← Back
Elevator apt, fireproof without stores
245-10 GRND CNTRL PKWY SR S
QUEENS · Glen Oaks-Floral Park-New Hyde Park · BIN 4456352
💬 Discuss this project
1966Year Built
6Stories
D3Building Class
R6AZoning
263,883 sfGross Floor Area
240Units
LL97 CoveredRent Stabilized4 Open Violations ▸FISP: SAFEFDNY Report ↗
Elevator apt, fireproof without stores · Owner of record: GF GRAND CENTRAL LLC · 153,000 sf lot · 1.72 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalEquipmentGeneral
Roof11p · 6 filings · 19 docs
Floor 14p · 2 filings · 6 docs
Cellar1 filing · 3 docs
Site & exterior10p · 4 filings · 12 docs
Filed — no permit issued10p · 1 filing · 3 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
BLDG MANAGEMENT CO., INC.2507/08/2026
FRANCESCAS REALTY ASSOCIATES1303/21/2026
GF GRAND CENTRAL LLC C O BLDGE M1103/21/2026
JERRICK ASSOCIATES507/08/2026
T-MOBILE203/21/2026
FRANCHESCHA REALTY ASSOC203/21/2026
FRANCESCA103/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
PVE ENGINEERING108/11/2023
GT WIRELESS ENGINEERING, PLLC111/30/2022
KMB DESIGN GROUP, LLC406/30/2022
COM-EX ENGINEERING OF NY, PLLC109/08/2020
SCALAR ARCHITECTURE PC111/07/2018
NB&C105/30/2018
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
CONSTRUCTION PERMIT SERVICES403/21/2026
RIZZO GROUP203/21/2026
CCM CONSULTING GROUP, INC.303/21/2026
AE DESIGN SOLUTION203/21/2026
NORTHEAST EXPEDITING203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
OVERLAND CONTRACTING INCGeneral Contractor707/08/2026
TOTAL NY CONSTRUCTION CORPGeneral Contractor303/21/2026
ETAK SYSTEMS LLCGeneral Contractor303/21/2026
AGL DEVELOPMENT LLCGeneral Contractor303/21/2026
JERRICK ASSOCIATES INCGeneral Contractor207/08/2026
JUS-COM INCGeneral Contractor107/08/2026
ALLIED TELECOM CORPGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
PARTRIDGE VENTURE ENGINEE7690108/11/2023
R MARSAC CONSULTING LLC329111/30/2022
KMB DESIGN GROUP, LLC513306/30/2022
ELEVATED ENGINEERING PLLC3692109/08/2020
Building Lifecycle
All (121)Filed (9)Permit Issued (10)Signed Off (5)Facade (FISP) (15)Violation (60)Inspection (1)Objection (20)Special Inspection (1)
05/06/2026
Violation issued (HPD, closed)
C
05/06/2026
Violation issued (HPD, closed)
C
01/12/2026
Violation issued (HPD, closed)
C
01/12/2026
Violation issued (HPD, closed)
C
01/05/2026
Violation issued (HPD, closed)
B
01/05/2026
Violation issued (HPD, closed)
C
12/05/2025
Violation issued (HPD, closed)
C
12/05/2025
Violation issued (HPD, closed)
C
11/29/2025
Violation issued (HPD, closed)
B
11/29/2025
Violation issued (HPD, closed)
B
10/15/2025
Violation issued (HPD, closed)
C
08/03/2024
Violation issued (FDNY_NOV, closed)
04/17/2024
Signed off — Alteration
Q00903487-I1
02/21/2024
Cycle 9 facade report submitted
02/20/2024
Cycle 9 facade report signed — SAFE
01/25/2024
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
01/17/2024
Cycle 9 facade inspection completed
01/15/2024
Violation issued (HPD, closed)
C
12/15/2023
Violation issued (HPD, closed)
C
12/15/2023
Violation issued (HPD, closed)
C
12/15/2023
Violation issued (HPD, closed)
C
12/15/2023
Violation issued (HPD, closed)
C
11/23/2023
Violation issued (HPD, closed)
C
11/23/2023
Violation issued (HPD, closed)
C
11/23/2023
Violation issued (HPD, closed)
C
10/22/2023
Violation issued (HPD, closed)
C
09/08/2023
Permit issued — General Construction
Q00903487-I1-GC-CX
08/11/2023
Filed — Alteration
Q00903487-I1
04/13/2023
Signed off — Alteration
Q00621643-I1
01/09/2023
Permit issued — Antenna
Q00621643-I1-AN
11/30/2022
Filed — Alteration
Q00621643-I1
09/16/2022
Violation issued (HPD, closed)
B
09/16/2022
Violation issued (HPD, closed)
C
09/16/2022
Violation issued (HPD, closed)
C
09/16/2022
Violation issued (HPD, closed)
C
09/07/2022
Objection raised — Other
09/07/2022
Objection raised — Zoning
07/06/2022
Objection raised — Scope
07/06/2022
Objection resolved — Addressed
06/30/2022
Filed — Alteration
DECOMMISSION OF EXISTING SPRINT-NEXTEL-CW TELECOM SITE. REMOVE 2 EQUIPMENT PLATFORMS, 11 ANTENNAS, 11 RRH , 2 GPS FROM ROOF. REMOVE CABLES FROM BASEMENT, FACADE & ROOF. NO CHANGE IN USE, EGRESS OR OCCUPANCY. ORIGINAL APP# 400773481.
Q00764034-I1
05/17/2022
Permit issued — Antenna
Q00680319-I1-AN
05/03/2022
Objection raised — Fire_Protection
05/03/2022
Objection resolved — Addressed
05/02/2022
Filed — Alteration
AT&T - Replacement of existing antennas on roof. Removal of RRH units and retrofit of existing cabinet in existing equipment room on ground floor. All work in compliance with TPPN 5/98. No change to occupancy, use, or egress.
Q00680319-I1
04/20/2022
Permit issued — Mechanical Systems
Q00618312-I1-GC-CX
03/03/2022
Filed — Alteration
Q00618312-I1
11/23/2021
Permit issued — Antenna
Q00592768-I1-AN
11/17/2021
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
11/17/2021
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
11/17/2021
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
10/25/2021
Permit issued — Antenna
Q00592768-I1-AN
09/24/2021
Objection raised — 2014-AN AC 28-104.7.1-Administ
09/24/2021
Objection resolved — Addressed
09/24/2021
Objection raised — 1998-AN TPPN 5/98-TPPN-98AN
09/24/2021
Objection resolved — Addressed
09/23/2021
Filed — Alteration
Replacement of existing antennas & installation of new RRUs on the rooftop (AT&T - 10074223) as per plans. All work is in compliance with TPPN 5/98 & BB 11/2021. No change to use, egress or occupancy.
Q00592768-I1
06/11/2021
Violation issued (HPD, closed)
C
11/13/2020
Signed off — Alteration
Q00352310-I1
10/30/2020
Signed off — Alteration
INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
Q00096251-I1
10/27/2020
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
Latest 60 of 121 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offTOTAL NY CONSTRUCTION COR09/08/2023
DOB NOWAntennaSigned-offAGL DEVELOPMENT LLC01/09/2023
DOB NOWAntennaPermit IssuedOVERLAND CONTRACTING INC05/17/2022
DOB NOWMechanical SystemsPermit IssuedETAK SYSTEMS LLC04/20/2022
DOB NOWAntennaPermit IssuedOVERLAND CONTRACTING INC11/23/2021
DOB NOWAntennaPermit IssuedOVERLAND CONTRACTING INC10/25/2021
DOB NOWAntennaSigned-offJUS-COM INC10/01/2020
DOB NOWSidewalk ShedSigned-offGE 2A CONSTRUCTION11/13/2019
DOB NOWSidewalk ShedSigned-offGE 2A CONSTRUCTION11/07/2018
DOB NOWAntennaSigned-offALLIED TELECOM CORP06/06/2018
BISOTISSUEDJERRICK ASSOCIATES INC03/25/2019
BISPLISSUEDCOSME PLBG & HTG CORP01/04/2019
BISOTISSUEDJERRICK ASSOCIATES INC11/13/2018
BISPLISSUEDCOSME PLBG & HTG CORP12/18/2017
BIS—ISSUEDKMV-NY INC12/12/2017
BISOTISSUEDKMV-NY INC12/12/2017
BISOTISSUEDKMV-NY INC12/12/2017
BISOTISSUEDKMV-NY INC11/28/2017
BIS—ISSUEDKMV-NY INC11/17/2017
BISPLISSUEDCOSME PLBG & HTG CORP07/27/2017
BISOTISSUEDKMV-NY INC07/07/2017
BISPLISSUEDBELL FUEL OIL, LLC03/01/2017
BISOTISSUEDABILENE INC01/10/2017
BISOTISSUEDCROSSLINK WIRELESS LLC08/16/2016
BISOTISSUEDVMMA CONSTRUCTION LLC06/16/2016
BISOTISSUEDCROSSLINK WIRELESS LLC04/26/2016
BISPLISSUEDBELL FUEL OIL, LLC03/11/2016
BISFSISSUEDABILENE, INC11/30/2015
BISOTISSUEDCHARLES M DWYER INC09/21/2015
BISOTISSUEDBECHTEL INFRASTRUCTURE AN09/10/2015
BISOTISSUEDABILENE INC08/21/2015
BISOTISSUEDVMMA CONSTRUCTION LLC07/08/2015
BISPLISSUEDDEMAR PLUMBING CORP05/29/2015
BISMHISSUEDDEMAR PLUMBING CORP04/10/2015
BISPLISSUEDBELL FUEL OIL, LLC03/09/2015
BISOTISSUEDABILENE INC03/09/2015
BISOTISSUEDODYSSIA GLOBAL COMM. CORP02/04/2014
BISPLISSUEDHARRIS WATER MAIN & SEWER04/25/2013
BISOTISSUEDUB CONSTRUCTION INC04/04/2013
BISOTISSUEDCOMMUNICATION COMPONENT S01/03/2013
+ 20 more permits on file
2 projects · most recent 02/27/2023
General Wiring
FiledStatusContractorScope
02/27/2023CompleteDAVEN ELECTRIC CORPGeneral Wiring
11/07/2018CompleteBOROWIDE ELECT'L CONTR'S—
▾Field Inspections (DOB CAP) — 1
DateTypeResultReport
01/25/2024Pass-Final General Construction Non-Directive 14PassView ↗
▾Special Inspection Requirements (DOB NOW) — 1
DateRequirementInspectorRole
11/05/2018FinalJULIO SALCEDO-FERNANDEZprogress
▾Documents — 439 on file (BIS + DOB NOW)
▸Plans & Drawings9
▸DOB NOWPlans/Sketch8
08/28/2026Q00096251-I1Request digital key ↗
08/26/2026Q00618312-I1Request digital key ↗
08/26/2026Q00764034-I1Request digital key ↗
Showing 3 of 8 on file for this type
▸DOB NOWPlans/Sketch - Antenna1
08/28/2026Q00352310-I1Request digital key ↗
▸Applications & Permits98
▸BISPLAN / WORK APPROVAL APPLICATION65
09/02/2020421551797Open ↗
09/01/2020421551797Open ↗
08/31/2020421551797Open ↗
Showing 3 of 65 on file for this type
▸BISWORK PERMIT APPLICATION28
09/18/2019420810386Open ↗
11/26/2018421696962Open ↗
12/20/2017421551797Open ↗
Showing 3 of 28 on file for this type
▸BISApplication Withdrawal/Address Change Form OP-1132
04/27/2020420184240Open ↗
05/03/2017440204280Open ↗
▸BISCERTIFICATE OF OCCUPANCY: APPLICATION1
11/28/2018421551797Open ↗
▸BISNon-Directive 14 Construction Sign Off Including Sign Applications1
09/29/2016440149055Open ↗
▸BISPLAN - WORK & PERMITS - SUPPPORTING DOCUMENTATION1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Zoning, Tax Lot & Property Records2
▸BISVERIFY TAX LOT1
08/17/2021421551797Open ↗
▸BISCO OBJ: VERIFY ADDRESS-TOPO STAMP1
08/17/2021421551797Open ↗
▸Seals & Professional Certifications80
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION53
01/29/2020421551797Open ↗
09/09/2019420810386Open ↗
09/09/2019420810386Open ↗
Showing 3 of 53 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature9
08/29/2026Q00042870-I1Open ↗
08/28/2026Q00352310-I1Open ↗
08/26/2026Q00618312-I1Open ↗
Showing 3 of 9 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT7
11/28/2018421696962Open ↗
08/23/2017421543333Open ↗
07/11/2017421524764Open ↗
Showing 3 of 7 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST5
11/28/2018421696962Open ↗
08/23/2017421543333Open ↗
07/11/2017421524764Open ↗
Showing 3 of 5 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISAPPLICANT OWNER SIGNATURE1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWProgress Inspector Seal & Signature1
08/22/2026Q00096251-I1Open ↗
▸Trade Schedules & Equipment16
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE10
05/02/2019421551797Open ↗
04/11/2019421551797Open ↗
04/05/2019421551797Open ↗
Showing 3 of 10 on file for this type
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT2
03/03/2017440204280Open ↗
Showing 1 of 2 on file for this type
▸BISSCHEDULE B - PLUMBING2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISEQUIPMENT USE PERMITS1
03/02/2020421551797Open ↗
▸BISEQUIPMENT USE APPLICATION/PERMIT1
03/02/2020421551797Open ↗
▸Safety & Tenant Protection7
▸BISSTREET TREE CHECKLIST3
09/22/2017421551797Open ↗
Showing 1 of 3 on file for this type
▸BISTenant Protection Plan and Notes3
11/28/2018421696962Open ↗
11/17/2017421551797Open ↗
07/11/2017421524764Open ↗
▸DOB NOWTenant Protection Plan1
08/13/2026Q00352310-I1Open ↗
▸Environmental & Asbestos28
▸BISASBESTOS: CERTIFICATION (DEP ACP5)16
11/28/2018421696962Open ↗
12/01/2017421543333Open ↗
09/22/2017421551797Open ↗
Showing 3 of 16 on file for this type
▸DOB NOWDEP ACP-5: Asbestos Assessment Report8
08/28/2026Q00352310-I1Open ↗
08/26/2026Q00618312-I1Open ↗
08/24/2026Q00903487-I1Open ↗
Showing 3 of 8 on file for this type
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸Energy Compliance46
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS25
01/29/2020421551797Open ↗
11/28/2018421696962Open ↗
11/17/2017421551797Open ↗
Showing 3 of 25 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS14
06/05/2020421696962Open ↗
01/29/2020421551797Open ↗
01/15/2019421543333Open ↗
Showing 3 of 14 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY5
06/05/2020421696962Open ↗
Showing 1 of 5 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸Inspections & Test Reports7
▸BISTECHNICAL REPORT: RESPONSIBILITY7
09/11/2020421551797Open ↗
07/22/2020421551797Open ↗
07/22/2020421551797Open ↗
Showing 3 of 7 on file for this type
▸Approvals, Objections & Sign-offs55
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST26
02/23/2021421551797Open ↗
12/15/2020421551797Open ↗
09/14/2020421551797Open ↗
Showing 3 of 26 on file for this type
▸BISADMINISTRATIVE OBJECTIONS10
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 10 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION9
04/24/2020420184240Open ↗
07/25/2019420184240Open ↗
07/25/2019420184240Open ↗
Showing 3 of 9 on file for this type
▸BISSCHEDULE A - OCCUPANCY / USE9
09/02/2020421551797Open ↗
09/01/2020421551797Open ↗
08/31/2020421551797Open ↗
Showing 3 of 9 on file for this type
▸BISCONSTRUCTION CODE DETERMINATION1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Cost, Insurance & Ownership35
▸BISCOST AFFIDAVIT35
03/01/2021421551797Open ↗
06/05/2020421696962Open ↗
03/20/2020421696962Open ↗
Showing 3 of 35 on file for this type
▸Filing & Intake Forms54
▸BISADDITIONAL INFORMATION23
09/10/2020421551797Open ↗
08/28/2020421551797Open ↗
05/13/2020421696962Open ↗
Showing 3 of 23 on file for this type
▸BISEFILING COVER SHEET16
11/28/2018421696962Open ↗
09/22/2017421551797Open ↗
09/22/2017421551797Open ↗
Showing 3 of 16 on file for this type
▸BISBOROUGH INTAKE FORM12
04/27/2020420184240Open ↗
01/10/2020420184240Open ↗
10/07/2019420184240Open ↗
Showing 3 of 12 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸Other Documents2
▸BISPLOT DIAGRAM2
09/22/2017421551797Open ↗
Showing 1 of 2 on file for this type