← Back
Professional building / stand-alone funeral home
2448 CONEY ISLAND AVENUE
BROOKLYN · Gravesend (East)-Homecrest · BIN 3329366
💬 Discuss this project
1940Year Built
1Stories
O7Building Class
C8-1Zoning
4,217 sfGross Floor Area
1Units
2 Open Violations ▸FDNY Report ↗
Professional building / stand-alone funeral home · Owner of record: 2448 CONEY REALTY GROUP LLC · 9,613 sf lot · 0.44 FAR built · Flood zone X500
Locations of Work
ArchitectureStructuralMechanicalPlumbingGeneral
Roof13p · 2 filings · 20 docs
Floor 143p · 4 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
2448 CONEY ISLAND AVE REALLTY303/21/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
08/29/2025$5.1M—— → —$1,212/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
SHENKER ARCHITECT, PC412/05/2022
STEEL CORE ENGINEERING PLLC602/28/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Shenker Architects403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
RIKE ASSOCIATES INCGeneral Contractor503/22/2026
STANISLAV UMANSKIYElectrical303/21/2026
DEEP FORMATION INCGeneral Contractor303/21/2026
DIOMEDES E ARBOLEDAGeneral Contractor303/21/2026
MARTIN DORKIN 000947General Contractor203/22/2026
MARTIN DORKINElectrical203/21/2026
HORBRIDGE PLUMBING & HEATINGPlumbing107/08/2026
DMITRIY SHENKERElectrical103/21/2026
ENRIQUE ESPEJOElectrical103/21/2026
PARKSET PLMBG CO.,INCElectrical103/21/2026
SHELBY ELECTRICAL CORPElectrical103/22/2026
BENJAMIN DREBINElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
SHENKER ARCHITECT, PC756412/05/2022
CENTURY TESTING & CONSULT4081602/28/2022
Building Lifecycle
All (65)Filed (10)Permit Issued (5)Signed Off (3)Violation (2)Inspection (9)Objection (6)Special Inspection (30)
05/31/2023
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
02/02/2023
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
01/26/2023
Inspection — Fail-Final CND-Occupancy Inspection
Fail
View inspection ↗
01/10/2023
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
12/21/2022
Special inspection requirement — Insulation placement and R values
DMITRIY SHENKER
12/21/2022
Special inspection requirement — Metering
DMITRIY SHENKER
12/21/2022
Special inspection requirement — Fenestration and door U-factor and product ratings
DMITRIY SHENKER
12/21/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
DMITRIY SHENKER
12/21/2022
Special inspection requirement — Air barrier - visual inspection
DMITRIY SHENKER
12/21/2022
Special inspection requirement — Fenestration air leakage
DMITRIY SHENKER
12/21/2022
Special inspection requirement — Interior lighting power
DMITRIY SHENKER
12/21/2022
Special inspection requirement — Lighting controls
DMITRIY SHENKER
12/21/2022
Special inspection requirement — Energy Code Compliance Inspections
DMITRIY SHENKER
12/05/2022
Filed — Alteration CO
CONVERT EXISTING COMMERCIAL BUILDING, U.G. 16 AND 8, INTO AMBULATORY DIAGNOSTIC AND TREATMENT HEALTH CARE FACILITY WITH ACCESSORY DRUG STORE, U.G. 6, NO CHANGES PROPOSED TO THE EXISTING BUILDING ENVELOPE AND/OR EGRESS.
B00505518-P3
12/05/2022
Special inspection requirement — Fenestration and door U-factor and product ratings
DMITRIY SHENKER
12/05/2022
Special inspection requirement — Lighting controls
DMITRIY SHENKER
12/05/2022
Special inspection requirement — Energy Code Compliance Inspections
DMITRIY SHENKER
12/05/2022
Special inspection requirement — Metering
DMITRIY SHENKER
12/05/2022
Special inspection requirement — Fenestration air leakage
DMITRIY SHENKER
12/05/2022
Special inspection requirement — Air barrier - visual inspection
DMITRIY SHENKER
12/05/2022
Special inspection requirement — Interior lighting power
DMITRIY SHENKER
12/05/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
DMITRIY SHENKER
12/05/2022
Special inspection requirement — Insulation placement and R values
DMITRIY SHENKER
12/02/2022
Signed off — Alteration
NEW PLUMBING SYSTEM. NO CHANGE IN USE, OCCUPANCY OR EGGRES.
B00508753-I1
12/02/2022
Signed off — Alteration
NEW HEAT PUMP VRF SYSTEM. NO CHANGE IN USE, OCCUPANCY OR EGRESS
B00508738-I1
11/03/2022
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
10/28/2022
Permit issued — Mechanical Systems
B00508738-I1-MS
10/26/2022
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
10/26/2022
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
09/14/2022
Permit issued — General Construction
B00505518-I1-GC
08/25/2022
Objection resolved — Addressed
08/24/2022
Objection raised — Scope
08/18/2022
Filed — Alteration CO
CONVERT EXISTING COMMERCIAL BUILDING, U.G. 16 AND 8, INTO AMBULATORY DIAGNOSTIC AND TREATMENT HEALTH CARE FACILITY WITH ACCESSORY DRUG STORE, U.G. 6, NO CHANGES PROPOSED TO THE EXISTING BUILDING ENVELOPE AND/OR EGRESS.
B00505518-P2
08/16/2022
Special inspection requirement — Lighting controls
DMITRIY SHENKER
08/16/2022
Special inspection requirement — Air barrier - visual inspection
DMITRIY SHENKER
08/16/2022
Special inspection requirement — Metering
DMITRIY SHENKER
08/16/2022
Special inspection requirement — Fenestration and door U-factor and product ratings
DMITRIY SHENKER
08/16/2022
Special inspection requirement — Fenestration air leakage
DMITRIY SHENKER
08/16/2022
Special inspection requirement — Interior lighting power
DMITRIY SHENKER
08/16/2022
Special inspection requirement — Insulation placement and R values
DMITRIY SHENKER
08/16/2022
Special inspection requirement — Energy Code Compliance Inspections
DMITRIY SHENKER
08/16/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
DMITRIY SHENKER
06/24/2022
Signed off — Alteration
REINFORCEMENT OF ROOF STRUCTURE OF EXISTING BUILDING
B00508912-I1
06/15/2022
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
06/15/2022
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
06/02/2022
Permit issued — Plumbing
B00508753-I1-PL
03/04/2022
Special inspection requirement — Structural Steel - High Strength Bolting
ALDO BRAVO
03/04/2022
Special inspection requirement — Subgrade Inspections
ALDO BRAVO
03/04/2022
Special inspection requirement — Structural Stability – Alterations of existing buildings
ALDO BRAVO
02/28/2022
Filed — Alteration
REINFORCEMENT OF ROOF STRUCTURE OF EXISTING BUILDING
B00508912-P1
02/26/2022
Filed — Alteration
NEW HEAT PUMP VRF SYSTEM. NO CHANGE IN USE, OCCUPANCY OR EGRESS
B00508738-P1
02/26/2022
Filed — Alteration
NEW PLUMBING SYSTEM. NO CHANGE IN USE, OCCUPANCY OR EGGRES.
B00508753-P1
11/30/2021
Permit issued — General Construction
B00508912-I1-GC-CX
09/30/2021
Filed — Alteration
REINFORCEMENT OF ROOF STRUCTURE OF EXISTING BUILDING
B00508912-I1
09/17/2021
Filed — Alteration CO
CONVERT EXISTING COMMERCIAL BUILDING, U.G. 16 AND 8, INTO AMBULATORY DIAGNOSTIC AND TREATMENT HEALTH CARE FACILITY WITH ACCESSORY DRUG STORE, U.G. 6, NO CHANGES PROPOSED TO THE EXISTING BUILDING ENVELOPE AND/OR EGRESS.
B00505518-P1
07/14/2021
Permit issued — General Construction
B00505518-I1-GC
05/04/2021
Filed — Alteration
NEW PLUMBING SYSTEM. NO CHANGE IN USE, OCCUPANCY OR EGGRES.
B00508753-I1
05/04/2021
Filed — Alteration
NEW HEAT PUMP VRF SYSTEM. NO CHANGE IN USE, OCCUPANCY OR EGRESS
B00508738-I1
04/30/2021
Objection raised — Admin
04/30/2021
Objection resolved — Addressed
Latest 60 of 65 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsPermit IssuedDIOMEDES E ARBOLEDA10/28/2022
DOB NOWGeneral ConstructionPermit IssuedRIKE ASSOCIATES INC09/14/2022
DOB NOWPlumbingSigned-offHORBRIDGE PLUMBING & HEAT06/02/2022
DOB NOWGeneral ConstructionSigned-offDEEP FORMATION INC11/30/2021
DOB NOWGeneral ConstructionPermit IssuedRIKE ASSOCIATES INC07/14/2021
BIS—ISSUEDMAUCERI SIGN CO., INC06/24/2002
BIS—ISSUEDMAUCERI SIGN CO., INC05/06/2002
BISEQISSUEDB & B CONTRACTING SVCS11/07/2001
BISOTISSUEDB & B CONTRACTING SVCS11/07/2001
BIS—ISSUEDSIGN WORLD INC.06/09/1992
BIS—ISSUEDSIGN WORLD INC.06/09/1992
BIS—ISSUEDSIGN WORLD INC.06/09/1992
BIS—ISSUEDSIGN WORLD INC.06/09/1992
BISPLISSUEDNEW YORK STANDARD MECH CORP03/26/1992
BIS—ISSUEDBIANCHI CONSTRUCTION CORP03/20/1992
BIS—ISSUEDBIANCHI CONSTRUCTION CORP.12/19/1991
BISEQISSUEDBIANCHI CONSTRUCTION CORP.12/16/1991
4 projects · most recent 04/10/2025
General Wiring
FiledStatusContractorScope
04/10/2025CompleteACCURATE ELEC'L CORP.General Wiring
09/27/2024CompleteSHELBY ELECTRICAL CORPGeneral Wiring
04/03/2022CompleteMARTIN DORKINGeneral Wiring
03/29/2022CompleteMARTIN DORKINGeneral Wiring
▾Field Inspections (DOB CAP) — 9
DateTypeResultReport
05/31/2023Pass-Final CND-Occupancy InspectionPassView ↗
02/02/2023Pass-Final CND-Occupancy InspectionPassView ↗
01/26/2023Fail-Final CND-Occupancy InspectionFailView ↗
01/10/2023Pass-Final CND-Occupancy InspectionPassView ↗
11/03/2022Pass-Final CND-Occupancy InspectionPassView ↗
10/26/2022Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
10/26/2022Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
06/15/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
06/15/2022Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 65
DateRequirementInspectorRole
12/21/2022Fire-Resistant Penetrations and JointsDMITRIY SHENKERspecial
12/21/2022MeteringDMITRIY SHENKERenergy_progress
12/21/2022Lighting controlsDMITRIY SHENKERenergy_progress
12/21/2022Fenestration air leakageDMITRIY SHENKERenergy_progress
12/21/2022Insulation placement and R valuesDMITRIY SHENKERenergy_progress
12/21/2022Air barrier - visual inspectionDMITRIY SHENKERenergy_progress
12/21/2022Interior lighting powerDMITRIY SHENKERenergy_progress
12/21/2022Fenestration and door U-factor and product ratingsDMITRIY SHENKERenergy_progress
12/21/2022Energy Code Compliance InspectionsDMITRIY SHENKERprogress
12/05/2022Fenestration air leakageDMITRIY SHENKERenergy_progress
12/05/2022MeteringDMITRIY SHENKERenergy_progress
12/05/2022Insulation placement and R valuesDMITRIY SHENKERenergy_progress
12/05/2022Interior lighting powerDMITRIY SHENKERenergy_progress
12/05/2022Air barrier - visual inspectionDMITRIY SHENKERenergy_progress
12/05/2022Fire-Resistant Penetrations and JointsDMITRIY SHENKERspecial
12/05/2022Energy Code Compliance InspectionsDMITRIY SHENKERprogress
12/05/2022Fenestration and door U-factor and product ratingsDMITRIY SHENKERenergy_progress
12/05/2022Lighting controlsDMITRIY SHENKERenergy_progress
08/16/2022Energy Code Compliance InspectionsDMITRIY SHENKERprogress
08/16/2022Interior lighting powerDMITRIY SHENKERenergy_progress
08/16/2022Fenestration air leakageDMITRIY SHENKERenergy_progress
08/16/2022Fenestration and door U-factor and product ratingsDMITRIY SHENKERenergy_progress
08/16/2022MeteringDMITRIY SHENKERenergy_progress
08/16/2022Air barrier - visual inspectionDMITRIY SHENKERenergy_progress
08/16/2022Lighting controlsDMITRIY SHENKERenergy_progress
Latest 25 of 65.
▾Documents — 82 on file (BIS + DOB NOW)
▸Plans & Drawings10
▸DOB NOWPlans/Sketch10
09/01/2026B00508753-I1Request digital key ↗
09/01/2026B00508753-P1Request digital key ↗
09/01/2026B00508912-I1Request digital key ↗
Showing 3 of 10 on file for this type
▸Applications & Permits2
▸BISPLAN / WORK APPROVAL APPLICATION2
01/10/2025301238809Open ↗
01/03/2025301238809Open ↗
▸Seals & Professional Certifications44
▸DOB NOWProgress Inspector Seal & Signature20
09/01/2026B00508912-I1Open ↗
09/01/2026B00508912-I1Open ↗
09/01/2026B00508753-P1Open ↗
Showing 3 of 20 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature14
09/01/2026B00508912-I1Open ↗
09/01/2026B00508912-I1Open ↗
09/01/2026B00508912-I1Open ↗
Showing 3 of 14 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature10
09/01/2026B00508753-I1Open ↗
09/01/2026B00508753-P1Open ↗
09/01/2026B00508912-I1Open ↗
Showing 3 of 10 on file for this type
▸Trade Schedules & Equipment1
▸BISEQUIPMENT USE PERMITS1
01/28/2025301238809Open ↗
▸Environmental & Asbestos10
▸DOB NOWDEP ACP-5: Asbestos Assessment Report10
09/01/2026B00508753-P1Open ↗
09/01/2026B00508753-I1Open ↗
09/01/2026B00508912-P1Open ↗
Showing 3 of 10 on file for this type
▸Energy Compliance3
▸DOB NOWEN2: As Built Energy Analysis.3
08/13/2026B00508753-I1Open ↗
08/13/2026B00505518-I1Open ↗
08/13/2026B00508738-I1Open ↗
▸Inspections & Test Reports8
▸BISTECHNICAL REPORT: RESPONSIBILITY2
02/04/2025301238809Open ↗
01/30/2025301238809Open ↗
▸DOB NOWSOIL REPORT2
08/13/2026B00508912-P1Open ↗
08/13/2026B00508912-I1Open ↗
▸BIS* FINAL INSPECTION DIRECTIVE 14 OF 19751
01/28/2025301238809Open ↗
▸BIS* STRUCTURAL STABILITY 1 RCNY:16-011
01/28/2025301238809Open ↗
▸DOB NOWTR4 Test Report and Plot Diagram1
08/13/2026B00508912-I1Open ↗
▸DOB NOWTR4 Plot Diagram1
08/13/2026B00508912-I1Open ↗
▸Approvals, Objections & Sign-offs1
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST1
02/11/2025301238809Open ↗
▸Filing & Intake Forms1
▸BISADDITIONAL INFORMATION1
02/06/2025301238809Open ↗
▸Other Documents2
▸BIS* * SUBGRADE 27-723,DIRC 15/711
01/28/2025301238809Open ↗
▸BIS* VENT. SYS.-ENGINEER/INSTALLER 27-136,7791
01/28/2025301238809Open ↗