← Back
BuildNYC
Walk-up cooperative
Glen Oaks Village
245-62 77 CRESCENT · Bellerose · BIN 4458316
💬 Discuss this project
1947Year Built
2Stories
C6Building Class
R3-2Zoning
133,656 sfGross Floor Area
168Units
LL97 CoveredRent Stabilized0 Active ViolationsFDNY Report ↗
Walk-up cooperative · Owner of record: Glen Oaks Village Owners · 278,100 sf lot · 0.48 FAR built · Flood zone X
Locations of Work
MechanicalPlumbing
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Roof1p · 1 filing · 6 docs
CellarMechanical work11p · 4 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Glen Oaks Village Owners703/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
New Age606/26/2024
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
AbileneGeneral Contractor403/21/2026
NY City PlumberPlumbing407/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
New Age Engineering7746405/15/2023
Building Lifecycle
All (43)Filed (6)Permit Issued (7)Signed Off (4)Violation (3)Inspection (5)Special Inspection (18)
10/04/2024
Signed off — Alteration
INSTALL (4) NEW GAS-FIRED BOILERS AS PER PLANS. NO CHANGE IN USE, OCCUPANCY, OR EGRESS.
Q00742476-I1
10/03/2024
Signed off — Alteration
INSTALL REPLACEMENT GAS PIPING AS PER PLANS. NO CHANGE IN USE, OCCUPANCY, OR EGRESS.
Q00739415-I1
09/13/2024
Signed off — Alteration
INSTALL NEW DIRECT VENTS AS PER PLANS. NO CHANGE IN USE, OCCUPANCY, OR EGRESS.
Q00739417-I1
09/13/2024
Signed off — Alteration
Q00739412-I1
09/03/2024
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
08/08/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
07/29/2024
Inspection — Pass-Final Boiler Equipment Inspection
Pass
View inspection ↗
06/26/2024
Filed — Alteration
INSTALL (4) NEW GAS-FIRED BOILERS AS PER PLANS. NO CHANGE IN USE, OCCUPANCY, OR EGRESS.
Q00742476-P1
06/26/2024
Special inspection requirement — HVAC-R and service water heating equipment
Stephen Shishko
06/26/2024
Special inspection requirement — Maintenance information
Stephen Shishko
06/26/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
Stephen Shishko
06/26/2024
Special inspection requirement — Tenant Protection Plan Compliance
Stephen Shishko
06/26/2024
Special inspection requirement — HVAC-R and service water heating system controls
Stephen Shishko
05/03/2024
Filed — Alteration
INSTALL REPLACEMENT GAS PIPING AS PER PLANS. NO CHANGE IN USE, OCCUPANCY, OR EGRESS.
Q00739415-P1
05/03/2024
Special inspection requirement — Tenant Protection Plan Compliance
Stephen Shishko
05/03/2024
Special inspection requirement — Energy Code Compliance Inspections
Stephen Shishko
05/03/2024
Special inspection requirement — HVAC-R and service water heating system controls
Stephen Shishko
05/03/2024
Special inspection requirement — HVAC-R and service water heating equipment
Stephen Shishko
05/03/2024
Special inspection requirement — Maintenance information
Stephen Shishko
04/26/2024
Special inspection requirement — Tenant Protection Plan Compliance
04/23/2024
Special inspection requirement — Maintenance information
Stephen Shishko
04/23/2024
Special inspection requirement — Energy Code Compliance Inspections
Stephen Shishko
04/23/2024
Special inspection requirement — HVAC-R and service water heating equipment
Stephen Shishko
04/23/2024
Special inspection requirement — HVAC-R and service water heating system controls
Stephen Shishko
04/22/2024
Permit issued — Mechanical Systems
Q00739417-I1-MS
04/22/2024
Permit issued — Boiler Equipment
Q00742476-I1-BE
04/22/2024
Permit issued — Plumbing
Q00739415-I1-PL
04/05/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
02/23/2024
Inspection — Pass-Final Boiler Equipment Inspection
Pass
View inspection ↗
06/30/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
05/19/2023
Permit issued — Plumbing
Q00739415-I1-PL
05/19/2023
Permit issued — Boiler Equipment
Q00739412-I1-BE
05/19/2023
Permit issued — Mechanical Systems
Q00739417-I1-MS
05/19/2023
Permit issued — Boiler Equipment
Q00742476-I1-BE
05/15/2023
Filed — Alteration
INSTALL (4) NEW GAS-FIRED BOILERS AS PER PLANS. NO CHANGE IN USE, OCCUPANCY, OR EGRESS.
Q00742476-I1
05/15/2023
Filed — Alteration
INSTALL REPLACEMENT GAS PIPING AS PER PLANS. NO CHANGE IN USE, OCCUPANCY, OR EGRESS.
Q00739415-I1
05/15/2023
Filed — Alteration
INSTALL NEW DIRECT VENTS AS PER PLANS. NO CHANGE IN USE, OCCUPANCY, OR EGRESS.
Q00739417-I1
05/15/2023
Filed — Alteration
Q00739412-I1
03/16/2023
Special inspection requirement — Tenant Protection Plan Compliance
Stephen Shishko
05/16/2022
Special inspection requirement — Mechanical Systems
Stephen Shishko
05/16/2022
Special inspection requirement — Final
Stephen Shishko
05/15/2014
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
08/13/2008
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsSigned-offAbilene04/22/2024
DOB NOWBoiler EquipmentSigned-offNY City Plumber04/22/2024
DOB NOWPlumbingSigned-offNY City Plumber04/22/2024
DOB NOWPlumbingSigned-offNY City Plumber05/19/2023
DOB NOWBoiler EquipmentSigned-offAbilene05/19/2023
DOB NOWMechanical SystemsSigned-offAbilene05/19/2023
DOB NOWBoiler EquipmentSigned-offNY City Plumber05/19/2023
BISPLISSUEDAqua Blue Plumbing Svces01/12/2011
BISPLISSUEDSenid PL & Heating01/29/2010
BISPLISSUEDSenid PL & Heating01/12/2010
BISBLISSUEDSenid PL & Heating07/03/2007
BISPLISSUEDSenid PL & Heating07/03/2007
1 project · most recent 06/23/2023
Boiler Controls
FiledStatusContractorScope
06/23/2023CompleteAbilene ElectricBoiler Controls
▾Field Inspections (DOB CAP) — 5
DateTypeResultReport
09/03/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
08/08/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
07/29/2024Pass-Final Boiler Equipment InspectionPassView ↗
04/05/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
02/23/2024Pass-Final Boiler Equipment InspectionPassView ↗
▾Special Inspection Requirements (DOB NOW) — 18
DateRequirementInspectorRole
06/26/2024HVAC-R and service water heating equipmentStephen Shishkoenergy_progress
06/26/2024Maintenance informationStephen Shishkoenergy_progress
06/26/2024HVAC-R and service water piping design and insulationStephen Shishkoenergy_progress
06/26/2024Tenant Protection Plan ComplianceStephen Shishkospecial
06/26/2024HVAC-R and service water heating system controlsStephen Shishkoenergy_progress
05/03/2024Tenant Protection Plan ComplianceStephen Shishkospecial
05/03/2024Energy Code Compliance InspectionsStephen Shishkoprogress
05/03/2024HVAC-R and service water heating system controlsStephen Shishkoenergy_progress
05/03/2024HVAC-R and service water heating equipmentStephen Shishkoenergy_progress
05/03/2024Maintenance informationStephen Shishkoenergy_progress
04/26/2024Tenant Protection Plan Compliance—special
04/23/2024Maintenance informationStephen Shishkoenergy_progress
04/23/2024Energy Code Compliance InspectionsStephen Shishkoprogress
04/23/2024HVAC-R and service water heating equipmentStephen Shishkoenergy_progress
04/23/2024HVAC-R and service water heating system controlsStephen Shishkoenergy_progress
03/16/2023Tenant Protection Plan ComplianceStephen Shishkospecial
05/16/2022Mechanical SystemsStephen Shishkospecial
05/16/2022FinalStephen Shishkoprogress
▾Documents — 37 on file (BIS + DOB NOW)
▸Plans & Drawings6
▸DOB NOWPlans/Sketch6
08/24/2026Q00739412-I1Request digital key ↗
08/24/2026Q00739417-I1Request digital key ↗
08/24/2026Q00742476-I1Request digital key ↗
Showing 3 of 6 on file for this type
▸Seals & Professional Certifications23
▸DOB NOWProgress Inspector Seal & Signature13
09/23/2026Q00742476-I1Open ↗
09/23/2026Q00742476-I1Open ↗
09/23/2026Q00742476-I1Open ↗
Showing 3 of 13 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature6
08/24/2026Q00739412-I1Open ↗
08/24/2026Q00742476-I1Open ↗
08/24/2026Q00739415-P1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature4
09/23/2026Q00742476-I1Open ↗
08/27/2026Q00739417-I1Open ↗
08/27/2026Q00739417-I1Open ↗
Showing 3 of 4 on file for this type
▸Environmental & Asbestos6
▸DOB NOWDEP ACP-5: Asbestos Assessment Report6
08/24/2026Q00739412-I1Open ↗
08/24/2026Q00742476-I1Open ↗
08/24/2026Q00739415-P1Open ↗
Showing 3 of 6 on file for this type
▸Energy Compliance2
▸DOB NOWPreliminary Commissioning Report Certification2
08/13/2026Q00742476-I1Open ↗
08/13/2026Q00739415-I1Open ↗