| Owner | Filings | Most Recent |
|---|---|---|
| HAYDEN BROWN CONSTRUCTION | 19 | 07/08/2026 |
| Date | Price | Unit | Seller → Buyer | $/sf |
|---|---|---|---|---|
| 04/26/2024 | $1.4M | — | 245-40 147TH AVE LLC → 731 WASHINGTON REALTY LLC | $485/sf building |
| 07/31/2023 | $650K | — | — → — | $218/sf building |
| Firm | Filings | Most Recent |
|---|---|---|
| CL ENGINEERING P.C. | 7 | 03/25/2024 |
| Representative | Filings | Most Recent |
|---|---|---|
| METRO DESIGN CONSULTANTS INC | 14 | 03/21/2026 |
| Firm | Trade | Roles | Most Recent |
|---|---|---|---|
| HAYDEN BROWN CONS CORP | General Contractor | 3 | 07/08/2026 |
| INFINITI ESC PLUMBING COR | Plumbing | 1 | 07/08/2026 |
| Agency | License # | Filings | Most Recent |
|---|---|---|---|
| CL ENGINEERING P.C. | 6781 | 6 | 03/25/2024 |
| TRIANGLE INSPECTION & TES | 7495 | 2 | 01/25/2024 |
| Source | Work Type | Status | Applicant | Issued |
|---|---|---|---|---|
| DOB NOW | Plumbing | Signed-off | INFINITI ESC PLUMBING COR | 09/18/2023 |
| DOB NOW | General Construction | Permit Issued | HAYDEN BROWN CONS | 09/08/2023 |
| DOB NOW | Construction Fence | Signed-off | HAYDEN BROWN CONS | 08/08/2023 |
| Filed | Status | Contractor | Scope | Make / Model / Capacity |
|---|---|---|---|---|
| 03/25/2024 | Permit Issued | HAYDEN BROWN CONS CORP | Air Conditioning Systems, Heating Systems, Ventilation Systems | Cooling Goodman GSXN3N3610AA 36,000 BTU · Condensing Unit ×3 GSXN3N6010AA 60,000 BTU · Condensing Unit ×3 GSX130601A 60,000 BTU · Condensing Unit ×2 Heating Goodman GM9S800603BNAA 60,000 BTU · Furnace ×3 GM9S921005CNAA 100,000 BTU · Furnace ×3 GMVM970803BN 80,000 BTU · Furnace ×1 GMVM971005CN 100,000 BTU · Furnace ×1 Ventilation Hampton Bay 7114-01 50 CFM · Exhaust Fan ×20 Samsung ME16A4021AS 300 CFM · Exhaust Fan ×6 Delta Breeze SMT150 150 CFM · Exhaust Fan ×2 |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 03/25/2024 | Signed-off | INFINITI ESC PLUMBING COR | Gas, Storm, Water/Sanitary |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 09/16/2023 | Complete | AYYUB ELECTRIC CORP | General Wiring |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 03/25/2024 | Signed-off | INFINITI ESC PLUMBING COR | Steel, Wood |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 03/25/2024 | Signed-off | INFINITI ESC PLUMBING COR | Fence |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 03/25/2024 | Signed-off | INFINITI ESC PLUMBING COR | Earthwork |
| Date | Type | Result | Report |
|---|---|---|---|
| 02/21/2024 | Pass-Final CND-Occupancy Inspection | Pass | View ↗ |
| 10/30/2023 | Certified Gas-Gas-Piping-Roughing | Certified | View ↗ |
| 10/30/2023 | Certified Storm Drainage-ST-Piping-Roughing | Certified | View ↗ |
| 10/30/2023 | Certified Storm Drainage-ST-Piping-Underground | Certified | View ↗ |
| 10/30/2023 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 09/28/2023 | Pass-Final PL - Up to 3 Requested Floors | Pass | View ↗ |
| Date | Requirement | Inspector | Role |
|---|---|---|---|
| 04/18/2024 | Interior lighting power | CHRISTIAN LOZADA | energy_progress |
| 04/18/2024 | Electric vehicle service equipment requirements | CHRISTIAN LOZADA | energy_progress |
| 04/18/2024 | Fenestration and door U-factor and product ratings | CHRISTIAN LOZADA | energy_progress |
| 04/18/2024 | Metering | CHRISTIAN LOZADA | energy_progress |
| 04/18/2024 | Permanent certificate | CHRISTIAN LOZADA | energy_progress |
| 04/18/2024 | Air barrier — testing | CHRISTIAN LOZADA | energy_progress |
| 04/18/2024 | Fenestration areas | CHRISTIAN LOZADA | energy_progress |
| 04/18/2024 | Air barrier - visual inspection | CHRISTIAN LOZADA | energy_progress |
| 04/18/2024 | Insulation placement and R values | CHRISTIAN LOZADA | energy_progress |
| 04/18/2024 | HVAC-R and service water heating equipment | CHRISTIAN LOZADA | energy_progress |
| 04/18/2024 | HVAC-R and service water piping design and insulation | CHRISTIAN LOZADA | energy_progress |
| 04/18/2024 | Duct leakage testing, insulation and design | CHRISTIAN LOZADA | energy_progress |
| 04/18/2024 | Maintenance information | CHRISTIAN LOZADA | energy_progress |
| 04/18/2024 | Ventilation and air distribution system | CHRISTIAN LOZADA | energy_progress |
| 04/18/2024 | Fenestration air leakage | CHRISTIAN LOZADA | energy_progress |
| 04/18/2024 | HVAC-R and service water heating system controls | CHRISTIAN LOZADA | energy_progress |
| 04/18/2024 | Fire-Resistant Penetrations and Joints | CHRISTIAN LOZADA | special |
| 04/18/2024 | Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation | CHRISTIAN LOZADA | special |
| 04/18/2024 | Heating Systems | CHRISTIAN LOZADA | special |
| 04/18/2024 | Structural Steel - Details | CHRISTIAN LOZADA | special |
| 04/18/2024 | Mechanical Systems | CHRISTIAN LOZADA | special |
| 04/18/2024 | Structural Steel - High Strength Bolting | CHRISTIAN LOZADA | special |
| 04/18/2024 | Concrete - Cast-In-Place | CHRISTIAN LOZADA | special |
| 04/18/2024 | Structural Stability – Alterations of existing buildings | CHRISTIAN LOZADA | special |
| 04/18/2024 | Subsurface Investigations (Borings/Test Pits) | Rajasekhar Sakhamuri | special |