← Back
Three families
245-12 149 AVENUE
QUEENS · BIN 4289830
💬 Discuss this project
1960Year Built
2Stories
C0Building Class
R3XZoning
2,256 sfGross Floor Area
3Units
Rent Stabilized34 Open Violations ▸FDNY Report ↗
Three families · Owner of record: 245-12 149TH LLC · 2,798 sf lot · 0.81 FAR built · Flood zone X500
Locations of Work
No floor-level scope or drawing coverage on file for this building.
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
10/18/2023$645K—CITIZENS BANK, N.A. → 245-12 149TH LLC$286/sf building
05/08/2019$608K—Private party → CITIZENS BANK, N.A.$269/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
PARKER AND WEST ENGINEERING, PLLC103/31/2026
JAMES A BOWLES PE307/29/2024
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
BERNARD CLAREGeneral Contractor104/09/2026
SUNRUN INSTALLATION SVCGeneral Contractor104/09/2026
ROCK E SMALL PLBG&HTG INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
PARKER AND WEST ENGINEERI5272103/31/2026
Building Lifecycle
All (72)Filed (4)Permit Issued (3)Signed Off (2)Violation (49)Inspection (2)Objection (6)Special Inspection (6)
07/22/2026
Signed off — Alteration
FILING HEREWITH TAX ABATEMENT APPLICATION FOR INSTALLATION OF ROOF-MOUNTED SOLAR PANELS. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
Q01379349-I1
04/06/2026
Permit issued — Solar
Q01379349-I1-SL
03/31/2026
Filed — Alteration
FILING HEREWITH TAX ABATEMENT APPLICATION FOR INSTALLATION OF ROOF-MOUNTED SOLAR PANELS. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
Q01379349-I1
03/31/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
Walid Abdulla
03/31/2026
Special inspection requirement — Air barrier - visual inspection
Walid Abdulla
03/27/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Walid Abdulla
03/27/2026
Special inspection requirement — Energy Code Compliance Inspections
Walid Abdulla
03/27/2026
Special inspection requirement — Final
Walid Abdulla
12/24/2025
Signed off — Alteration
Job filed to remove partitions to remove violation #34214775K
Q00965684-I1
12/05/2025
Permit issued — General Construction
Q00965684-I1-GC
11/25/2025
Violation issued (HPD, open)
I
08/04/2025
Inspection — Pass-Final PL - Up to 9 Requested Floors
Pass
View inspection ↗
12/05/2024
Violation issued (HPD, open)
I
10/11/2024
Objection resolved — Addressed
08/12/2024
Objection raised — Other
07/29/2024
Filed — Alteration
Job filed to remove violation by removing kitchen sink, stove and 3 piece bathroom fixtures from Cellar. Amendment filed to add stove in basement.
Q00965677-P1
06/18/2024
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
05/01/2024
Permit issued — Plumbing
Q00965677-I1-PL
02/06/2024
Objection resolved — Addressed
02/06/2024
Objection resolved — Addressed
01/04/2024
Objection raised — Other
01/04/2024
Objection raised — Other
12/21/2023
Filed — Alteration
Job filed to remove partitions to remove violation #34214775K
Q00965684-I1
12/21/2023
Filed — Alteration
Job filed to remove violation by removing kitchen sink, stove and 3 piece bathroom fixtures from Cellar. Amendment filed to add stove in basement.
Q00965677-I1
11/20/2023
Special inspection requirement — Final
JAMES BOWLES
12/14/2013
Violation issued (HPD, open)
B
12/14/2013
Violation issued (HPD, closed)
C
02/27/2013
Violation issued (HPD, closed)
C
02/27/2013
Violation issued (HPD, closed)
C
02/27/2013
Violation issued (HPD, closed)
C
02/27/2013
Violation issued (HPD, open)
B
02/27/2013
Violation issued (HPD, open)
B
01/15/2013
Violation issued (HPD, open)
B
01/15/2013
Violation issued (HPD, closed)
C
01/02/2013
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
12/12/2012
Violation issued (HPD, closed)
C
12/04/2012
Violation issued (HPD, closed)
C
11/21/2012
Violation issued (HPD, closed)
C
11/21/2012
Violation issued (HPD, closed)
C
11/21/2012
Violation issued (HPD, open)
C
10/06/2012
Violation issued (ECB, closed)
Construction
10/06/2012
Violation issued (ECB, closed)
Quality of Life
07/20/2012
Violation issued (HPD, open)
B
07/20/2012
Violation issued (HPD, open)
B
07/20/2012
Violation issued (HPD, open)
B
07/20/2012
Violation issued (HPD, open)
B
07/20/2012
Violation issued (HPD, open)
B
07/20/2012
Violation issued (HPD, closed)
C
06/20/2012
Violation issued (HPD, open)
C
06/20/2012
Violation issued (HPD, open)
B
06/20/2012
Violation issued (HPD, open)
C
06/20/2012
Violation issued (HPD, open)
B
04/23/2012
Violation issued (HPD, open)
B
04/03/2012
Violation issued (HPD, open)
A
04/03/2012
Violation issued (HPD, open)
B
04/03/2012
Violation issued (HPD, open)
B
04/03/2012
Violation issued (HPD, open)
C
04/03/2012
Violation issued (HPD, open)
B
04/03/2012
Violation issued (HPD, open)
C
04/03/2012
Violation issued (HPD, open)
B
Latest 60 of 72 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSolarSigned-offSUNRUN INSTALLATION SVC04/06/2026
DOB NOWGeneral ConstructionSigned-offBERNARD CLARE12/05/2025
DOB NOWPlumbingSigned-offROCK E SMALL PLBG&HTG INC05/01/2024
1 project · most recent 07/29/2024
Water/Sanitary
FiledStatusContractorScope
07/29/2024Signed-offROCK E SMALL PLBG&HTG INCWater/Sanitary
1 project · most recent 03/31/2026
General Wiring
FiledStatusContractorScope
03/31/2026CompleteSUNRUN SOLAR ELECTL CORPGeneral Wiring
1 project · most recent 03/31/2026
FiledStatusContractorScope
03/31/2026Signed-offSUNRUN INSTALLATION SVC19 panels, 8.11 kw, 168.19 roof_area_sqft
▾Field Inspections (DOB CAP) — 2
DateTypeResultReport
08/04/2025Pass-Final PL - Up to 9 Requested FloorsPassView ↗
06/18/2024Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 6
DateRequirementInspectorRole
03/31/2026Structural Stability – Alterations of existing buildingsWalid Abdullaspecial
03/31/2026Air barrier - visual inspectionWalid Abdullaenergy_progress
03/27/2026Fire-Resistant Penetrations and JointsWalid Abdullaspecial
03/27/2026Energy Code Compliance InspectionsWalid Abdullaprogress
03/27/2026FinalWalid Abdullaprogress
11/20/2023FinalJAMES BOWLESprogress
▾Documents — 19 on file (BIS + DOB NOW)
▸Plans & Drawings4
▸DOB NOWPlans/Sketch4
08/29/2026Q01379349-I1Request digital key ↗
08/23/2026Q00965684-I1Request digital key ↗
08/21/2026Q00965677-P1Request digital key ↗
Showing 3 of 4 on file for this type
▸Seals & Professional Certifications10
▸DOB NOWDPL-1: Design Professional Seal & Signature4
08/29/2026Q01379349-I1Open ↗
08/23/2026Q00965684-I1Open ↗
08/13/2026Q00965677-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWProgress Inspector Seal & Signature4
08/25/2026Q01379349-I1Open ↗
08/25/2026Q01379349-I1Open ↗
08/25/2026Q01379349-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature2
08/25/2026Q01379349-I1Open ↗
08/25/2026Q01379349-I1Open ↗
▸Environmental & Asbestos4
▸DOB NOWDEP ACP-5: Asbestos Assessment Report4
08/29/2026Q01379349-I1Open ↗
08/23/2026Q00965684-I1Open ↗
08/13/2026Q00965677-P1Open ↗
Showing 3 of 4 on file for this type
▸Approvals, Objections & Sign-offs1
▸DOB NOWUtility Company Final Acceptance Letter1
08/29/2026Q01379349-I1Open ↗