← Back
One story - permanent living quarter
245-33 147 ROAD
QUEENS · BIN 4289623
💬 Discuss this project
1955Year Built
2Stories
A2Building Class
R3XZoning
2,642 sfGross Floor Area
1Units
One story - permanent living quarter · Owner of record: BABAKAMA 119 LLC · 3,800 sf lot · 0.7 FAR built · Flood zone X500
Locations of Work
ArchitectureStructural
Floor 21 filing · 20 docs
Floor 11 filing · 20 docs
Cellar1p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
ZMIROT1307/08/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
02/04/2026$1.4M—BABAKAMA 119 LLC → Private party$530/sf building
01/31/2025$630K—— → —$238/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
J.K.DESIGN406/24/2025
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
26 BONIM LLCGeneral Contractor307/08/2026
PLBG P & H INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
AA BUILDING & INSPECTION1519306/24/2025
Building Lifecycle
All (53)Filed (4)Permit Issued (4)Signed Off (2)Inspection (9)Objection (4)Special Inspection (30)
12/30/2025
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
10/27/2025
Signed off — Alteration
installation of new gas fired equipment and plumbing fixtures for the renovation and conversion of the existing one family dwelling to be converted into a two family dwelling. Filed in conjunction with ALT I app #Q01192119-I1
Q01226401-I1
08/01/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
07/29/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Younes Abouyaala
07/29/2025
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
BRIAN FLYNN
07/29/2025
Special inspection requirement — Concrete - Cast-In-Place
Younes Abouyaala
07/29/2025
Special inspection requirement — Chimneys and vents
Younes Abouyaala
07/29/2025
Special inspection requirement — Subgrade Inspections
Younes Abouyaala
07/29/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
Younes Abouyaala
07/29/2025
Special inspection requirement — Footing and Foundation
Younes Abouyaala
07/29/2025
Special inspection requirement — Fire-Resistance Rated Construction
Younes Abouyaala
07/29/2025
Special inspection requirement — Energy Code Compliance Inspections
Younes Abouyaala
07/29/2025
Special inspection requirement — Structural Wood Frame
Younes Abouyaala
07/29/2025
Special inspection requirement — Final
NAVEEN KUMAR
07/29/2025
Special inspection requirement — Permanent certificate
Younes Abouyaala
07/29/2025
Special inspection requirement — Interior lighting power
Younes Abouyaala
07/29/2025
Special inspection requirement — Fenestration and door U-factor and product ratings
Younes Abouyaala
07/29/2025
Special inspection requirement — Maintenance information
Younes Abouyaala
07/29/2025
Special inspection requirement — Insulation placement and R values
Younes Abouyaala
07/29/2025
Special inspection requirement — Air barrier - visual inspection
Younes Abouyaala
07/29/2025
Special inspection requirement — Metering
Younes Abouyaala
07/29/2025
Special inspection requirement — Fenestration air leakage
Younes Abouyaala
07/29/2025
Special inspection requirement — Protection of exposed foundation insulation
Younes Abouyaala
07/29/2025
Special inspection requirement — Fenestration areas
Younes Abouyaala
07/29/2025
Special inspection requirement — Electric vehicle service equipment requirements
Younes Abouyaala
07/20/2025
Signed off — Alteration
Q01221857-I1
07/16/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
06/24/2025
Filed — Alteration CO
EXIST 1.5 STORIES (1) ONE FAMILY DWELLING UNIT TO BE HORIZONTALLY AND VERTICALLY ENLARGE, FULLY RENOVATED AND CONVERTED INTO A (2) TWO FAMILY DWELLING UNITS.
Q01192119-P1
06/21/2025
Special inspection requirement — Chimneys and vents
Younes Abouyaala
06/21/2025
Special inspection requirement — Concrete - Cast-In-Place
Younes Abouyaala
06/21/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Younes Abouyaala
06/21/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
Younes Abouyaala
06/21/2025
Special inspection requirement — Subgrade Inspections
Younes Abouyaala
06/21/2025
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
BRIAN FLYNN
06/21/2025
Special inspection requirement — Energy Code Compliance Inspections
Younes Abouyaala
06/21/2025
Special inspection requirement — Final
NAVEEN KUMAR
06/03/2025
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
06/03/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
05/28/2025
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
05/23/2025
Permit issued — Foundation
Q01192119-I1-GC-CX
05/20/2025
Permit issued — Plumbing
Q01226401-I1-PL
05/15/2025
Filed — Alteration
installation of new gas fired equipment and plumbing fixtures for the renovation and conversion of the existing one family dwelling to be converted into a two family dwelling. Filed in conjunction with ALT I app #Q01192119-I1
Q01226401-I1
05/07/2025
Filed — Alteration
Q01221857-I1
05/07/2025
Permit issued — Construction Fence
Q01221857-I1-FN
05/06/2025
Permit issued — Structural
Q01192119-I1-GC-CX
05/05/2025
Objection resolved — Addressed
05/02/2025
Objection raised — Cost
04/18/2025
Objection resolved — Addressed
04/15/2025
Objection raised — Scope
04/02/2025
Filed — Alteration CO
EXIST 1.5 STORIES (1) ONE FAMILY DWELLING UNIT TO BE HORIZONTALLY AND VERTICALLY ENLARGE, FULLY RENOVATED AND CONVERTED INTO A (2) TWO FAMILY DWELLING UNITS.
Q01192119-I1
08/20/2024
Inspection — Certified StandPipe - SD - Hydrostatic 63/09 Test (100 Foot Increments)
Certified
View inspection ↗
07/05/2024
Inspection — Certified StandPipe - SD - Hydrostatic 63/09 Test (Initial 75 Feet)
Certified
View inspection ↗
07/03/2024
Inspection — Certified StandPipe-SD-Fixtures-Finish-SD
Certified
View inspection ↗
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWFoundationPermit Issued26 BONIM05/23/2025
DOB NOWPlumbingSigned-offPLBG P & H INC05/20/2025
DOB NOWConstruction FenceSigned-off26 BONIM05/07/2025
DOB NOWStructuralPermit Issued26 BONIM05/06/2025
1 project · most recent 08/20/2025
General Wiring
FiledStatusContractorScope
08/20/2025CompletePOWER SURGE ELECTRIC, INCGeneral Wiring
1 project · most recent 06/24/2025
Concrete Wood
FiledStatusContractorScope
06/24/2025Permit Issued26 BONIM LLCConcrete, Wood
▾Field Inspections (DOB CAP) — 9
DateTypeResultReport
12/30/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
08/01/2025Pass-Final CND-Occupancy InspectionPassView ↗
07/16/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
06/03/2025Certified Gas-Gas-Piping-RoughingCertifiedView ↗
06/03/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
05/28/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
08/20/2024Certified StandPipe - SD - Hydrostatic 63/09 Test (100 Foot Increments)CertifiedView ↗
07/05/2024Certified StandPipe - SD - Hydrostatic 63/09 Test (Initial 75 Feet)CertifiedView ↗
07/03/2024Certified StandPipe-SD-Fixtures-Finish-SDCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 50
DateRequirementInspectorRole
07/29/2025Fire-Resistant Penetrations and JointsYounes Abouyaalaspecial
07/29/2025Subsurface Investigations (Borings/Test Pits)BRIAN FLYNNspecial
07/29/2025Concrete - Cast-In-PlaceYounes Abouyaalaspecial
07/29/2025Chimneys and ventsYounes Abouyaalaspecial
07/29/2025Subgrade InspectionsYounes Abouyaalaspecial
07/29/2025Structural Stability – Alterations of existing buildingsYounes Abouyaalaspecial
07/29/2025Footing and FoundationYounes Abouyaalaprogress
07/29/2025Fire-Resistance Rated ConstructionYounes Abouyaalaprogress
07/29/2025Energy Code Compliance InspectionsYounes Abouyaalaprogress
07/29/2025Structural Wood FrameYounes Abouyaalaprogress
07/29/2025FinalNAVEEN KUMARprogress
07/29/2025Permanent certificateYounes Abouyaalaenergy_progress
07/29/2025Interior lighting powerYounes Abouyaalaenergy_progress
07/29/2025Fenestration and door U-factor and product ratingsYounes Abouyaalaenergy_progress
07/29/2025Maintenance informationYounes Abouyaalaenergy_progress
07/29/2025Insulation placement and R valuesYounes Abouyaalaenergy_progress
07/29/2025Air barrier - visual inspectionYounes Abouyaalaenergy_progress
07/29/2025MeteringYounes Abouyaalaenergy_progress
07/29/2025Fenestration air leakageYounes Abouyaalaenergy_progress
07/29/2025Protection of exposed foundation insulationYounes Abouyaalaenergy_progress
07/29/2025Fenestration areasYounes Abouyaalaenergy_progress
07/29/2025Electric vehicle service equipment requirementsYounes Abouyaalaenergy_progress
06/21/2025Chimneys and ventsYounes Abouyaalaspecial
06/21/2025Concrete - Cast-In-PlaceYounes Abouyaalaspecial
06/21/2025Fire-Resistant Penetrations and JointsYounes Abouyaalaspecial
Latest 25 of 50.
▾Documents — 42 on file (BIS + DOB NOW)
▸Plans & Drawings4
▸DOB NOWPlans/Sketch4
08/20/2026Q01221857-I1Request digital key ↗
08/20/2026Q01226401-I1Request digital key ↗
08/19/2026Q01192119-I1Request digital key ↗
Showing 3 of 4 on file for this type
▸Zoning, Tax Lot & Property Records4
▸DOB NOWHouse Number Verification: TOPO Stamp2
08/13/2026Q01192119-P1Open ↗
08/13/2026Q01192119-I1Open ↗
▸DOB NOWZD1: DOB Zoning Diagram2
08/13/2026Q01192119-P1Open ↗
08/13/2026Q01192119-I1Open ↗
▸Seals & Professional Certifications17
▸DOB NOWProgress Inspector Seal & Signature8
08/31/2026Q01192119-P1Open ↗
08/31/2026Q01192119-P1Open ↗
08/31/2026Q01192119-P1Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature5
08/31/2026Q01192119-P1Open ↗
08/31/2026Q01192119-P1Open ↗
08/27/2026Q01192119-I1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature4
08/20/2026Q01221857-I1Open ↗
08/20/2026Q01226401-I1Open ↗
08/19/2026Q01192119-P1Open ↗
Showing 3 of 4 on file for this type
▸Safety & Tenant Protection2
▸DOB NOWStreet Tree Checklist2
08/13/2026Q01192119-P1Open ↗
08/13/2026Q01192119-I1Open ↗
▸Environmental & Asbestos3
▸DOB NOWDEP ACP-5: Asbestos Assessment Report3
08/20/2026Q01226401-I1Open ↗
08/19/2026Q01192119-P1Open ↗
08/19/2026Q01192119-I1Open ↗
▸Inspections & Test Reports3
▸DOB NOWSOIL REPORT2
08/13/2026Q01192119-I1Open ↗
08/13/2026Q01192119-P1Open ↗
▸DOB NOWTR4 Test Report and Plot Diagram1
08/13/2026Q01192119-I1Open ↗
▸Other Documents9
▸DOB NOWSite Survey: Initial2
08/13/2026Q01192119-I1Open ↗
08/13/2026Q01192119-P1Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone2
08/13/2026Q01192119-I1Open ↗
08/13/2026Q01192119-P1Open ↗
▸DOB NOWPlot Diagram2
08/13/2026Q01192119-P1Open ↗
08/13/2026Q01192119-I1Open ↗
▸DOB NOWProperty Ownership Certification2
08/19/2026Q01192119-P1Open ↗
08/19/2026Q01192119-I1Open ↗
▸DOB NOWFinal Survey1
08/13/2026Q01192119-I1Open ↗