← Back
BuildNYC
Walk-up cooperative
Glen Oaks Village
245-38 76TH AVENUE · Bellerose · BIN 4458920
💬 Discuss this project
1948Year Built
2Stories
C6Building Class
R3-2Zoning
136,802 sfGross Floor Area
168Units
LL97 CoveredRent Stabilized0 Active Violations 3 likely answered ▸
Walk-up cooperative · Owner of record: Glen Oaks Village Owners · 282,525 sf lot · 0.48 FAR built · Flood zone X
Locations of Work
ArchitectureMechanicalPlumbing
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
CellarBoiler plant piping and construction32p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Glen Oaks Village Owners1910/04/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Meszaros Engineering709/18/2026
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Meszaros Engineering1203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
NY City PlumberPlumbing207/22/2026
AbileneGeneral Contractor104/09/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Meszaros Engineering963709/18/2026
Building Lifecycle
All (54)Filed (7)Permit Issued (4)Violation (11)Inspection (2)Special Inspection (30)
09/18/2026
Filed — Alteration
INSTALLATION OF NEW BOILER FOR HEATING. NO CHANGE IN EGRESS OR OCCUPANCY.
Q01215407-P4
09/04/2026
Special inspection requirement — Tenant Protection Plan Compliance
Christian Meszaros
09/04/2026
Special inspection requirement — Permanent certificate
Christian Meszaros
09/04/2026
Special inspection requirement — HVAC-R and service water heating equipment
Christian Meszaros
09/04/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
Christian Meszaros
09/04/2026
Special inspection requirement — HVAC-R and service water heating system controls
Christian Meszaros
09/04/2026
Special inspection requirement — Maintenance information
Christian Meszaros
09/04/2026
Special inspection requirement — Energy Code Compliance Inspections
Christian Meszaros
07/21/2026
Permit issued — Plumbing
Q01215407-S1-PL
04/16/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
02/06/2026
Special inspection requirement — Tenant Protection Plan Compliance
Christian Meszaros
02/06/2026
Special inspection requirement — Permanent certificate
Christian Meszaros
02/06/2026
Special inspection requirement — Maintenance information
Christian Meszaros
02/06/2026
Special inspection requirement — HVAC-R and service water heating system controls
Christian Meszaros
02/06/2026
Special inspection requirement — HVAC-R and service water heating equipment
Christian Meszaros
02/06/2026
Special inspection requirement — Chimneys and vents
Christian Meszaros
02/06/2026
Special inspection requirement — Post-installed Anchors
Christian Meszaros
02/06/2026
Special inspection requirement — Tenant Protection Plan Compliance
Christian Meszaros
02/06/2026
Special inspection requirement — Preliminary
Christian Meszaros
02/06/2026
Special inspection requirement — Final
Christian Meszaros
02/06/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
Christian Meszaros
02/05/2026
Filed — Alteration
INSTALLATION OF NEW BOILER FOR HEATING. NO CHANGE IN EGRESS OR OCCUPANCY.
Q01215407-P2
02/05/2026
Filed — Alteration
INSTALLATION OF NEW BOILER FOR HEATING. NO CHANGE IN EGRESS OR OCCUPANCY.
Q01215407-P3
01/29/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
Christian Meszaros
01/29/2026
Special inspection requirement — HVAC-R and service water heating system controls
Christian Meszaros
01/29/2026
Special inspection requirement — Maintenance information
Christian Meszaros
01/29/2026
Special inspection requirement — Permanent certificate
Christian Meszaros
01/29/2026
Special inspection requirement — HVAC-R and service water heating equipment
Christian Meszaros
01/29/2026
Special inspection requirement — Tenant Protection Plan Compliance
Christian Meszaros
01/26/2026
Filed — Alteration
INSTALLATION OF NEW BOILER FOR HEATING. NO CHANGE IN EGRESS OR OCCUPANCY.
Q01215407-P1
01/26/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
Christian Meszaros
01/26/2026
Special inspection requirement — Tenant Protection Plan Compliance
Christian Meszaros
01/26/2026
Special inspection requirement — Fuel-Oil Storage and Fuel-Oil Piping Systems
Christian Meszaros
01/26/2026
Special inspection requirement — Heating Systems
Christian Meszaros
01/26/2026
Special inspection requirement — HVAC-R and service water heating equipment
Christian Meszaros
01/26/2026
Special inspection requirement — Permanent certificate
Christian Meszaros
01/16/2026
Inspection — Pass-Final Boiler Equipment Inspection
Pass
View inspection ↗
06/06/2025
Permit issued — General Construction
Q01215407-I1-GC
06/06/2025
Permit issued — Boiler Equipment
Q01215407-S2-BE
06/06/2025
Permit issued — Plumbing
Q01215407-S1-PL
05/27/2025
Filed — Alteration
INSTALLATION OF NEW BOILER FOR HEATING. NO CHANGE IN EGRESS OR OCCUPANCY.
Q01215407-I1
05/27/2025
Filed — Alteration
INSTALLATION OF NEW BOILER FOR HEATING. NO CHANGE IN EGRESS OR OCCUPANCY.
Q01215407-S1
05/27/2025
Filed — Alteration
INSTALLATION OF NEW BOILER FOR HEATING. NO CHANGE IN EGRESS OR OCCUPANCY.
Q01215407-S2
06/30/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/30/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/30/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
05/15/2014
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
05/15/2014
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
05/15/2014
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
12/13/2011
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
03/16/1999
Violation issued (DOB, closed)
V-DOB VIOLATION - ACTIVE
03/16/1999
Violation issued (DOB, closed)
V-DOB VIOLATION - ACTIVE
05/04/1998
Violation issued (DOB, closed)
V-DOB VIOLATION - ACTIVE
05/04/1998
Violation issued (DOB, closed)
V-DOB VIOLATION - ACTIVE
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offNY City Plumber07/21/2026
DOB NOWGeneral ConstructionPermit IssuedAbilene06/06/2025
DOB NOWBoiler EquipmentSigned-offAbilene06/06/2025
DOB NOWPlumbingSigned-offNY City Plumber06/06/2025
BISPLISSUEDNational Mechanical Services Plumbing04/26/1990
1 project · most recent 09/18/2026
Gas
FiledStatusContractorScope
09/18/2026Signed-offNY City PlumberGas
1 project · most recent 08/21/2025
Boiler Controls
FiledStatusContractorScope
08/21/2025CompleteAbilene ElectricBoiler Controls
▾Field Inspections (DOB CAP) — 2
DateTypeResultReport
04/16/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
01/16/2026Pass-Final Boiler Equipment InspectionPassView ↗
▾Special Inspection Requirements (DOB NOW) — 40
DateRequirementInspectorRole
09/04/2026Tenant Protection Plan ComplianceChristian Meszarosspecial
09/04/2026Permanent certificateChristian Meszarosenergy_progress
09/04/2026HVAC-R and service water heating equipmentChristian Meszarosenergy_progress
09/04/2026HVAC-R and service water piping design and insulationChristian Meszarosenergy_progress
09/04/2026HVAC-R and service water heating system controlsChristian Meszarosenergy_progress
09/04/2026Maintenance informationChristian Meszarosenergy_progress
09/04/2026Energy Code Compliance InspectionsChristian Meszarosprogress
02/06/2026Tenant Protection Plan ComplianceChristian Meszarosspecial
02/06/2026Permanent certificateChristian Meszarosenergy_progress
02/06/2026Maintenance informationChristian Meszarosenergy_progress
02/06/2026HVAC-R and service water heating system controlsChristian Meszarosenergy_progress
02/06/2026HVAC-R and service water heating equipmentChristian Meszarosenergy_progress
02/06/2026Chimneys and ventsChristian Meszarosspecial
02/06/2026Post-installed AnchorsChristian Meszarosspecial
02/06/2026Tenant Protection Plan ComplianceChristian Meszarosspecial
02/06/2026PreliminaryChristian Meszarosprogress
02/06/2026FinalChristian Meszarosprogress
02/06/2026HVAC-R and service water piping design and insulationChristian Meszarosenergy_progress
01/29/2026HVAC-R and service water piping design and insulationChristian Meszarosenergy_progress
01/29/2026HVAC-R and service water heating system controlsChristian Meszarosenergy_progress
01/29/2026Maintenance informationChristian Meszarosenergy_progress
01/29/2026Permanent certificateChristian Meszarosenergy_progress
01/29/2026HVAC-R and service water heating equipmentChristian Meszarosenergy_progress
01/29/2026Tenant Protection Plan ComplianceChristian Meszarosspecial
01/26/2026HVAC-R and service water piping design and insulationChristian Meszarosenergy_progress
Latest 25 of 40.
▾Documents — 60 on file (BIS + DOB NOW)
▸Plans & Drawings6
▸DOB NOWPlans/Sketch6
08/17/2026Q01215407-S1Request digital key ↗
08/17/2026Q01215407-P3Request digital key ↗
08/17/2026Q01215407-S2Request digital key ↗
Showing 3 of 6 on file for this type
▸Seals & Professional Certifications47
▸DOB NOWProgress Inspector Seal & Signature28
10/04/2026Q01215407-P4Open ↗
10/04/2026Q01215407-P4Open ↗
10/04/2026Q01215407-P4Open ↗
Showing 3 of 28 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature12
10/04/2026Q01215407-P4Open ↗
09/20/2026Q01215407-S1Open ↗
08/31/2026Q01215407-P3Open ↗
Showing 3 of 12 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature7
10/04/2026Q01215407-P4Open ↗
08/17/2026Q01215407-S2Open ↗
08/17/2026Q01215407-S1Open ↗
Showing 3 of 7 on file for this type
▸Environmental & Asbestos7
▸DOB NOWDEP ACP-5: Asbestos Assessment Report7
10/04/2026Q01215407-P4Open ↗
08/17/2026Q01215407-S1Open ↗
08/17/2026Q01215407-I1Open ↗
Showing 3 of 7 on file for this type