← Back
Two stories - detached, small or mid-size
245-20 148 ROAD
QUEENS · Rosedale · BIN 4289761
💬 Discuss this project
1965Year Built
2Stories
A1Building Class
R3-1Zoning
1,236 sfGross Floor Area
1Units
Two stories - detached, small or mid-size · 2,600 sf lot · 0.48 FAR built · Flood zone X500
Locations of Work
No floor-level scope or drawing coverage on file for this building.
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
03/04/2015$280K—— → —$227/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
PARKER AND WEST ENGINEERING, PLLC101/15/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
SUNRUN103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
SUNRUN INSTALLATION SVCGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
PARKER AND WEST ENGINEERI5272101/15/2025
Building Lifecycle
All (8)Filed (1)Permit Issued (1)Signed Off (1)Special Inspection (5)
03/13/2025
Signed off — Alteration
FILING HEREWITH TAX ABATEMENT APPLICATION FOR INSTALLATION OF ROOF MOUNTED SOLAR PANELS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
Q01161472-I1
01/27/2025
Permit issued — Solar
Q01161472-I1-SL
01/15/2025
Filed — Alteration
FILING HEREWITH TAX ABATEMENT APPLICATION FOR INSTALLATION OF ROOF MOUNTED SOLAR PANELS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
Q01161472-I1
12/31/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Walid Abdulla
12/31/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
Walid Abdulla
12/31/2024
Special inspection requirement — Energy Code Compliance Inspections
Walid Abdulla
12/31/2024
Special inspection requirement — Final
Walid Abdulla
12/31/2024
Special inspection requirement — Air barrier - visual inspection
Walid Abdulla
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSolarSigned-offSUNRUN INSTALLATION SVC01/27/2025
1 project · most recent 01/15/2025
FiledStatusContractorScope
01/15/2025CompleteSUNRUN SOLAR ELECTL CORP—
▾Special Inspection Requirements (DOB NOW) — 5
DateRequirementInspectorRole
12/31/2024Fire-Resistant Penetrations and JointsWalid Abdullaspecial
12/31/2024Structural Stability – Alterations of existing buildingsWalid Abdullaspecial
12/31/2024Energy Code Compliance InspectionsWalid Abdullaprogress
12/31/2024FinalWalid Abdullaprogress
12/31/2024Air barrier - visual inspectionWalid Abdullaenergy_progress
▾Documents — 9 on file (BIS + DOB NOW)
▸Plans & Drawings1
▸DOB NOWPlans/Sketch1
08/21/2026Q01161472-I1Request digital key ↗
▸Seals & Professional Certifications6
▸DOB NOWProgress Inspector Seal & Signature3
08/24/2026Q01161472-I1Open ↗
08/24/2026Q01161472-I1Open ↗
08/24/2026Q01161472-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature2
08/24/2026Q01161472-I1Open ↗
08/24/2026Q01161472-I1Open ↗
▸DOB NOWDPL-1: Design Professional Seal & Signature1
08/21/2026Q01161472-I1Open ↗
▸Environmental & Asbestos1
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/21/2026Q01161472-I1Open ↗
▸Approvals, Objections & Sign-offs1
▸DOB NOWUtility Company Final Acceptance Letter1
08/13/2026Q01161472-I1Open ↗