← Back
BuildNYC
One story retail building
245-24 HORACE HARDING EXPRESSWAY
QUEENS · BIN 4171723
💬 Discuss this project
1952Year Built
1Stories
K1Building Class
R3-2Zoning
22,156 sfGross Floor Area
10Units
11 Active Violations 9 unresolved · 2 paperwork only 30 likely answered ▸FDNY Report ↗
One story retail building · 74,303 sf lot · 0.3 FAR built · Flood zone X
Locations of Work
ArchitectureMechanicalPlumbingCivilGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
RoofInstall gas meters and piping for HVAC units on roof1 filing · 6 docs
Floor 1Pt Gym, Accuscript Pharmacy12p · 10 filings · 20 docs
CellarPt Gym5p · 5 filings · 20 docs
Site & exteriorSaf-t-swim2p · 4 filings · 20 docs
Filed — no permit issuedCanopy removal and exterior stucco finish38p · 4 filings · 13 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Littleneck Commons5010/04/2026
B.M.S. Realty Associates403/21/2026
Malachite Group303/21/2026
24 Hour Fitness203/21/2026
Clear Wireless103/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
JKM Architecture210/06/2026
Jung H. Choi, Architect310/01/2026
Bayside Associates302/27/2026
Bassiri111/27/2024
SU Architect812/09/2022
HC Engineering312/05/2022
Jeng Architect211/17/2021
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
HTX Building Consulting303/21/2026
SUN203/21/2026
JP Expedite603/21/2026
Ecdesign Studio203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Kale ConstructionGeneral Contractor303/21/2026
Signs CadSign hanger307/08/2026
Kle ConstructionGeneral Contractor303/21/2026
M3 Development GroupGeneral Contractor303/21/2026
Associated Electric Cont of NElectrical203/21/2026
StructurelineGeneral Contractor107/08/2026
S & L PlumbingPlumbing107/08/2026
Asko Electric Construction & MaintenanceElectrical103/22/2026
Village P & H NYPlumbing107/08/2026
Bemus Electrical ContractorsElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Jung H Choi Architect3020106/17/2026
Bassiri8394111/27/2024
SU Architect6857912/09/2022
Building Lifecycle
All (189)Filed (22)Permit Issued (9)Signed Off (5)Violation (60)Inspection (5)Objection (58)Special Inspection (30)
10/06/2026
Filed — Alteration
RENOVATION OF EXISTING STORE, INCLUDING REPLACEMENT OF CEILING TILE AND FLOOR FINISH; INSTALLATION OF COOKING EQUIPMENTS. EXISTING S/S KITCHEN HOOD WITH EXHAUST SYSTEM TO REMAIN.
Q01470072-S1
10/06/2026
Filed — Alteration
RENOVATION OF EXISTING STORE, INCLUDING REPLACEMENT OF CEILING TILE AND FLOOR FINISH; INSTALLATION OF COOKING EQUIPMENTS. EXISTING S/S KITCHEN HOOD WITH EXHAUST SYSTEM TO REMAIN.
Q01470072-I1
10/01/2026
Filed — Alteration
REMOVAL OF EXISTING CANOPY STRUCTURE AND INSTALL OF NEW STUCCO FINISH AT EXTERIOR. WORK IS LIMITED TO 1ST FLOOR NORTH FACADE ONLY. THERE ARE NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
Q01461398-I1
09/22/2026
Signed off — Alteration
TO PROPOSE PLUMBING WORK FOR EX. STORE IN CONJUNCTION WITH Q00536734,AS PER PLAN FILED HEREWITH. NO CHANGE OF USE, EGRESS OR CERTIFICATE OFOCCUPANCY.
Q00558012-I1
09/20/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
09/16/2026
Special inspection requirement — Fire-Resistance Rated Construction
08/07/2026
Objection raised — Other
08/07/2026
Objection raised — Scope
08/07/2026
Objection raised — Other
08/07/2026
Objection raised — Other
07/02/2026
Objection resolved — Addressed
06/17/2026
Filed — Alteration
RECTIFY ECB VIOLATION #39178111Y BY LEGALIZING DRIVE THRU WINDOW & AWNING ON THE WEST SIDE OF BUILDING AND INSTALL SECOND DRIVE THRU WINDOW. THERE ARE NO CHNAGE IN USE, MEANS OF EGRESS, OR OCCUPANCY UNDER THIS APPLICATION.
Q01412441-I1
06/04/2026
Special inspection requirement — Post-installed Anchors
Jung Choi
03/01/2026
Objection resolved — Addressed
02/27/2026
Filed — Alteration
Q01365061-I1
02/24/2026
Violation issued (ECB, open)
Construction
02/06/2026
Violation issued (FDNY_NOV, closed)
02/06/2026
Violation issued (FDNY_NOV, closed)
11/25/2025
Violation issued (FDNY_NOV, closed)
11/25/2025
Violation issued (FDNY_NOV, closed)
11/14/2025
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
11/14/2025
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
11/14/2025
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
11/14/2025
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
11/14/2025
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
11/14/2025
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
09/22/2025
Signed off — Alteration
Q01147574-I1
08/22/2025
Permit issued — Mechanical Systems
Q01147574-I1-MS
08/07/2025
Violation issued (ECB, open)
Boilers
08/07/2025
Violation issued (ECB, open)
Boilers
08/07/2025
Violation issued (ECB, open)
Construction
07/01/2025
Violation issued (ECB, open)
Boilers
07/01/2025
Violation issued (ECB, open)
Boilers
07/01/2025
Violation issued (ECB, open)
Boilers
05/12/2025
Violation issued (FDNY_ORDER, closed)
02/27/2025
Violation issued (FDNY_NOV, closed)
01/12/2025
Special inspection requirement — Exterior lighting power
11/27/2024
Filed — Alteration
Q01147574-I1
11/25/2024
Special inspection requirement — Final
FARHAD BASSIRI-TEHRANI
11/25/2024
Special inspection requirement — Mechanical Systems
FARHAD BASSIRI-TEHRANI
11/12/2024
Violation issued (FDNY_NOV, closed)
09/23/2024
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
09/23/2024
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
09/23/2024
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
09/23/2024
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
09/23/2024
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
09/23/2024
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
08/11/2024
Objection resolved — Addressed
08/11/2024
Objection resolved — Addressed
08/11/2024
Objection resolved — Addressed
08/11/2024
Objection resolved — Resolved
08/10/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
08/08/2024
Objection resolved — Addressed
08/03/2024
Objection resolved — Addressed
08/03/2024
Special inspection requirement — Fenestration and door U-factor and product ratings
08/03/2024
Special inspection requirement — Interior lighting power
08/03/2024
Special inspection requirement — Lighting controls
08/03/2024
Special inspection requirement — Metering
08/03/2024
Special inspection requirement — Fenestration air leakage
08/03/2024
Special inspection requirement — Fenestration areas
Latest 60 of 189 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsSigned-offKale Construction08/22/2025
DOB NOWGeneral ConstructionPermit IssuedKle Construction02/27/2023
DOB NOWSignSigned-offSigns Cad12/06/2022
DOB NOWSignSigned-offSigns Cad11/21/2022
DOB NOWSignSigned-offSigns Cad11/21/2022
DOB NOWPlumbingSigned-offS & L Plumbing05/03/2022
DOB NOWGeneral ConstructionPermit IssuedStructureline02/02/2022
DOB NOWPlumbingSigned-offVillage P & H NY11/10/2021
DOB NOWGeneral ConstructionPermit IssuedM3 Development Group09/27/2021
BISOTISSUEDTrinity Technologies06/06/2017
BISPLISSUEDInfiniti Esc Plumbing02/21/2017
BISMHISSUEDArp Home Improvement01/20/2017
BISOTISSUEDArp Home Improvement01/17/2017
BISEQISSUEDArp Home Improvement01/12/2017
BIS—ISSUEDBally Total Fitness11/17/2016
BIS—ISSUEDBally Total Fitness11/16/2015
BISOTISSUEDDGC Capital Contracting05/13/2015
BISPLISSUED5Cale Plumbing12/28/2012
BISPLISSUEDScale Plumbing09/01/2011
BISBLISSUEDScale Plumbing09/01/2011
BISOTISSUEDFast Track Electric03/18/2010
BISOTISSUEDSin Kai Enterprises03/10/2009
BISOTISSUEDBTW Pro11/25/2008
BISPLISSUEDDyckman Plumbing and Heating08/02/2007
BISOTISSUEDGold Stone Development08/02/2007
BIS—ISSUEDNational Maintenance10/05/2006
BISEQISSUEDEpsj Contractor10/02/2006
BISOTISSUEDEpsj Contractor10/02/2006
BISOTISSUEDCronus Mechanical11/07/2005
BISPLISSUEDMonarch Mechanical05/04/2005
BIS—ISSUEDNew York Sign City04/18/2005
BISOTISSUEDMichelle Kuo03/18/2005
BISPLISSUEDThe Plumbing Company03/04/2005
BISFPISSUEDMaster Fire Systems02/25/2005
BISCCISSUEDMichelle Kuo01/24/2005
BISMHISSUEDG. Perotto Associates01/14/2004
BISOTISSUEDInsite Communication Group12/09/2003
BISOTISSUEDKorman Design & Build07/30/2002
BISEQISSUEDKorman Design & Build07/30/2002
BISOTISSUEDGino Cinelli08/26/1999
+ 9 more permits on file
2 projects · most recent 11/21/2021
FiledStatusContractorScope
11/21/2021———
11/21/2021——1 heads
2 projects · most recent 11/09/2022
Gas Water/Sanitary
FiledStatusContractorScope
11/09/2022——Gas
08/17/2021Signed-offVillage P & H NYWater/Sanitary
7 projects · most recent 11/22/2024
General Wiring
FiledStatusContractorScope
11/22/2024Permit IssuedAsko Electric Construction & Maintenance15 meters, 1 new_meters
02/09/2023CompleteSigns Cad—
02/09/2023CompleteSigns Cad—
10/25/2022CompleteBerardi Electrical ContractingGeneral Wiring
05/24/2022Permit IssuedUnited Electrical Cont'g—
02/08/2022CompleteIntelogic ElectricGeneral Wiring
11/10/2021Permit IssuedY.S. Electric1 meters, 1 new_meters
▾Field Inspections (DOB CAP) — 5
DateTypeResultReport
05/26/2022Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
05/13/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
05/13/2022Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
01/13/2022Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
12/03/2021Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 49
DateRequirementInspectorRole
09/20/2026Structural Stability – Alterations of existing buildings—special
09/16/2026Fire-Resistance Rated Construction—progress
06/04/2026Post-installed AnchorsJung Choispecial
01/12/2025Exterior lighting power—energy_progress
11/25/2024FinalFARHAD BASSIRI-TEHRANIprogress
11/25/2024Mechanical SystemsFARHAD BASSIRI-TEHRANIspecial
08/10/2024Fire-Resistant Penetrations and Joints—special
08/03/2024Fenestration and door U-factor and product ratings—energy_progress
08/03/2024Interior lighting power—energy_progress
08/03/2024Lighting controls—energy_progress
08/03/2024Metering—energy_progress
08/03/2024Fenestration air leakage—energy_progress
08/03/2024Fenestration areas—energy_progress
02/06/2024Energy Code Compliance Inspections—progress
10/21/2023Structural Stability – Alterations of existing buildings—special
12/04/2022Fire-Resistance Rated ConstructionQIANG SUprogress
12/03/2022Fenestration air leakageQIANG SUenergy_progress
12/03/2022Lighting controlsQIANG SUenergy_progress
12/03/2022Fenestration areasQIANG SUenergy_progress
12/03/2022Air barrier - visual inspectionQIANG SUenergy_progress
12/03/2022Fenestration and door U-factor and product ratingsQIANG SUenergy_progress
12/03/2022Air barrier — testing QIANG SUenergy_progress
12/03/2022Energy Code Compliance InspectionsQIANG SUprogress
12/03/2022Fire-Resistant Penetrations and JointsQIANG SUspecial
12/03/2022Interior lighting powerQIANG SUenergy_progress
Latest 25 of 49.
▾Tenants in the building
TenantSpaceFloorsRenovation projects
Saf-t-swimFitness / Recreation—
Project Q07998923 Alteration · LOC Issued · 11/21/2022
Pt GymFitness / RecreationCellar, Floor 1
Project Q00589050 Alteration · Approved · 11/21/2021
Project Q00589052 Alteration · Approved · 11/21/2021
Accuscript PharmacyMedical / HealthcareFloor 1
Project Q00631515 Alteration · Approved · 11/17/2021
Names are taken automatically from the text of each project’s filed documents (title blocks and cover sheets) and screened to exclude owners, landlords and designers. They may be incomplete or wrong; check the filing.
▾Documents — 273 on file (BIS + DOB NOW)
▸Plans & Drawings21
▸DOB NOWPlans/Sketch21
10/07/2026Q01470072-S1Request digital key ↗
10/07/2026Q01470072-I1Request digital key ↗
10/04/2026Q01461398-I1Request digital key ↗
Showing 3 of 21 on file for this type
▸Applications & Permits52
▸BISPLAN / WORK APPROVAL APPLICATION22
04/22/2022420869000Open ↗
05/13/2021420869000Open ↗
11/14/2018420869000Open ↗
Showing 3 of 22 on file for this type
▸BISWORK PERMIT APPLICATION18
06/13/2017421466915Open ↗
02/25/2017440367648Open ↗
12/02/2016440367648Open ↗
Showing 3 of 18 on file for this type
▸BISPLACE OF ASSEMBLY10
07/24/2018420869206Open ↗
11/28/2016420880470Open ↗
11/28/2016420868993Open ↗
Showing 3 of 10 on file for this type
▸BISNon-Directive 14 Construction Sign Off Including Sign Applications1
02/19/2016421163065Open ↗
▸BISCERTIFICATE OF OCCUPANCY: APPLICATION1
12/04/2017420869000Open ↗
▸Zoning, Tax Lot & Property Records1
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026Q00951503-I1Open ↗
▸Seals & Professional Certifications88
▸DOB NOWProgress Inspector Seal & Signature24
09/23/2026Q01147574-I1Open ↗
09/02/2026Q08032292-I1Open ↗
09/02/2026Q08032292-I1Open ↗
Showing 3 of 24 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature22
10/07/2026Q01470072-S1Open ↗
10/07/2026Q01470072-I1Open ↗
10/04/2026Q01461398-I1Open ↗
Showing 3 of 22 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION20
11/03/2018421466915Open ↗
08/23/2017420868993Open ↗
08/23/2017420880470Open ↗
Showing 3 of 20 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature9
09/23/2026Q01147574-I1Open ↗
09/02/2026Q08032292-I1Open ↗
08/29/2026Q00483879-P1Open ↗
Showing 3 of 9 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST4
05/26/2015421163065Open ↗
11/19/2013420869000Open ↗
01/08/2009410191466Open ↗
Showing 3 of 4 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT3
12/02/2016440367648Open ↗
11/23/2016440365524Open ↗
05/26/2015421163065Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY2
12/02/2016440367648Open ↗
11/23/2016440365524Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM2
11/19/2013420869000Open ↗
11/12/2008410191466Open ↗
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION2
12/02/2016440367648Open ↗
11/23/2016440365524Open ↗
▸Trade Schedules & Equipment6
▸BISSCHEDULE B - PLUMBING3
12/02/2016440367648Open ↗
11/23/2016440365524Open ↗
06/03/2011420363760Open ↗
▸BISEQUIPMENT USE PERMITS1
06/30/2014410191466Open ↗
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT1
06/03/2011420363760Open ↗
▸BISEQUIPMENT USE APPLICATION/PERMIT1
02/22/2008410069018Open ↗
▸Safety & Tenant Protection3
▸BISSTREET TREE CHECKLIST3
04/28/2015420869000Open ↗
11/19/2013420869000Open ↗
11/12/2008410191466Open ↗
▸Environmental & Asbestos28
▸DOB NOWDEP ACP-5: Asbestos Assessment Report20
10/07/2026Q01470072-S1Open ↗
10/07/2026Q01470072-I1Open ↗
10/04/2026Q01461398-I1Open ↗
Showing 3 of 20 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)4
04/11/2017421466915Open ↗
12/02/2016440367648Open ↗
11/23/2016440365524Open ↗
Showing 3 of 4 on file for this type
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER2
11/19/2013420869000Open ↗
02/21/2008410069018Open ↗
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'2
06/03/2011420363760Open ↗
02/19/2010420141938Open ↗
▸Energy Compliance13
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS4
11/03/2018421466915Open ↗
04/11/2017421466915Open ↗
05/26/2015421163065Open ↗
Showing 3 of 4 on file for this type
▸BISTECHNICAL REPORT: ENERGY2
06/03/2011420363760Open ↗
06/03/2011420363760Open ↗
▸BISAS-BUILT ENERGY ANALYSIS2
11/03/2018421466915Open ↗
02/12/2016421163065Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS2
12/02/2016440367648Open ↗
11/23/2016440365524Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY2
12/02/2016440367648Open ↗
11/23/2016440365524Open ↗
▸DOB NOWEN2: As Built Energy Analysis.1
08/26/2026Q00483879-I1Open ↗
▸Inspections & Test Reports2
▸BISTECHNICAL REPORT: RESPONSIBILITY2
12/02/2016440367648Open ↗
11/23/2016440365524Open ↗
▸Approvals, Objections & Sign-offs20
▸BISADMINISTRATIVE OBJECTIONS9
08/04/2015421188075Open ↗
11/19/2013420869000Open ↗
11/08/2013420880470Open ↗
Showing 3 of 9 on file for this type
▸BISSCHEDULE A - OCCUPANCY / USE5
04/22/2022420869000Open ↗
09/19/2016420869000Open ↗
06/12/2015420869000Open ↗
Showing 3 of 5 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST4
11/03/2018421466915Open ↗
02/19/2016421163065Open ↗
10/28/2010420141938Open ↗
Showing 3 of 4 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION2
12/12/2018421466915Open ↗
10/28/2010420141938Open ↗
▸Cost, Insurance & Ownership17
▸BISCOST AFFIDAVIT13
11/03/2018421466915Open ↗
04/11/2017421466915Open ↗
12/02/2016440367648Open ↗
Showing 3 of 13 on file for this type
▸BISCIVIL PENALTY AFFADAVIT/REQUEST3
12/29/2016440367648Open ↗
12/29/2016440367648Open ↗
12/14/2016440367648Open ↗
▸BISLL58/88-CIVIL PENALTY AFFIDAVIT1
11/25/2008410191466Open ↗
▸Filing & Intake Forms20
▸BISEFILING COVER SHEET7
04/11/2017421466915Open ↗
08/04/2015421188075Open ↗
05/26/2015421163065Open ↗
Showing 3 of 7 on file for this type
▸BISADDITIONAL INFORMATION7
11/19/2018420869000Open ↗
07/24/2018420869206Open ↗
06/04/2018420869000Open ↗
Showing 3 of 7 on file for this type
▸BISBOROUGH INTAKE FORM4
11/14/2018420869000Open ↗
07/24/2018420869206Open ↗
05/30/2018420869000Open ↗
Showing 3 of 4 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET2
12/02/2016440367648Open ↗
11/23/2016440365524Open ↗
▸Other Documents2
▸BISPLOT DIAGRAM1
11/19/2013420869000Open ↗
▸DOB NOWProperty Ownership Certification1
08/22/2026Q00951503-I1Open ↗