← Back
Two stories - detached, small or mid-size
245-27 133 DRIVE
QUEENS · Rosedale · BIN 4284069
💬 Discuss this project
1965Year Built
2Stories
A1Building Class
R2Zoning
2,160 sfGross Floor Area
1Units
Two stories - detached, small or mid-size · 4,240 sf lot · 0.51 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
PARKER AND WEST ENGINEERING, PLLC103/18/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
SUNRUN103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
SUNRUN INSTALLATION SVCGeneral Contractor203/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
PARKER AND WEST ENGINEERI5272103/18/2024
Building Lifecycle
All (8)Filed (1)Permit Issued (1)Signed Off (1)Special Inspection (5)
07/11/2024
Signed off — Alteration
Q01018942-I1
03/22/2024
Permit issued — Solar
Q01018942-I1-SL
03/18/2024
Filed — Alteration
Q01018942-I1
03/12/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Walid Abdulla
03/12/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
Walid Abdulla
03/12/2024
Special inspection requirement — Energy Code Compliance Inspections
Walid Abdulla
03/12/2024
Special inspection requirement — Final
Walid Abdulla
03/12/2024
Special inspection requirement — Air barrier - visual inspection
Walid Abdulla
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSolarSigned-offSUNRUN INSTALLATION SVC03/22/2024
1 project · most recent 03/18/2024
FiledStatusContractorScope
03/18/2024CompleteSUNRUN SOLAR ELECTL CORP—
▾Special Inspection Requirements (DOB NOW) — 5
DateRequirementInspectorRole
03/12/2024Fire-Resistant Penetrations and JointsWalid Abdullaspecial
03/12/2024Structural Stability – Alterations of existing buildingsWalid Abdullaspecial
03/12/2024Energy Code Compliance InspectionsWalid Abdullaprogress
03/12/2024FinalWalid Abdullaprogress
03/12/2024Air barrier - visual inspectionWalid Abdullaenergy_progress
▾Documents — 6 on file (BIS + DOB NOW)
▸Seals & Professional Certifications5
▸DOB NOWProgress Inspector Seal & Signature3
08/27/2026Q01018942-I1Open ↗
08/27/2026Q01018942-I1Open ↗
08/27/2026Q01018942-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature2
08/27/2026Q01018942-I1Open ↗
08/27/2026Q01018942-I1Open ↗
▸Approvals, Objections & Sign-offs1
▸DOB NOWUtility Company Final Acceptance Letter1
08/13/2026Q01018942-I1Open ↗