← Back
Two family converted from one family
245-36 147 AVENUE
QUEENS · BIN 4289616
💬 Discuss this project
1955Year Built
2Stories
B3Building Class
R3XZoning
1,999 sfGross Floor Area
2Units
0 Open ViolationsFDNY Report ↗
Two family converted from one family · 4,000 sf lot · 0.5 FAR built · Flood zone X500
Locations of Work
Architecture
Floor 25p · 2 filings · 20 docs
Floor 14p · 1 filing · 20 docs
Cellar3p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
BROWN CONS CORP HAYDEN103/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
A&A CONSULTING ENGINEERS PC602/16/2024
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
HAYDEN BROWN CONS CORPGeneral Contractor307/08/2026
ALL PRO PLBG & HTG INCPlumbing107/08/2026
BT'S PLUMBING AND HEATINGPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
A&A CONSULTING ENG. PC3252502/16/2024
Building Lifecycle
All (52)Filed (6)Permit Issued (4)Signed Off (2)Violation (1)Inspection (7)Objection (2)Special Inspection (30)
06/04/2024
Signed off — Alteration
FILLING FOR A TEMPORARY CONSTRUCTION FENCE.
Q00689796-I1
02/23/2024
Special inspection requirement — Underpinning
SAEED AINECHI
02/23/2024
Special inspection requirement — Fenestration areas
SAEED AINECHI
02/23/2024
Special inspection requirement — Lighting in dwelling units
SAEED AINECHI
02/23/2024
Special inspection requirement — Fenestration air leakage
SAEED AINECHI
02/23/2024
Special inspection requirement — Fenestration and door U-factor and product ratings
SAEED AINECHI
02/23/2024
Special inspection requirement — Air barrier - visual inspection
SAEED AINECHI
02/23/2024
Special inspection requirement — Fire-Resistance Rated Construction
SAEED AINECHI
02/23/2024
Special inspection requirement — Energy Code Compliance Inspections
SAEED AINECHI
02/23/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
SAEED AINECHI
02/23/2024
Special inspection requirement — Concrete - Cast-In-Place
SAEED AINECHI
02/23/2024
Special inspection requirement — Excavations - Sheeting, Shoring, and Bracing
SAEED AINECHI
02/23/2024
Special inspection requirement — Subgrade Inspections
SAEED AINECHI
02/16/2024
Filed — Alteration CO
PROPOSED HORIZONTAL & VERTICAL EXTENSION, WITH CONVERSION FROM EXISTING 1-FAMILY TO 2-FAMILY DWELLING UNITS. PLUMBING WORK TO BE FILLED UNDER SEPARATE APPLICATION.
Q00524837-P2
02/08/2024
Special inspection requirement — Air barrier - visual inspection
SAEED AINECHI
02/08/2024
Special inspection requirement — Concrete - Cast-In-Place
SAEED AINECHI
02/08/2024
Special inspection requirement — Excavations - Sheeting, Shoring, and Bracing
SAEED AINECHI
02/08/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
SAEED AINECHI
02/08/2024
Special inspection requirement — Subgrade Inspections
SAEED AINECHI
02/08/2024
Special inspection requirement — Underpinning
SAEED AINECHI
02/08/2024
Special inspection requirement — Energy Code Compliance Inspections
SAEED AINECHI
02/08/2024
Special inspection requirement — Fire-Resistance Rated Construction
SAEED AINECHI
02/08/2024
Special inspection requirement — Lighting in dwelling units
SAEED AINECHI
02/08/2024
Special inspection requirement — Fenestration air leakage
SAEED AINECHI
02/08/2024
Special inspection requirement — Fenestration areas
SAEED AINECHI
02/08/2024
Special inspection requirement — Fenestration and door U-factor and product ratings
SAEED AINECHI
05/03/2023
Inspection — Pass-Final Fence Non-Directive 14
Pass
View inspection ↗
05/01/2023
Signed off — Alteration
PROPOSED PLUMBING FIXTURES AS NOTED ON PLANS. ALL GENERAL CONSTRUCTION WORK FILLED UNDER SEPERATE APPLICATION.
Q00560024-I1
03/02/2023
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
02/27/2023
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
02/27/2023
Inspection — Certified Storm Drainage-ST-Fixtures-Finish
Certified
View inspection ↗
02/27/2023
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
01/27/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
12/29/2022
Permit issued — Plumbing
Q00560024-I1-PL
10/27/2022
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
10/12/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
SAEED AINECHI
10/12/2022
Special inspection requirement — Permanent certificate
SAEED AINECHI
10/12/2022
Special inspection requirement — Energy Code Compliance Inspections
SAEED AINECHI
10/12/2022
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
SAEED AINECHI
10/12/2022
Special inspection requirement — Maintenance information
SAEED AINECHI
10/06/2022
Filed — Alteration CO
PROPOSED HORIZONTAL & VERTICAL EXTENSION, WITH CONVERSION FROM EXISTING 1-FAMILY TO 2-FAMILY DWELLING UNITS. PLUMBING WORK TO BE FILLED UNDER SEPARATE APPLICATION.
Q00524837-P1
10/06/2022
Filed — Alteration
PROPOSED PLUMBING FIXTURES AS NOTED ON PLANS. ALL GENERAL CONSTRUCTION WORK FILLED UNDER SEPERATE APPLICATION.
Q00560024-P1
10/03/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
SAEED AINECHI
07/13/2022
Violation issued (ECB, closed)
Construction
07/03/2022
Permit issued — Plumbing
Q00560024-I1-PL
05/25/2022
Filed — Alteration
PROPOSED PLUMBING FIXTURES AS NOTED ON PLANS. ALL GENERAL CONSTRUCTION WORK FILLED UNDER SEPERATE APPLICATION.
Q00560024-I1
04/21/2022
Permit issued — Construction Fence
Q00689796-I1-FN
04/21/2022
Permit issued — General Construction
Q00524837-I1-GC
03/22/2022
Objection raised — Structural
03/22/2022
Objection resolved — Addressed
03/21/2022
Filed — Alteration
FILLING FOR A TEMPORARY CONSTRUCTION FENCE.
Q00689796-I1
05/20/2021
Filed — Alteration CO
PROPOSED HORIZONTAL & VERTICAL EXTENSION, WITH CONVERSION FROM EXISTING 1-FAMILY TO 2-FAMILY DWELLING UNITS. PLUMBING WORK TO BE FILLED UNDER SEPARATE APPLICATION.
Q00524837-I1
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offALL PRO PLBG & HTG INC12/29/2022
DOB NOWPlumbingSigned-offBT'S PLUMBING AND HEATING07/03/2022
DOB NOWConstruction FenceSigned-offHAYDEN BROWN CONS04/21/2022
DOB NOWGeneral ConstructionPermit IssuedHAYDEN BROWN CONS04/21/2022
1 project · most recent 06/12/2022
General Wiring
FiledStatusContractorScope
06/12/2022CompleteAYYUB ELECTRIC CORPGeneral Wiring
▾Field Inspections (DOB CAP) — 7
DateTypeResultReport
05/03/2023Pass-Final Fence Non-Directive 14PassView ↗
03/02/2023Fail-Final PL - Up to 3 Requested FloorsFailView ↗
02/27/2023Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
02/27/2023Certified Storm Drainage-ST-Fixtures-FinishCertifiedView ↗
02/27/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
01/27/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
10/27/2022Pass-Final CND-Occupancy InspectionPassView ↗
▾Special Inspection Requirements (DOB NOW) — 46
DateRequirementInspectorRole
02/23/2024UnderpinningSAEED AINECHIspecial
02/23/2024Fenestration areasSAEED AINECHIenergy_progress
02/23/2024Lighting in dwelling unitsSAEED AINECHIenergy_progress
02/23/2024Fenestration air leakageSAEED AINECHIenergy_progress
02/23/2024Fenestration and door U-factor and product ratingsSAEED AINECHIenergy_progress
02/23/2024Air barrier - visual inspectionSAEED AINECHIenergy_progress
02/23/2024Fire-Resistance Rated ConstructionSAEED AINECHIprogress
02/23/2024Energy Code Compliance InspectionsSAEED AINECHIprogress
02/23/2024Fire-Resistant Penetrations and JointsSAEED AINECHIspecial
02/23/2024Concrete - Cast-In-PlaceSAEED AINECHIspecial
02/23/2024Excavations - Sheeting, Shoring, and BracingSAEED AINECHIspecial
02/23/2024Subgrade InspectionsSAEED AINECHIspecial
02/08/2024Air barrier - visual inspectionSAEED AINECHIenergy_progress
02/08/2024Concrete - Cast-In-PlaceSAEED AINECHIspecial
02/08/2024Excavations - Sheeting, Shoring, and BracingSAEED AINECHIspecial
02/08/2024Fire-Resistant Penetrations and JointsSAEED AINECHIspecial
02/08/2024Subgrade InspectionsSAEED AINECHIspecial
02/08/2024UnderpinningSAEED AINECHIspecial
02/08/2024Energy Code Compliance InspectionsSAEED AINECHIprogress
02/08/2024Fire-Resistance Rated ConstructionSAEED AINECHIprogress
02/08/2024Lighting in dwelling unitsSAEED AINECHIenergy_progress
02/08/2024Fenestration air leakageSAEED AINECHIenergy_progress
02/08/2024Fenestration areasSAEED AINECHIenergy_progress
02/08/2024Fenestration and door U-factor and product ratingsSAEED AINECHIenergy_progress
10/12/2022Fire-Resistant Penetrations and JointsSAEED AINECHIspecial
Latest 25 of 46.
▾Documents — 47 on file (BIS + DOB NOW)
▸Plans & Drawings6
▸DOB NOWPlans/Sketch6
08/26/2026Q00560024-I1Request digital key ↗
08/26/2026Q00560024-P1Request digital key ↗
08/23/2026Q00524837-P2Request digital key ↗
Showing 3 of 6 on file for this type
▸Zoning, Tax Lot & Property Records4
▸DOB NOWZD1: DOB Zoning Diagram3
08/13/2026Q00524837-P2Open ↗
08/13/2026Q00524837-P1Open ↗
08/13/2026Q00524837-I1Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026Q00524837-I1Open ↗
▸Seals & Professional Certifications21
▸DOB NOWProgress Inspector Seal & Signature10
09/23/2026Q00560024-P1Open ↗
09/23/2026Q00560024-P1Open ↗
08/31/2026Q00524837-P2Open ↗
Showing 3 of 10 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature6
08/26/2026Q00560024-P1Open ↗
08/26/2026Q00560024-I1Open ↗
08/23/2026Q00524837-P2Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature5
09/23/2026Q00560024-P1Open ↗
08/31/2026Q00524837-P2Open ↗
08/26/2026Q00524837-P1Open ↗
Showing 3 of 5 on file for this type
▸Safety & Tenant Protection3
▸DOB NOWStreet Tree Checklist3
08/13/2026Q00524837-P2Open ↗
08/13/2026Q00524837-P1Open ↗
08/13/2026Q00524837-I1Open ↗
▸Environmental & Asbestos1
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form1
08/23/2026Q00524837-I1Open ↗
▸Energy Compliance2
▸DOB NOWEN2: As Built Energy Analysis.2
08/13/2026Q00524837-I1Open ↗
08/13/2026Q00560024-I1Open ↗
▸Other Documents10
▸DOB NOWSite Survey: Initial3
08/13/2026Q00524837-P1Open ↗
08/13/2026Q00524837-I1Open ↗
08/13/2026Q00524837-P2Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone3
08/13/2026Q00524837-I1Open ↗
08/13/2026Q00524837-P2Open ↗
08/13/2026Q00524837-P1Open ↗
▸DOB NOWPlot Diagram3
08/13/2026Q00524837-I1Open ↗
08/13/2026Q00524837-P1Open ↗
08/13/2026Q00524837-P2Open ↗
▸DOB NOWFinal Survey1
08/13/2026Q00524837-I1Open ↗