← Back
Predominantly retail with other uses
245-02 245 STREET
QUEENS · Rosedale · BIN 4289120
💬 Discuss this project
2020Year Built
2Stories
K4Building Class
R3-2Zoning
5,789 sfGross Floor Area
3Units
0 Open ViolationsFDNY Report ↗
Predominantly retail with other uses · Owner of record: ZAROSEDALE, INC. · 4,254 sf lot · 1.36 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbing
Roof2p · 1 filing · 20 docs
Floor 21p · 1 filing · 20 docs
Floor 13p · 1 filing · 14 docs
Cellar3p · 2 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
ROSEDALE POST 766-VFW (VE103/22/2026
ZAROSEDALE503/22/2026
RENNON CONSTRUCTION103/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
11/06/2017$350K—DEPARTMENT OF NEW YORK, VETERANS OF FOREIGN WARS O → ZAROSEDALE, INC.— not available
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
MARIN ARCHITECTS, P.C.1308/19/2025
HC ARCHITECT, PC311/11/2021
ROYAL ENGINEERING, P.C106/07/2018
RAS PE CONSULTING ENGINEERS104/20/2018
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
MARIN ARCHITECTS, P.C.1303/21/2026
JP EXPEDITE603/21/2026
ALISTAS SERVICES203/21/2026
DANICO SERVICES203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
AMERISTAR CONSTRUCTION LLGeneral Contractor2007/08/2026
M-PAK CONSTRUCTION, INCGeneral Contractor1503/21/2026
CAPE PLUMBING INCPlumbing407/08/2026
SIGNS CADScaffold307/08/2026
RENNON CONSTRUCTION CORPGeneral Contractor203/21/2026
BRIAN CHIERICHELLAElectrical103/21/2026
ASCUATECH ELECTRICAL CORPElectrical103/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Z & T ENGINEERING, P.C.591508/19/2025
Building Lifecycle
All (82)Filed (18)Permit Issued (21)Signed Off (7)Violation (2)Inspection (4)Special Inspection (30)
10/07/2025
Signed off — Alteration
installation of one new hand sink, 3 compsink, commercial dishwasher, mop sink, and floor drains. replacement of existing toilet and hand sink in restroom
Q00522232-I1
09/18/2025
Signed off — Alteration
Interior fit of pizza shop/ take out only with commercial kitchen. Installation of new finishes & fixtures including but not limited to flooring, wall covering, drop ceiling, light fixtures, plumbing fixtures, and cooking equipment.
Q00521977-I1
09/17/2025
Special inspection requirement — Final
Fei Zeng
09/17/2025
Special inspection requirement — Interior lighting power
Fei Zeng
09/17/2025
Special inspection requirement — Maintenance information
Fei Zeng
09/17/2025
Special inspection requirement — Lighting controls
Fei Zeng
09/17/2025
Special inspection requirement — HVAC-R and service water heating system controls
Fei Zeng
09/17/2025
Special inspection requirement — HVAC-R and service water heating equipment
Fei Zeng
09/17/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
Fei Zeng
09/17/2025
Special inspection requirement — Heating Systems
Fei Zeng
09/17/2025
Special inspection requirement — Mechanical Systems
Fei Zeng
09/17/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Fei Zeng
09/17/2025
Special inspection requirement — Energy Code Compliance Inspections
Fei Zeng
09/17/2025
Special inspection requirement — Preliminary
Fei Zeng
09/04/2025
Permit issued — Plumbing
Q00522232-I1-PL
08/19/2025
Filed — Alteration
Interior fit of pizza shop/ take out only with commercial kitchen. Installation of new finishes & fixtures including but not limited to flooring, wall covering, drop ceiling, light fixtures, plumbing fixtures, and cooking equipment.
Q00521977-P5
11/20/2024
Signed off — Alteration
Q00049807-I1
11/01/2024
Signed off — Alteration
APPLICATION IS FILED FOR INSTALLATION OF TEMPORARY CONSTRUCTION FENCE
Q00030155-I1
04/18/2024
Permit issued — Mechanical Systems
Q00521977-I1-GC-CX
02/28/2024
Filed — Alteration
installation of one new hand sink, 3 compsink, commercial dishwasher, mop sink, and floor drains. replacement of existing toilet and hand sink in restroom
Q00522232-P6
02/12/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
01/03/2024
Filed — Alteration
installation of one new hand sink, 3 compsink, commercial dishwasher, mop sink, and floor drains. replacement of existing toilet and hand sink in restroom
Q00522232-P5
09/28/2023
Permit issued — Plumbing
Q00522232-I1-PL
05/25/2023
Permit issued — Mechanical Systems
Q00521977-I1-GC-CX
03/29/2023
Permit issued — General Construction
Q00521977-I1-GC-CX
03/10/2023
Filed — Alteration
installation of one new hand sink, 3 compsink, commercial dishwasher, mop sink, and floor drains. replacement of existing toilet and hand sink in restroom
Q00522232-P4
03/10/2023
Filed — Alteration
Interior fit of pizza shop/ take out only with commercial kitchen. Installation of new finishes & fixtures including but not limited to flooring, wall covering, drop ceiling, light fixtures, plumbing fixtures, and cooking equipment.
Q00521977-P4
03/06/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
Fei Zeng
03/06/2023
Special inspection requirement — HVAC-R and service water heating equipment
Fei Zeng
03/06/2023
Special inspection requirement — Lighting controls
Fei Zeng
03/06/2023
Special inspection requirement — Interior lighting power
Fei Zeng
03/06/2023
Special inspection requirement — HVAC-R and service water heating system controls
Fei Zeng
03/06/2023
Special inspection requirement — HVAC-R and service water piping design and insulation
Fei Zeng
03/06/2023
Special inspection requirement — Maintenance information
Fei Zeng
03/06/2023
Special inspection requirement — Preliminary
Fei Zeng
03/06/2023
Special inspection requirement — Final
Fei Zeng
03/06/2023
Special inspection requirement — Energy Code Compliance Inspections
Fei Zeng
03/06/2023
Special inspection requirement — Mechanical Systems
Fei Zeng
03/06/2023
Special inspection requirement — Heating Systems
Fei Zeng
12/08/2022
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
11/28/2022
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
10/18/2022
Permit issued — Plumbing
Q00522232-I1-PL
07/12/2022
Signed off — Alteration
ERECT ILLUMINATED, ACCESSORY BUSINESS CHANNEL LETTER WALL SIGN-A, NO CHANGE TO USE, EGRESS OR OCCUPATION
Q00576517-I1
07/12/2022
Signed off — Alteration
ERECT INDIRECT ILLUMINATED, ACCESSORY BUSINESS CANOPY SIGN-B, NO CHANGE TO USE, EGRESS OR OCCUPATION
Q00576546-I1
07/12/2022
Signed off — Alteration
Q00576565-I1
06/03/2022
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
04/27/2022
Filed — Alteration
installation of one new hand sink, 3 compsink, commercial dishwasher, mop sink, and floor drains. replacement of existing toilet and hand sink in restroom
Q00522232-P3
04/27/2022
Filed — Alteration
Interior fit of pizza shop/ take out only with commercial kitchen. Installation of new finishes & fixtures including but not limited to flooring, wall covering, drop ceiling, light fixtures, plumbing fixtures, and cooking equipment.
Q00521977-P2
04/27/2022
Special inspection requirement — Lighting controls
Fei Zeng
04/27/2022
Special inspection requirement — Mechanical Systems
Fei Zeng
04/27/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
Fei Zeng
04/27/2022
Special inspection requirement — Heating Systems
Fei Zeng
04/27/2022
Special inspection requirement — Energy Code Compliance Inspections
Fei Zeng
04/27/2022
Special inspection requirement — Final
Fei Zeng
04/22/2022
Permit issued — Mechanical Systems
Q00521977-I1-GC-CX
02/04/2022
Filed — Alteration
Interior fit of pizza shop/ take out only with commercial kitchen. Installation of new finishes & fixtures including but not limited to flooring, wall covering, drop ceiling, light fixtures, plumbing fixtures, and cooking equipment.
Q00521977-P1
11/15/2021
Permit issued — Sign
Q00576565-I1-SG
11/15/2021
Permit issued — Sign
Q00576517-I1-SG
11/15/2021
Permit issued — Sign
Q00576546-I1-SG
11/11/2021
Filed — Alteration
ERECT ILLUMINATED, ACCESSORY BUSINESS CHANNEL LETTER WALL SIGN-A, NO CHANGE TO USE, EGRESS OR OCCUPATION
Q00576517-I1
Latest 60 of 82 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offCAPE PLUMBING INC09/04/2025
DOB NOWMechanical SystemsSigned-offM-PAK CONSTRUCTION, INC04/18/2024
DOB NOWPlumbingSigned-offCAPE PLUMBING INC09/28/2023
DOB NOWMechanical SystemsSigned-offM-PAK CONSTRUCTION, INC05/25/2023
DOB NOWGeneral ConstructionSigned-offM-PAK CONSTRUCTION, INC03/29/2023
DOB NOWPlumbingSigned-offCAPE PLUMBING INC10/18/2022
DOB NOWMechanical SystemsSigned-offM-PAK CONSTRUCTION, INC04/22/2022
DOB NOWSignSigned-offSIGNS CAD CORP11/15/2021
DOB NOWSignSigned-offSIGNS CAD CORP11/15/2021
DOB NOWSignSigned-offSIGNS CAD CORP11/15/2021
DOB NOWPlumbingSigned-offCAPE PLUMBING INC07/22/2021
DOB NOWMechanical SystemsSigned-offM-PAK CONSTRUCTION, INC07/08/2021
DOB NOWConstruction FenceSigned-offAMERISTAR CONSTRUCTION LL03/16/2020
DOB NOWConstruction FenceSigned-offAMERISTAR CONSTRUCTION LL11/14/2019
DOB NOWConstruction FenceSigned-offAMERISTAR CONSTRUCTION LL10/31/2019
DOB NOWConstruction FenceSigned-offAMERISTAR CONSTRUCTION LL09/10/2019
DOB NOWConstruction FenceSigned-offAMERISTAR CONSTRUCTION LL06/13/2019
DOB NOWConstruction FenceSigned-offAMERISTAR CONSTRUCTION LL01/23/2019
DOB NOWSidewalk ShedSigned-offRENNON CONSTRUCTION CORP06/07/2018
DOB NOWConstruction FenceSigned-offAMERISTAR CONSTRUCTION LL04/30/2018
DOB NOWConstruction FenceSigned-offAMERISTAR CONSTRUCTION LL04/20/2018
BISSPISSUEDEXPERT FIRE SPRINKLER,LLC07/26/2021
BIS—ISSUEDRICHMOND CONSTRUCTION INC07/26/2018
1 project · most recent 05/14/2021
FiledStatusContractorScope
05/14/2021———
8 projects · most recent 08/12/2025
General Wiring
FiledStatusContractorScope
08/12/2025CompleteASCUATECH ELECTRICAL CORPGeneral Wiring
11/05/2024CompleteASCUATECH ELECTRICAL CORP1 meters, 1 new_meters
04/18/2024CompleteSIGNS CAD CORP—
12/01/2021CancelledSIGNS CAD CORP—
12/01/2021CompleteSIGNS CAD CORP—
12/01/2021CompleteSIGNS CAD CORP—
06/04/2018CompleteMEO ELECTRIC CORP—
05/13/2018CompleteGEORGE HOLNESS1 meters, 1 new_meters
▾Field Inspections (DOB CAP) — 4
DateTypeResultReport
02/12/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
12/08/2022Fail-Final PL - Up to 3 Requested FloorsFailView ↗
11/28/2022Fail-Final PL - Up to 3 Requested FloorsFailView ↗
06/03/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 51
DateRequirementInspectorRole
09/17/2025FinalFei Zengprogress
09/17/2025Interior lighting powerFei Zengenergy_progress
09/17/2025Maintenance informationFei Zengenergy_progress
09/17/2025Lighting controlsFei Zengenergy_progress
09/17/2025HVAC-R and service water heating system controlsFei Zengenergy_progress
09/17/2025HVAC-R and service water heating equipmentFei Zengenergy_progress
09/17/2025HVAC-R and service water piping design and insulationFei Zengenergy_progress
09/17/2025Heating SystemsFei Zengspecial
09/17/2025Mechanical SystemsFei Zengspecial
09/17/2025Fire-Resistant Penetrations and JointsFei Zengspecial
09/17/2025Energy Code Compliance InspectionsFei Zengprogress
09/17/2025PreliminaryFei Zengprogress
03/06/2023Fire-Resistant Penetrations and JointsFei Zengspecial
03/06/2023HVAC-R and service water heating equipmentFei Zengenergy_progress
03/06/2023Lighting controlsFei Zengenergy_progress
03/06/2023Interior lighting powerFei Zengenergy_progress
03/06/2023HVAC-R and service water heating system controlsFei Zengenergy_progress
03/06/2023HVAC-R and service water piping design and insulationFei Zengenergy_progress
03/06/2023Maintenance informationFei Zengenergy_progress
03/06/2023PreliminaryFei Zengprogress
03/06/2023FinalFei Zengprogress
03/06/2023Energy Code Compliance InspectionsFei Zengprogress
03/06/2023Mechanical SystemsFei Zengspecial
03/06/2023Heating SystemsFei Zengspecial
04/27/2022Lighting controlsFei Zengenergy_progress
Latest 25 of 51.
▾Tenants in the building
TenantSpaceFloorsRenovation projects
Pizza HutRestaurant / Food ServiceGround, Floors 1, 2
Project Q00576517 Alteration · LOC Issued · 11/11/2021
Project Q00576546 Alteration · LOC Issued · 11/11/2021
Project Q00576565 Alteration · LOC Issued · 11/11/2021
Project Q00521977 Alteration · LOC Issued · 05/14/2021
Project Q00522232 Alteration · LOC Issued · 05/14/2021
Project Q00522317 Alteration · Approved · 05/14/2021
Read from each project’s drawing title blocks and cover sheets and checked twice; a name appears only when it is the occupant, never the owner, landlord or designer.
▾Documents — 113 on file (BIS + DOB NOW)
▸Plans & Drawings18
▸DOB NOWPlans/Sketch18
08/29/2026Q00030155-I1Request digital key ↗
08/29/2026Q00049807-I1Request digital key ↗
08/27/2026Q00522232-P3Request digital key ↗
Showing 3 of 18 on file for this type
▸Applications & Permits4
▸BISPLAN / WORK APPROVAL APPLICATION2
02/07/2019421726644Open ↗
08/09/2018421648248Open ↗
▸BISWORK PERMIT APPLICATION2
07/26/2021421726644Open ↗
08/09/2018421648248Open ↗
▸Seals & Professional Certifications71
▸DOB NOWProgress Inspector Seal & Signature38
09/23/2026Q00521977-I1Open ↗
09/23/2026Q00521977-I1Open ↗
09/23/2026Q00521977-I1Open ↗
Showing 3 of 38 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature18
08/29/2026Q00030155-I1Open ↗
08/29/2026Q00049807-I1Open ↗
08/27/2026Q00522232-P3Open ↗
Showing 3 of 18 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature12
09/23/2026Q00521977-I1Open ↗
09/23/2026Q00521977-I1Open ↗
09/23/2026Q00521977-I1Open ↗
Showing 3 of 12 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT1
02/07/2019421726644Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST1
02/07/2019421726644Open ↗
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION1
02/07/2019421726644Open ↗
▸Trade Schedules & Equipment5
▸BISSEWER CUT-OFF2
08/09/2018421648248Open ↗
08/09/2018421648248Open ↗
▸BISGAS CUT-OFF1
08/09/2018421648248Open ↗
▸BISELECTRIC CUT-OFF1
08/09/2018421648248Open ↗
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE1
02/07/2019421726644Open ↗
▸Safety & Tenant Protection3
▸BISEXCAVATION OR DEMOLITION: 5-DAY NOTICE1
08/09/2018421648248Open ↗
▸BISDEMOLITION SUBMITTAL CERTIFICATION FORM1
08/09/2018421648248Open ↗
▸BISSRO MD ANTI-HARASSMENT CHECKLIST1
08/09/2018421648248Open ↗
▸Environmental & Asbestos2
▸BISRODENT CONTROL1
08/09/2018421648248Open ↗
▸BISASBESTOS: COMPLETION OR CLOSEOUT (ACP20/21/5)1
08/09/2018421648248Open ↗
▸Energy Compliance1
▸DOB NOWEN2: As Built Energy Analysis.1
08/13/2026Q00521977-I1Open ↗
▸Approvals, Objections & Sign-offs3
▸BISLETTERS - SUPPORTING DOCUMENTATION1
08/09/2018421648248Open ↗
▸BISTAP LETTER - DOM SVC : DEP-DOM1
08/09/2018421648248Open ↗
▸BISLANDMARKS APPROVAL1
08/09/2018421648248Open ↗
▸Cost, Insurance & Ownership3
▸BISCOST AFFIDAVIT1
02/07/2019421726644Open ↗
▸BISDEPT OF FINANCE VERIFICATION1
08/09/2018421648248Open ↗
▸BISPROJECT-SPECIFIC GL INSURANCE1
08/09/2018421648248Open ↗
▸Filing & Intake Forms2
▸BISEFILING COVER SHEET2
02/07/2019421726644Open ↗
07/02/2018421648248Open ↗
▸Other Documents1
▸DOB NOWBSA Meeting Minutes/BSA Resolution1
08/13/2026Q00049807-I1Open ↗