ECB04/25/2025: OBSERVED THE 2-STORY/2-FAM. DWELLING BLDG. IS BEING ALTERED. AT EXP.2, ALTERED MASONRY STAIRS TO BSMT. & 2FLR. WINDOWS. AT EXP.3/REAR, 2FLR. N. CORNER HORI. EXT. AT EXP.4, ERECTED NEW GAR. STRUCTURE IN ADD. T$12K due
Two family frame · 2,680 sf lot · 0.74 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.