← Back
Two family converted from one family
245-40 147 AVENUE
QUEENS · Rosedale · BIN 4289617
💬 Discuss this project
1955Year Built
2Stories
B3Building Class
R3XZoning
2,987 sfGross Floor Area
2Units
Two family converted from one family · Owner of record: 731 WASHINGTON REALTY LLC · 5,000 sf lot · 0.6 FAR built · Flood zone X500
Locations of Work
ArchitectureStructuralMechanicalPlumbing
Floor 233p · 1 filing · 20 docs
Floor 133p · 1 filing · 20 docs
Cellar39p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
HAYDEN BROWN CONSTRUCTION1907/08/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
04/26/2024$1.4M—245-40 147TH AVE LLC → 731 WASHINGTON REALTY LLC$485/sf building
07/31/2023$650K—— → —$218/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
CL ENGINEERING P.C.703/25/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
METRO DESIGN CONSULTANTS INC1403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
HAYDEN BROWN CONS CORPGeneral Contractor307/08/2026
INFINITI ESC PLUMBING CORPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
CL ENGINEERING P.C.6781603/25/2024
TRIANGLE INSPECTION & TES7495201/25/2024
Building Lifecycle
All (62)Filed (7)Permit Issued (3)Signed Off (2)Inspection (6)Objection (14)Special Inspection (30)
04/18/2024
Special inspection requirement — Structural Wood Frame
CHRISTIAN LOZADA
04/18/2024
Special inspection requirement — Electric vehicle service equipment requirements
CHRISTIAN LOZADA
04/18/2024
Special inspection requirement — Concrete - Cast-In-Place
CHRISTIAN LOZADA
04/18/2024
Special inspection requirement — Footing and Foundation
CHRISTIAN LOZADA
04/18/2024
Special inspection requirement — Duct leakage testing, insulation and design
CHRISTIAN LOZADA
04/18/2024
Special inspection requirement — Fenestration and door U-factor and product ratings
CHRISTIAN LOZADA
04/18/2024
Special inspection requirement — Heating Systems
CHRISTIAN LOZADA
04/18/2024
Special inspection requirement — Structural Steel - High Strength Bolting
CHRISTIAN LOZADA
04/18/2024
Special inspection requirement — Masonry
CHRISTIAN LOZADA
04/18/2024
Special inspection requirement — Energy Code Compliance Inspections
CHRISTIAN LOZADA
04/18/2024
Special inspection requirement — HVAC-R and service water heating system controls
CHRISTIAN LOZADA
04/18/2024
Special inspection requirement — Maintenance information
CHRISTIAN LOZADA
04/18/2024
Special inspection requirement — Insulation placement and R values
CHRISTIAN LOZADA
04/18/2024
Special inspection requirement — Metering
CHRISTIAN LOZADA
04/18/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
CHRISTIAN LOZADA
04/18/2024
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
CHRISTIAN LOZADA
04/18/2024
Special inspection requirement — Structural Steel - Details
CHRISTIAN LOZADA
04/18/2024
Special inspection requirement — Mechanical Systems
CHRISTIAN LOZADA
04/18/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
CHRISTIAN LOZADA
04/18/2024
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
Rajasekhar Sakhamuri
04/18/2024
Special inspection requirement — Subgrade Inspections
CHRISTIAN LOZADA
04/18/2024
Special inspection requirement — Excavations - Sheeting, Shoring, and Bracing
CHRISTIAN LOZADA
04/18/2024
Special inspection requirement — Fire-Resistance Rated Construction
CHRISTIAN LOZADA
04/18/2024
Special inspection requirement — Final
CHRISTIAN LOZADA
04/18/2024
Special inspection requirement — Fenestration air leakage
CHRISTIAN LOZADA
04/18/2024
Special inspection requirement — Ventilation and air distribution system
CHRISTIAN LOZADA
04/18/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
CHRISTIAN LOZADA
04/18/2024
Special inspection requirement — HVAC-R and service water heating equipment
CHRISTIAN LOZADA
04/18/2024
Special inspection requirement — Fenestration areas
CHRISTIAN LOZADA
04/18/2024
Special inspection requirement — Interior lighting power
CHRISTIAN LOZADA
03/25/2024
Filed — ALT-CO - New Building with Existing Elements to Remain
INSTALLATION OF TEMPORARY CONSTRUCTION FENCE IN CONJUNCTION WITH DOB NOW APPLICATION #Q00873189-I1. FENCE SHALL COMPLY WITH CHAPTER 33 OF THE NYC BUILDING CODE.
Q00873189-P5
02/21/2024
Signed off — ALT-CO - New Building with Existing Elements to Remain
INSTALLATION OF TEMPORARY CONSTRUCTION FENCE IN CONJUNCTION WITH DOB NOW APPLICATION #Q00873189-I1. FENCE SHALL COMPLY WITH CHAPTER 33 OF THE NYC BUILDING CODE.
Q00873189-S2
02/21/2024
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
02/08/2024
Signed off — ALT-CO - New Building with Existing Elements to Remain
INSTALLATION OF TEMPORARY CONSTRUCTION FENCE IN CONJUNCTION WITH DOB NOW APPLICATION #Q00873189-I1. FENCE SHALL COMPLY WITH CHAPTER 33 OF THE NYC BUILDING CODE.
Q00873189-S1
01/26/2024
Filed — ALT-CO - New Building with Existing Elements to Remain
INSTALLATION OF TEMPORARY CONSTRUCTION FENCE IN CONJUNCTION WITH DOB NOW APPLICATION #Q00873189-I1. FENCE SHALL COMPLY WITH CHAPTER 33 OF THE NYC BUILDING CODE.
Q00873189-P4
01/25/2024
Filed — ALT-CO - New Building with Existing Elements to Remain
INSTALLATION OF TEMPORARY CONSTRUCTION FENCE IN CONJUNCTION WITH DOB NOW APPLICATION #Q00873189-I1. FENCE SHALL COMPLY WITH CHAPTER 33 OF THE NYC BUILDING CODE.
Q00873189-P3
10/30/2023
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
10/30/2023
Inspection — Certified Storm Drainage-ST-Piping-Roughing
Certified
View inspection ↗
10/30/2023
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
10/30/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
09/28/2023
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
09/18/2023
Permit issued — Plumbing
Q00873189-S2-PL
09/08/2023
Permit issued — General Construction
Q00873189-I1-GC-CX
08/18/2023
Filed — ALT-CO - New Building with Existing Elements to Remain
INSTALLATION OF TEMPORARY CONSTRUCTION FENCE IN CONJUNCTION WITH DOB NOW APPLICATION #Q00873189-I1. FENCE SHALL COMPLY WITH CHAPTER 33 OF THE NYC BUILDING CODE.
Q00873189-P2
08/08/2023
Permit issued — Construction Fence
Q00873189-S1-FN
08/08/2023
Objection resolved — Addressed
07/29/2023
Objection raised — Other
07/21/2023
Objection resolved — Addressed
07/12/2023
Filed — ALT-CO - New Building with Existing Elements to Remain
INSTALLATION OF TEMPORARY CONSTRUCTION FENCE IN CONJUNCTION WITH DOB NOW APPLICATION #Q00873189-I1. FENCE SHALL COMPLY WITH CHAPTER 33 OF THE NYC BUILDING CODE.
Q00873189-S2
07/08/2023
Objection raised — Admin
06/30/2023
Filed — ALT-CO - New Building with Existing Elements to Remain
INSTALLATION OF TEMPORARY CONSTRUCTION FENCE IN CONJUNCTION WITH DOB NOW APPLICATION #Q00873189-I1. FENCE SHALL COMPLY WITH CHAPTER 33 OF THE NYC BUILDING CODE.
Q00873189-S1
06/23/2023
Objection resolved — Addressed
06/23/2023
Objection resolved — Addressed
06/20/2023
Objection resolved — Addressed
06/20/2023
Objection resolved — Addressed
06/15/2023
Objection resolved — Addressed
06/11/2023
Objection raised — Zoning
06/11/2023
Objection raised — Inspections
06/11/2023
Objection raised — Admin
06/11/2023
Objection raised — Inspections
Latest 60 of 62 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offINFINITI ESC PLUMBING COR09/18/2023
DOB NOWGeneral ConstructionPermit IssuedHAYDEN BROWN CONS09/08/2023
DOB NOWConstruction FenceSigned-offHAYDEN BROWN CONS08/08/2023
1 project · most recent 03/25/2024
Air Conditioning Systems Heating Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
03/25/2024Permit IssuedHAYDEN BROWN CONS CORPAir Conditioning Systems, Heating Systems, Ventilation Systems
Cooling
Goodman GSXN3N3610AA 36,000 BTU · Condensing Unit ×3
GSXN3N6010AA 60,000 BTU · Condensing Unit ×3
GSX130601A 60,000 BTU · Condensing Unit ×2
Heating
Goodman GM9S800603BNAA 60,000 BTU · Furnace ×3
GM9S921005CNAA 100,000 BTU · Furnace ×3
GMVM970803BN 80,000 BTU · Furnace ×1
GMVM971005CN 100,000 BTU · Furnace ×1
Ventilation
Hampton Bay 7114-01 50 CFM · Exhaust Fan ×20
Samsung ME16A4021AS 300 CFM · Exhaust Fan ×6
Delta Breeze SMT150 150 CFM · Exhaust Fan ×2
1 project · most recent 03/25/2024
Gas Storm Water/Sanitary
FiledStatusContractorScope
03/25/2024Signed-offINFINITI ESC PLUMBING CORGas, Storm, Water/Sanitary
1 project · most recent 09/16/2023
General Wiring
FiledStatusContractorScope
09/16/2023CompleteAYYUB ELECTRIC CORPGeneral Wiring
1 project · most recent 03/25/2024
Steel Wood
FiledStatusContractorScope
03/25/2024Signed-offINFINITI ESC PLUMBING CORSteel, Wood
1 project · most recent 03/25/2024
Fence
FiledStatusContractorScope
03/25/2024Signed-offINFINITI ESC PLUMBING CORFence
1 project · most recent 03/25/2024
Earthwork
FiledStatusContractorScope
03/25/2024Signed-offINFINITI ESC PLUMBING COREarthwork
▾Field Inspections (DOB CAP) — 6
DateTypeResultReport
02/21/2024Pass-Final CND-Occupancy InspectionPassView ↗
10/30/2023Certified Gas-Gas-Piping-RoughingCertifiedView ↗
10/30/2023Certified Storm Drainage-ST-Piping-RoughingCertifiedView ↗
10/30/2023Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
10/30/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
09/28/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
▾Special Inspection Requirements (DOB NOW) — 82
DateRequirementInspectorRole
04/18/2024Interior lighting powerCHRISTIAN LOZADAenergy_progress
04/18/2024Electric vehicle service equipment requirementsCHRISTIAN LOZADAenergy_progress
04/18/2024Fenestration and door U-factor and product ratingsCHRISTIAN LOZADAenergy_progress
04/18/2024MeteringCHRISTIAN LOZADAenergy_progress
04/18/2024Permanent certificateCHRISTIAN LOZADAenergy_progress
04/18/2024Air barrier — testing CHRISTIAN LOZADAenergy_progress
04/18/2024Fenestration areasCHRISTIAN LOZADAenergy_progress
04/18/2024Air barrier - visual inspectionCHRISTIAN LOZADAenergy_progress
04/18/2024Insulation placement and R valuesCHRISTIAN LOZADAenergy_progress
04/18/2024HVAC-R and service water heating equipmentCHRISTIAN LOZADAenergy_progress
04/18/2024HVAC-R and service water piping design and insulationCHRISTIAN LOZADAenergy_progress
04/18/2024Duct leakage testing, insulation and designCHRISTIAN LOZADAenergy_progress
04/18/2024Maintenance informationCHRISTIAN LOZADAenergy_progress
04/18/2024Ventilation and air distribution systemCHRISTIAN LOZADAenergy_progress
04/18/2024Fenestration air leakageCHRISTIAN LOZADAenergy_progress
04/18/2024HVAC-R and service water heating system controlsCHRISTIAN LOZADAenergy_progress
04/18/2024Fire-Resistant Penetrations and JointsCHRISTIAN LOZADAspecial
04/18/2024Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationCHRISTIAN LOZADAspecial
04/18/2024Heating SystemsCHRISTIAN LOZADAspecial
04/18/2024Structural Steel - DetailsCHRISTIAN LOZADAspecial
04/18/2024Mechanical SystemsCHRISTIAN LOZADAspecial
04/18/2024Structural Steel - High Strength BoltingCHRISTIAN LOZADAspecial
04/18/2024Concrete - Cast-In-PlaceCHRISTIAN LOZADAspecial
04/18/2024Structural Stability – Alterations of existing buildingsCHRISTIAN LOZADAspecial
04/18/2024Subsurface Investigations (Borings/Test Pits)Rajasekhar Sakhamurispecial
Latest 25 of 82.
▾Documents — 60 on file (BIS + DOB NOW)
▸Plans & Drawings7
▸DOB NOWPlans/Sketch7
08/24/2026Q00873189-P5Request digital key ↗
08/24/2026Q00873189-P4Request digital key ↗
08/24/2026Q00873189-P3Request digital key ↗
Showing 3 of 7 on file for this type
▸Zoning, Tax Lot & Property Records5
▸DOB NOWZD1: DOB Zoning Diagram4
08/13/2026Q00873189-P4Open ↗
08/13/2026Q00873189-P5Open ↗
08/13/2026Q00873189-P2Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026Q00873189-I1Open ↗
▸Seals & Professional Certifications23
▸DOB NOWSpecial Inspector Seal & Signature8
09/23/2026Q00873189-P5Open ↗
09/23/2026Q00873189-P5Open ↗
08/27/2026Q00873189-S2Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWProgress Inspector Seal & Signature8
09/23/2026Q00873189-P5Open ↗
08/27/2026Q00873189-S2Open ↗
08/27/2026Q00873189-S2Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature7
08/13/2026Q00873189-P4Open ↗
08/13/2026Q00873189-S1Open ↗
08/13/2026Q00873189-P2Open ↗
Showing 3 of 7 on file for this type
▸Environmental & Asbestos6
▸DOB NOWDEP ACP-5: Asbestos Assessment Report6
08/13/2026Q00873189-P3Open ↗
08/13/2026Q00873189-I1Open ↗
08/13/2026Q00873189-S2Open ↗
Showing 3 of 6 on file for this type
▸Inspections & Test Reports5
▸DOB NOWSOIL REPORT4
08/13/2026Q00873189-I1Open ↗
08/13/2026Q00873189-P4Open ↗
08/13/2026Q00873189-P5Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWTR4 Test Report and Plot Diagram1
08/13/2026Q00873189-I1Open ↗
▸Other Documents14
▸DOB NOWSite Survey: Initial4
08/13/2026Q00873189-I1Open ↗
08/13/2026Q00873189-P2Open ↗
08/13/2026Q00873189-P5Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone4
08/13/2026Q00873189-P5Open ↗
08/13/2026Q00873189-P4Open ↗
08/13/2026Q00873189-P2Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWProperty Ownership Certification4
08/13/2026Q00873189-I1Open ↗
08/13/2026Q00873189-P5Open ↗
08/13/2026Q00873189-P2Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWFinal Survey1
08/13/2026Q00873189-I1Open ↗
▸DOB NOWAdjoining Owners Notification1
08/13/2026Q00873189-I1Open ↗