024
Permit issued — Mechanical Systems
B01096536-I1-MS
12/10/2024
Special inspection requirement — Final
Steven Bendoraitis
12/10/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
ABDALLAH ELCHERBINI
12/10/2024
Special inspection requirement — Fenestration and door U-factor and product ratings
Steven Bendoraitis
12/10/2024
Special inspection requirement — Lighting in dwelling units
Steven Bendoraitis
12/10/2024
Special inspection requirement — Energy Code Compliance Inspections
Steven Bendoraitis
10/03/2024
Objection resolved — Addressed
09/23/2024
Objection resolved — Addressed
09/23/2024
Objection resolved — Addressed
09/23/2024
Objection resolved — Addressed
09/23/2024
Objection resolved — Addressed
09/23/2024
Objection resolved — Addressed
09/23/2024
Objection resolved — Addressed
09/18/2024
Objection resolved — Addressed
09/09/2024
Objection raised — Scope
09/09/2024
Objection raised — Other
09/09/2024
Objection raised — Other
09/09/2024
Objection raised — Scope
09/09/2024
Objection raised — Energy
09/09/2024
Objection raised — Admin
09/09/2024
Objection raised — Admin
09/09/2024
Objection raised — Inspections
09/04/2024
Filed — Alteration
B01096536-I1
08/30/2024
Permit issued — Sidewalk Shed
B01103702-I1-SH
08/29/2024
Filed — Alteration
INSTALLATION OF 300PSF SIDEWALK SHED AS PER PLANS. ALL EQUIPMENT SHALL COMPLY WITH CH #33 OF THE NYC CODE 2022. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
B01103702-I1
08/14/2024
Special inspection requirement — Mechanical Systems
Dario Pasquariello
08/14/2024
Special inspection requirement — Final
ANTHONY CUCICH
04/18/2024
Permit issued — General Construction
B01024338-I1-GC
03/27/2024
Filed — Alteration
B01024338-I1
02/29/2024
Filed — Alteration
REMOVE GAS-FIRE EQUIPMENT, GAS METERS & GAS PIPING THROUGHOUT AND PERFORM PLUMBING WORK THROUGHOUT BUILDING. INSTALL 9 NON-GAS WATER HEATERS, A TENANT LAUNDRY ROOM & TOILET IN CELLAR.
B00811887-P1
02/26/2024
Filed — Alteration
INTERIOR RENOVATION AND ALTERATION FOR THE ENTIRE BUILDING, REPLACE ALL WINDOWS, REPLACE APT. ENTRY DOORS WITH FPSC METAL DOORS. ADDED A TENANT LAUNDRY ROOM IN CELLAR AND TOILET IN CELLAR
B00811913-P1
Latest 60 of 103 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedGIROLAMO RESTORATION CORP07/22/2026
DOB NOWGeneral ConstructionPermit IssuedGIROLAMO RESTORATION CORP03/23/2026
DOB NOWGeneral ConstructionSigned-offBAZZINI PLUMBING AND02/19/2026
DOB NOWMechanical SystemsPermit IssuedGIROLAMO RESTORATION CORP04/17/2025
DOB NOWGeneral ConstructionPermit IssuedGIROLAMO RESTORATION CORP04/17/2025
DOB NOWGeneral ConstructionPermit IssuedGIROLAMO RESTORATION CORP04/17/2025
DOB NOWGeneral ConstructionSigned-offBAZZINI PLUMBING AND03/06/2025
DOB NOWGeneral ConstructionPermit IssuedGIROLAMO RESTORATION CORP02/20/2025
DOB NOWMechanical SystemsPermit IssuedGIROLAMO RESTORATION CORP12/20/2024
DOB NOWSidewalk ShedSigned-offTOPLINE NYC INC08/30/2024
DOB NOWGeneral ConstructionPermit IssuedGIROLAMO RESTORATION CORP04/18/2024
DOB NOWGeneral ConstructionPermit IssuedGIROLAMO RESTORATION CORP02/16/2024
DOB NOWGeneral ConstructionSigned-offBOSCO PLUMBING & HTG INC01/31/2024
DOB NOWGeneral ConstructionPermit IssuedGIROLAMO RESTORATION CORP01/22/2024
BISBLISSUEDJACK PICCINI, INC04/09/2004
1 project · most recent 05/21/2025
Gas Plumbing-Sprinkler Water/Sanitary
FiledStatusContractorScope
05/21/2025Signed-offBAZZINI PLUMBING ANDGas, Plumbing-Sprinkler, Water/Sanitary
2 projects · most recent 07/09/2025
General Wiring
FiledStatusContractorScope
07/09/2025Permit IssuedSALVATORE CAMPISI & SONSGeneral Wiring
08/31/2024Permit IssuedRICHARD NEU—
▾Field Inspections (DOB CAP) — 4
DateTypeResultReport
03/23/2026Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
01/30/2026Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
01/30/2026Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
06/17/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 24
DateRequirementInspectorRole
05/20/2025Fenestration and door U-factor and product ratingsSteven Bendoraitisenergy_progress
05/20/2025Lighting in dwelling unitsSteven Bendoraitisenergy_progress
05/20/2025Fire-Resistant Penetrations and JointsABDALLAH ELCHERBINIspecial
05/20/2025Energy Code Compliance InspectionsSteven Bendoraitisprogress
05/20/2025FinalSteven Bendoraitisprogress
05/16/2025Lighting in dwelling unitsSteven Bendoraitisenergy_progress
05/16/2025Fenestration and door U-factor and product ratingsSteven Bendoraitisenergy_progress
05/16/2025Fire-Resistant Penetrations and JointsABDALLAH ELCHERBINIspecial
05/16/2025Energy Code Compliance InspectionsSteven Bendoraitisprogress
05/16/2025FinalSteven Bendoraitisprogress
12/10/2024FinalSteven Bendoraitisprogress
12/10/2024Fire-Resistant Penetrations and JointsABDALLAH ELCHERBINIspecial
12/10/2024Fenestration and door U-factor and product ratingsSteven Bendoraitisenergy_progress
12/10/2024Lighting in dwelling unitsSteven Bendoraitisenergy_progress
12/10/2024Energy Code Compliance InspectionsSteven Bendoraitisprogress
08/14/2024Mechanical SystemsDario Pasquariellospecial
08/14/2024FinalANTHONY CUCICHprogress
02/22/2024Fire-Resistant Penetrations and JointsABDALLAH ELCHERBINIspecial
02/22/2024Energy Code Compliance InspectionsSteven Bendoraitisprogress
02/14/2024Lighting in dwelling unitsSteven Bendoraitisenergy_progress
02/14/2024Fenestration and door U-factor and product ratingsSteven Bendoraitisenergy_progress
02/14/2024FinalSteven Bendoraitisprogress
02/14/2024Energy Code Compliance InspectionsSteven Bendoraitisprogress
02/14/2024Fire-Resistant Penetrations and JointsABDALLAH ELCHERBINIspecial
▾Documents — 65 on file (BIS + DOB NOW)
▸Plans & Drawings11
▸DOB NOWPlans/Sketch11
08/25/2026B01024338-I1Request digital key ↗
08/24/2026B01103702-I1Request digital key ↗
08/24/2026B01096536-I1Request digital key ↗
Showing 3 of 11 on file for this type
▸Seals & Professional Certifications35
▸DOB NOWProgress Inspector Seal & Signature18
08/31/2026B00811913-P2Open ↗
08/31/2026B00811913-P2Open ↗
08/31/2026B00811913-P2Open ↗
Showing 3 of 18 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature11
08/24/2026B01096536-I1Open ↗
08/21/2026B00811913-I1Open ↗
08/21/2026B00811913-P1Open ↗
Showing 3 of 11 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature6
08/31/2026B00811913-P2Open ↗
08/28/2026B00811913-P1Open ↗
08/28/2026B00811913-P3Open ↗
Showing 3 of 6 on file for this type
▸Environmental & Asbestos9
▸DOB NOWDEP ACP-5: Asbestos Assessment Report9
08/24/2026B01096536-I1Open ↗
08/21/2026B00811913-I1Open ↗
08/21/2026B00811913-P2Open ↗
Showing 3 of 9 on file for this type
▸Other Documents10
▸DOB NOWDHCR Document10
08/13/2026B00811887-P1Open ↗
08/13/2026B01024338-I1Open ↗
08/13/2026B00811913-P3Open ↗
Showing 3 of 10 on file for this type