← Back
BuildNYC
Three families
245 BAY 35 STREET
BROOKLYN · BIN 3186595
💬 Discuss this project
1965Year Built
3Stories
C0Building Class
R5Zoning
3,168 sfGross Floor Area
3Units
Three families · 2,911 sf lot · 1.09 FAR built · Flood zone X500
Locations of Work
ArchitecturePlumbingGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Floor 311p · 1 filing · 20 docs
Floor 210p · 1 filing · 20 docs
Floor 111p · 1 filing · 20 docs
Cellar10p · 1 filing · 20 docs
Filed — no permit issued2p · 1 filing · 7 docs
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
06/20/2024$1.7M—Private party → Private party$537/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Basic Groups603/26/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Basic Groups1203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Good-Will Mechanicalspecialty_contractor107/08/2026
AAA Total PlumbingPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Andrew Goodrich, P.E.965303/26/2025
Nic 888371207/24/2024
Building Lifecycle
07/25/2025
Signed off — Alteration
PROPOSE INTERIOR RENOVATION ON EXISTING 3 STORY BUILDING, CONSTRUCTIONS WORKS AS PER PLAN.PLUMBING WORK TO BE FILED UNDER SEPARATE APPLICATION. NO CHANGE ON EGRESS USE OR OCCUPANCY.
B01080721-S1
07/25/2025
Signed off — Alteration
PROPOSE INTERIOR RENOVATION ON EXISTING 3 STORY BUILDING, CONSTRUCTIONS WORKS AS PER PLAN.PLUMBING WORK TO BE FILED UNDER SEPARATE APPLICATION. NO CHANGE ON EGRESS USE OR OCCUPANCY.
B01080721-I1
06/09/2025
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
06/06/2025
Inspection — Fail-Final General Construction Non-Directive 14
Fail
View inspection ↗
06/03/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
44 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offGoodwill Mechanical07/29/2024
DOB NOWPlumbingSigned-offAAA Total Plumbing07/29/2024
1 project · most recent 04/30/2025
General Wiring
FiledStatusContractorScope
04/30/2025CompleteW 8 ElectricGeneral Wiring
▾Field Inspections (DOB CAP) — 7
DateTypeResultReport
06/09/2025Pass-Final General Construction Non-Directive 14PassView ↗
06/06/2025Fail-Final General Construction Non-Directive 14FailView ↗
06/03/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
10/01/2024Certified Gas-Gas-Piping-RoughingCertifiedView ↗
10/01/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
10/01/2024Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
09/27/2024Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 22
DateRequirementInspectorRole
03/26/2025Fire-Resistant Penetrations and JointsEric Sunspecial
03/26/2025Fire-Resistance Rated ConstructionANDREW GOODRICHprogress
03/26/2025Energy Code Compliance InspectionsANDREW GOODRICHprogress
03/26/2025Insulation placement and R valuesANDREW GOODRICHenergy_progress
03/26/2025Lighting controlsANDREW GOODRICHenergy_progress
03/26/2025Interior lighting powerANDREW GOODRICHenergy_progress
09/23/2024Fire-Resistant Penetrations and JointsEric Sunspecial
09/23/2024Energy Code Compliance InspectionsANDREW GOODRICHprogress
09/23/2024HVAC-R and service water heating equipmentANDREW GOODRICHenergy_progress
09/23/2024HVAC-R and service water heating system controlsANDREW GOODRICHenergy_progress
09/23/2024HVAC-R and service water piping design and insulationANDREW GOODRICHenergy_progress
09/19/2024Fire-Resistant Penetrations and JointsANDREW GOODRICHspecial
09/19/2024Energy Code Compliance InspectionsANDREW GOODRICHprogress
09/19/2024HVAC-R and service water piping design and insulationANDREW GOODRICHenergy_progress
09/19/2024HVAC-R and service water heating system controlsANDREW GOODRICHenergy_progress
09/19/2024HVAC-R and service water heating equipmentANDREW GOODRICHenergy_progress
08/09/2024Concrete - Cast-In-Place—special
08/09/2024Energy Code Compliance Inspections—progress
08/09/2024Fire-Resistance Rated Construction—progress
08/07/2024Fire-Resistant Penetrations and Joints—special
08/07/2024Masonry—special
08/06/2024Lowest Floor Elevation—progress
31 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account