ECB02/25/20251RCNY 103-09(e). Failure to file a retaining wall condition assessmentreport by the deadline as required by 1RCNY 103-09(e)(2) and (5). To date, the department has not recieved a retaining wall condition assess$6K due
HPD03/29/2019§ 27-2005 ADMIN. CODE: REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN UNIFORM COLOR CEILING IN THE 3rd ROOM FROM NORTH AT WEST LOCATED AT APT A, 2nd STORY
HPD03/29/2019§ 27-2005 ADMIN. CODE: REPAIR THE ROOF SO THAT IT WILL NOT LEAK AT CEILING IN THE 3rd ROOM FROM NORTH AT EAST LOCATED AT APT A, 2nd STORY
HPD03/29/2019§ 27-2005 ADMIN. CODE: REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN UNIFORM COLOR CEILING IN THE BATHROOM LOCATED AT APT A, 2nd STORY
HPD03/29/2019§ 27-2005 ADMIN. CODE: REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN UNIFORM COLOR CEILING IN THE 3rd ROOM FROM NORTH AT EAST LOCATED AT APT A, 2nd STORY
HPD03/29/2019§ 27-2005 ADMIN. CODE: REPAIR THE ROOF SO THAT IT WILL NOT LEAK AT CEILING IN THE 3rd ROOM FROM NORTH AT WEST LOCATED AT APT A, 2nd STORY
Old · issued 3+ years ago and still listed by DOB; nothing on the city's records either way
DOB12/15/2022Failed to file cycle 1 technical report by 12/31/2018 per rcny 103-09Issued 2022; DOB's record still lists it as active