3 Open Violations 0 unresolved · 3 paperwork only▸
ECB10/19/2017FAILURE TO PROVIDE PROTECTION AT SIES OF EXCAVATION.NOTED AT TIME OF INSEPCTION AT THE BASE OF NEWLY INSTALLED FOUNDATION FOR GRAND STANDS, THE EXCAVATION DITCH HAD NO PROTECTION OR ANGLE OF REPOSE. THE DITCHNothing owed — awaiting certificate of correction
ECB10/19/2017UNAPPROVED,UNSAFE,UNSUITABLE ELECTRICAL,EQUIPMENT,APPLIANCES,APPARATUS,MATERIALS OR WIRING NOTED: ELECTRICAL EXTENSION CORDS USED AS TEMPORARY WIRING ON GOUND OUTSIDE SUBJECT TO MOISTURE AND DAMAGE CREATING ANothing owed — awaiting certificate of correction
ECB10/19/2017FAILURE TO SAFEGUARD ALL PERSONS AND PROPERTY AFFECTED BY CONSTRUCTION OPERATIONS.NOTED: AT THE ENTRY GATES THERE IS AN EXCESSIVE GAP WHERE THE GATES MEET ALLOWING ACCESS TO THE CONSTRUCTION SITE.2)THERE IS OPENothing owed — awaiting certificate of correction
Playground · 76,936 sf lot · 0 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.