Two family converted from one family
245-19 148 DRIVE
QUEENS · BIN 4289795
💬 Discuss this project
1955Year Built
2Stories
B3Building Class
R3XZoning
2,254 sfGross Floor Area
2Units
0 Open ViolationsFDNY Report ↗
Two family converted from one family · 4,000 sf lot · 0.56 FAR built · Flood zone X500
Locations of Work
ArchitectureStructuralMechanicalPlumbingLandscapeCivil
Roof1p · 1 filing · 16 docs
Floor 25p · 1 filing · 20 docs
Floor 17p · 2 filings · 20 docs
Cellar7p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
DRN HOLDINGS203/22/2026
VA BUILDERS CORP103/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
12/14/2023$1.2M—— → —$532/sf building
10/29/2020$400K—— → —$177/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
PIROOZ ENGINEERING, P.C.808/03/2023
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
V.A BUILDERS CORPGeneral Contractor1007/08/2026
INFINITI ESC PLUMBING CORPlumbing207/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
PIROOZ ENGINEERING P.C7177708/03/2023
TRIANGLE INSPECTION & TES7495308/03/2023
Building Lifecycle
All (63)Filed (8)Permit Issued (7)Signed Off (2)Violation (4)Inspection (8)Objection (4)Special Inspection (30)
11/24/2023
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
11/20/2023
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
11/13/2023
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
11/02/2023
Permit issued — Foundation
Q00529674-I1-GC-CX
09/15/2023
Signed off — Alteration
PROPOSED PLUMBING WORK IN CONJUNCTION WITH ALT CO APPLICATION FUILED IN BIS UNDER JOB # Q00529674
Q00541980-I1
09/15/2023
Signed off — Alteration
INSTALLATION OF A TEMPORARY CONSTRUCTION FENCE
Q00541981-I1
08/14/2023
Special inspection requirement — Soil Percolation Test - Private On-Site Storm Water Drainage Disposal Systems, and Detention Facilities
Rajasekhar Sakhamuri
08/14/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
PIROOZ SOLTANIZADEH
08/14/2023
Special inspection requirement — HVAC-R and service water heating system controls
PIROOZ SOLTANIZADEH
08/14/2023
Special inspection requirement — HVAC-R and service water heating equipment
PIROOZ SOLTANIZADEH
08/14/2023
Special inspection requirement — HVAC-R and service water piping design and insulation
PIROOZ SOLTANIZADEH
08/14/2023
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
PIROOZ SOLTANIZADEH
08/07/2023
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
08/03/2023
Filed — Alteration
PROPOSED PLUMBING WORK IN CONJUNCTION WITH ALT CO APPLICATION FUILED IN BIS UNDER JOB # Q00529674
Q00541980-P2
08/03/2023
Special inspection requirement — HVAC-R and service water piping design and insulation
PIROOZ SOLTANIZADEH
08/03/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
PIROOZ SOLTANIZADEH
08/03/2023
Special inspection requirement — HVAC-R and service water heating system controls
PIROOZ SOLTANIZADEH
08/03/2023
Special inspection requirement — Soil Percolation Test - Private On-Site Storm Water Drainage Disposal Systems, and Detention Facilities
Rajasekhar Sakhamuri
08/03/2023
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
PIROOZ SOLTANIZADEH
08/03/2023
Special inspection requirement — HVAC-R and service water heating equipment
PIROOZ SOLTANIZADEH
06/26/2023
Filed — Alteration
PROPOSED PLUMBING WORK IN CONJUNCTION WITH ALT CO APPLICATION FUILED IN BIS UNDER JOB # Q00529674
Q00541980-P1
06/26/2023
Filed — Alteration CO
CONVERSION OF AN EXISTING ONE STORY ONE FAMILY FRAME BUILDING TO A TWO STORY TWO FAMILY DWELLING WITH CELLAR. WORK INCLUDES HORIZONTAL AND VERTICAL ENLARGEMENT
Q00529674-P6
06/22/2023
Special inspection requirement — Fenestration air leakage
PIROOZ SOLTANIZADEH
06/22/2023
Special inspection requirement — HVAC-R and service water heating system controls
PIROOZ SOLTANIZADEH
06/22/2023
Special inspection requirement — Maintenance information
PIROOZ SOLTANIZADEH
06/22/2023
Special inspection requirement — Fenestration areas
PIROOZ SOLTANIZADEH
06/22/2023
Special inspection requirement — Metering
PIROOZ SOLTANIZADEH
06/22/2023
Special inspection requirement — Ventilation and air distribution system
PIROOZ SOLTANIZADEH
06/22/2023
Special inspection requirement — Air barrier - visual inspection
PIROOZ SOLTANIZADEH
06/22/2023
Special inspection requirement — Lowest Floor Elevation
06/22/2023
Special inspection requirement — Structural Wood Frame
PIROOZ SOLTANIZADEH
06/22/2023
Special inspection requirement — Fenestration and door U-factor and product ratings
PIROOZ SOLTANIZADEH
06/22/2023
Special inspection requirement — Footing and Foundation
PIROOZ SOLTANIZADEH
06/22/2023
Special inspection requirement — Interior lighting power
PIROOZ SOLTANIZADEH
06/22/2023
Special inspection requirement — HVAC-R and service water piping design and insulation
PIROOZ SOLTANIZADEH
06/22/2023
Special inspection requirement — Permanent certificate
PIROOZ SOLTANIZADEH
06/22/2023
Special inspection requirement — Concrete - Cast-In-Place
PIROOZ SOLTANIZADEH
06/22/2023
Special inspection requirement — Excavations - Sheeting, Shoring, and Bracing
PIROOZ SOLTANIZADEH
06/22/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
PIROOZ SOLTANIZADEH
06/22/2023
Special inspection requirement — Fire-Resistance Rated Construction
PIROOZ SOLTANIZADEH
06/09/2023
Permit issued — Plumbing
Q00541980-I1-PL
12/06/2022
Permit issued — Construction Fence
Q00541981-I1-FN
08/12/2022
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
08/12/2022
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
08/12/2022
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
08/12/2022
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
06/04/2022
Violation issued (ECB, closed)
Construction
05/26/2022
Permit issued — Earth Work
Q00529674-I1-GC-CX
05/11/2022
Objection resolved — Addressed
05/09/2022
Objection raised — Scope
05/04/2022
Filed — Alteration CO
CONVERSION OF AN EXISTING ONE STORY ONE FAMILY FRAME BUILDING TO A TWO STORY TWO FAMILY DWELLING WITH CELLAR. WORK INCLUDES HORIZONTAL AND VERTICAL ENLARGEMENT
Q00529674-P2
03/14/2022
Permit issued — Plumbing
Q00541980-I1-PL
02/07/2022
Permit issued — Foundation
Q00529674-I1-GC-CX
01/21/2022
Filed — Alteration CO
CONVERSION OF AN EXISTING ONE STORY ONE FAMILY FRAME BUILDING TO A TWO STORY TWO FAMILY DWELLING WITH CELLAR. WORK INCLUDES HORIZONTAL AND VERTICAL ENLARGEMENT
Q00529674-P1
12/02/2021
Violation issued (ECB, closed)
Construction
11/26/2021
Permit issued — Construction Fence
Q00541981-I1-FN
11/10/2021
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
10/08/2021
Objection resolved — Addressed
10/06/2021
Objection raised — Scope
10/05/2021
Filed — Alteration
INSTALLATION OF A TEMPORARY CONSTRUCTION FENCE
Q00541981-I1
Latest 60 of 63 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWFoundationPermit IssuedV.A BUILDERS CORP11/02/2023
DOB NOWPlumbingSigned-offINFINITI ESC PLUMBING COR06/09/2023
DOB NOWConstruction FenceSigned-offV.A BUILDERS CORP12/06/2022
DOB NOWEarth WorkPermit IssuedV.A BUILDERS CORP05/26/2022
DOB NOWPlumbingSigned-offINFINITI ESC PLUMBING COR03/14/2022
DOB NOWFoundationPermit IssuedV.A BUILDERS CORP02/07/2022
DOB NOWConstruction FenceSigned-offV.A BUILDERS CORP11/26/2021
1 project · most recent 06/26/2023
Heating Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
06/26/2023Permit IssuedV.A BUILDERS CORPHeating Systems, Ventilation Systems
Heating
A.O. Smith GPHE-50 76,000 BTU · Water Heater ×12
Rheem GMES960804CN 75,000 BTU · Furnace ×12
Ventilation
Panasonic FV-05VQ5 50 CFM · Exhaust Fan ×30
FV-15VQ5 150 CFM · Exhaust Fan ×12
1 project · most recent 05/17/2022
General Wiring
FiledStatusContractorScope
05/17/2022CompletePOWER SURGE ELECTRIC, INCGeneral Wiring
1 project · most recent 06/26/2023
Wood
FiledStatusContractorScope
06/26/2023Permit IssuedV.A BUILDERS CORPWood
▾Field Inspections (DOB CAP) — 8
DateTypeResultReport
11/24/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
11/20/2023Fail-Final PL - Up to 3 Requested FloorsFailView ↗
11/13/2023Certified Gas-Gas-Piping-RoughingCertifiedView ↗
08/07/2023Pass-Final CND-Occupancy InspectionPassView ↗
08/12/2022Certified Gas-Gas-Piping-RoughingCertifiedView ↗
08/12/2022Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
08/12/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
08/12/2022Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 94
DateRequirementInspectorRole
08/14/2023Soil Percolation Test - Private On-Site Storm Water Drainage Disposal Systems, and Detention FacilitiesRajasekhar Sakhamurispecial
08/14/2023Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationPIROOZ SOLTANIZADEHspecial
08/14/2023Fire-Resistant Penetrations and JointsPIROOZ SOLTANIZADEHspecial
08/14/2023HVAC-R and service water heating system controlsPIROOZ SOLTANIZADEHenergy_progress
08/14/2023HVAC-R and service water heating equipmentPIROOZ SOLTANIZADEHenergy_progress
08/14/2023HVAC-R and service water piping design and insulationPIROOZ SOLTANIZADEHenergy_progress
08/03/2023Soil Percolation Test - Private On-Site Storm Water Drainage Disposal Systems, and Detention FacilitiesRajasekhar Sakhamurispecial
08/03/2023Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationPIROOZ SOLTANIZADEHspecial
08/03/2023Fire-Resistant Penetrations and JointsPIROOZ SOLTANIZADEHspecial
08/03/2023HVAC-R and service water piping design and insulationPIROOZ SOLTANIZADEHenergy_progress
08/03/2023HVAC-R and service water heating system controlsPIROOZ SOLTANIZADEHenergy_progress
08/03/2023HVAC-R and service water heating equipmentPIROOZ SOLTANIZADEHenergy_progress
06/22/2023Insulation placement and R valuesPIROOZ SOLTANIZADEHenergy_progress
06/22/2023Fenestration and door U-factor and product ratingsPIROOZ SOLTANIZADEHenergy_progress
06/22/2023Lowest Floor Elevation—progress
06/22/2023Concrete - Cast-In-PlacePIROOZ SOLTANIZADEHspecial
06/22/2023Excavations - Sheeting, Shoring, and BracingPIROOZ SOLTANIZADEHspecial
06/22/2023Fire-Resistant Penetrations and JointsPIROOZ SOLTANIZADEHspecial
06/22/2023Heating SystemsPIROOZ SOLTANIZADEHspecial
06/22/2023MasonryPIROOZ SOLTANIZADEHspecial
06/22/2023Mechanical SystemsPIROOZ SOLTANIZADEHspecial
06/22/2023Structural Stability – Alterations of existing buildingsPIROOZ SOLTANIZADEHspecial
06/22/2023Subgrade InspectionsPIROOZ SOLTANIZADEHspecial
06/22/2023Energy Code Compliance InspectionsPIROOZ SOLTANIZADEHprogress
06/22/2023FinalJAN PEREZprogress
Latest 25 of 94.
▾Documents — 76 on file (BIS + DOB NOW)
▸Plans & Drawings8
▸DOB NOWPlans/Sketch8
08/26/2026Q00529674-I1Request digital key ↗
08/26/2026Q00529674-P1Request digital key ↗
08/26/2026Q00529674-P6Request digital key ↗
Showing 3 of 8 on file for this type
▸Zoning, Tax Lot & Property Records5
▸DOB NOWZD1: DOB Zoning Diagram4
08/13/2026Q00529674-P2Open ↗
08/13/2026Q00529674-P1Open ↗
08/13/2026Q00529674-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026Q00529674-I1Open ↗
▸Seals & Professional Certifications38
▸DOB NOWProgress Inspector Seal & Signature17
08/30/2026Q00529674-P1Open ↗
08/30/2026Q00529674-P1Open ↗
08/30/2026Q00529674-P1Open ↗
Showing 3 of 17 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature13
08/30/2026Q00529674-P1Open ↗
08/30/2026Q00529674-P1Open ↗
08/30/2026Q00529674-P1Open ↗
Showing 3 of 13 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature8
08/26/2026Q00529674-P6Open ↗
08/26/2026Q00529674-I1Open ↗
08/26/2026Q00529674-P1Open ↗
Showing 3 of 8 on file for this type
▸Safety & Tenant Protection4
▸DOB NOWStreet Tree Checklist4
08/26/2026Q00529674-I1Open ↗
08/26/2026Q00529674-P1Open ↗
08/26/2026Q00529674-P6Open ↗
Showing 3 of 4 on file for this type
▸Environmental & Asbestos7
▸DOB NOWDEP ACP-5: Asbestos Assessment Report7
08/26/2026Q00529674-P1Open ↗
08/26/2026Q00529674-P6Open ↗
08/26/2026Q00529674-I1Open ↗
Showing 3 of 7 on file for this type
▸Energy Compliance2
▸DOB NOWEN2: As Built Energy Analysis.2
08/13/2026Q00541980-I1Open ↗
08/13/2026Q00529674-I1Open ↗
▸Other Documents12
▸DOB NOWPlot Diagram4
08/13/2026Q00529674-P6Open ↗
08/13/2026Q00529674-P2Open ↗
08/13/2026Q00529674-P1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone4
08/13/2026Q00529674-P2Open ↗
08/13/2026Q00529674-P6Open ↗
08/13/2026Q00529674-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWSite Survey: Initial2
08/13/2026Q00529674-I1Open ↗
08/13/2026Q00529674-P6Open ↗
▸DOB NOWFinal Survey1
08/13/2026Q00529674-I1Open ↗
▸DOB NOWAdjoining Owners Notification1
08/13/2026Q00529674-I1Open ↗