245 EAST 24TH STREET
MANHATTAN · BIN 1019791
💬 Discuss this project
1963Year Built
16Stories
D4Building Class
C1-8AZoning
112,641 sfGross Floor Area
167Units
LL97 CoveredRent Stabilized7 Active Violations ▸FISP: SWARMP
Elevator cooperative · Owner of record: Tracy Tenants · 9,636 sf lot · 11.69 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingEquipmentLandscapeGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
RoofMiscellaneous Facade Restoration ProjectUnder Construction11p · 2 filings · 20 docs
BulkheadFacade restoration suspended scaffoldUnder Construction2p · 3 filings · 20 docs
Floor 14Unit 14K, Unit 14HJ3p · 1 filing · 8 docs
Floor 13
Floor 12
Floor 11
Floor 10
Floor 9
Floor 8
Floor 7
Floor 6Unit 6C, Unit 6D2p · 1 filing · 16 docs
Floor 5
Floor 4
Floor 3
Floor 2
Floor 1Take out cafe interior work, carpentry and finishes3p · 2 filings · 9 docs
Site & exteriorMiscellaneous Facade Restoration ProjectUnder Construction37p · 4 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Tracey Tenants4203/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Rigid Structural Design908/10/2026
Iaa Architects107/20/2024
JMA & Associates105/16/2024
Aminov Design Engineering110/19/2023
Michael Zenreich Architect408/25/2023
Emily Lui211/15/2021
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Rigid Structural Design1303/21/2026
Prat Enterprises603/21/2026
A D Building Solutions203/21/2026
Outsource Consultants103/21/2026
Cube Design Build Management403/21/2026
Tasheed Building Consultants103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Prat EnterprisesScaffold1709/17/2026
Prat EnterprisesGeneral Contractor809/24/2026
Urban Construction & DesignGeneral Contractor303/21/2026
Aqua Blue Plumbing SvcesPlumbing207/08/2026
Padmore VereElectrical103/21/2026
P.S. Marcato Elev. CoElectrical103/21/2026
Aurora Electrical ContgElectrical103/21/2026
Vere ElectricElectrical103/21/2026
BJF Construction CoGeneral Contractor107/08/2026
Ni ConstructionGeneral Contractor107/08/2026
Plumbing P & HPlumbing107/08/2026
Avellino Electrical ContractingElectrical103/21/2026
Raymond's Plumbing & HeatingPlumbing107/08/2026
NY City ElectricElectrical103/21/2026
Midland Electrical CoElectrical103/21/2026
Borowide Elect'l ContractorsElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
KZ Engineering4665508/06/2026
Jay Kavi8500107/20/2024
Outsource Special Inspection2827206/05/2024
Citiscape Consulting762110/19/2023
Michael Zenreich Architects1724408/25/2023
NTD Engineering Consultan7634111/15/2021
Building Lifecycle
All (184)Filed (23)Permit Issued (27)Signed Off (7)Facade (FISP) (12)Violation (60)Inspection (11)Objection (16)Special Inspection (28)
10/12/2026
Signed off — Alteration
INSTALLATION OF A SUSPENDED SCAFFOLD FOR FACADE INSPECTION AND REPAIR AS PER PLAN SUBMITTED. NO CHANGE TO EGRESS OF OCCUPANCY.
M01210898-I1
10/06/2026
Permit issued — Suspended Scaffold
M01441525-I1-SC
09/23/2026
Permit issued — Structural
M01027204-S1-ST
09/16/2026
Permit issued — Supported Scaffold
M01116622-I1-SF
09/02/2026
Permit issued — Sidewalk Shed
M01072935-I1-SH
08/10/2026
Filed — Alteration
Installation of a temporarily heavy-duty sidewalk shed per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
M01072935-P2
08/06/2026
Filed — Alteration
INSTALLATION OF A SUSPENDED SCAFFOLD FOR FACADE INSPECTION AND REPAIR AS PER PLAN SUBMITTED
M01441525-I1
08/05/2026
Special inspection requirement — Alternative Materials - OTCR Buildings Bulletin Number
Karol Zdancewicz
08/05/2026
Special inspection requirement — Post-installed Anchors
Karol Zdancewicz
06/25/2026
Violation issued (HPD, closed)
C
06/25/2026
Violation issued (HPD, open)
A
06/25/2026
Violation issued (HPD, open)
A
06/25/2026
Violation issued (HPD, open)
C
06/25/2026
Violation issued (HPD, open)
B
06/25/2026
Violation issued (HPD, open)
B
06/25/2026
Violation issued (HPD, open)
B
06/09/2026
Permit issued — Sidewalk Shed
M01072935-I1-SH
06/05/2026
Permit issued — General Construction
M01027204-I1-GC
04/21/2026
Permit issued — Suspended Scaffold
M01210898-I1-SC
04/16/2026
Filed — Alteration
Installation of a temporarily supported scaffold per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
M01116622-P3
03/20/2026
Filed — Alteration
INSTALLATION OF A SUSPENDED SCAFFOLD FOR FACADE INSPECTION AND REPAIR AS PER PLAN SUBMITTED. NO CHANGE TO EGRESS OF OCCUPANCY.
M01210898-P2
03/20/2026
Special inspection requirement — Post-installed Anchors
Karol Zdancewicz
03/20/2026
Special inspection requirement — Alternative Materials - OTCR Buildings Bulletin Number
Karol Zdancewicz
03/18/2026
Violation issued (FDNY_ORDER, closed)
03/18/2026
Violation issued (FDNY_ORDER, closed)
03/18/2026
Violation issued (FDNY_ORDER, closed)
03/18/2026
Violation issued (FDNY_ORDER, closed)
01/28/2026
Filed — Alteration
Installation of a temporarily supported scaffold per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
M01116622-P2
12/23/2025
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
10/22/2025
Permit issued — Protection and Mechanical Methods
M01132351-I1-PMM
09/29/2025
Signed off — Alteration
M01056670-I1
09/23/2025
Objection resolved — Addressed
09/22/2025
Objection raised — Other
09/18/2025
Filed — Alteration
INSTALLATION OF A SUSPENDED SCAFFOLD FOR FACADE INSPECTION AND REPAIR AS PER PLAN SUBMITTED. NO CHANGE TO EGRESS OF OCCUPANCY.
M01210898-P1
09/18/2025
Permit issued — Structural
M01027204-S1-ST
09/18/2025
Special inspection requirement — Alternative Materials - OTCR Buildings Bulletin Number
Karol Zdancewicz
09/18/2025
Special inspection requirement — Post-installed Anchors
Karol Zdancewicz
09/17/2025
Permit issued — Supported Scaffold
M01116622-I1-SF
07/02/2025
Permit issued — Suspended Scaffold
M01056670-I1-SC
06/10/2025
Permit issued — General Construction
M01027204-I1-GC
06/09/2025
Permit issued — Sidewalk Shed
M01072935-I1-SH
04/24/2025
Permit issued — Suspended Scaffold
M01210898-I1-SC
04/15/2025
Filed — Alteration
INSTALLATION OF A SUSPENDED SCAFFOLD FOR FACADE INSPECTION AND REPAIR AS PER PLAN SUBMITTED. NO CHANGE TO EGRESS OF OCCUPANCY.
M01210898-I1
03/07/2025
Filed — Alteration
Installation of a temporarily supported scaffold per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
M01116622-P1
01/09/2025
Violation issued (FDNY_NOV, closed)
11/01/2024
Filed — Alteration
Installation of a temporarily heavy-duty sidewalk shed per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
M01072935-P1
10/30/2024
Filed — Alteration
M01132351-I1
10/30/2024
Permit issued — Protection and Mechanical Methods
M01132351-I1-PMM
10/29/2024
Violation issued (ECB, closed)
Construction
10/01/2024
Permit issued — Structural
M01027204-S1-ST
09/27/2024
Filed — Alteration
Installation of a temporarily supported scaffold per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
M01116622-I1
09/27/2024
Permit issued — Supported Scaffold
M01116622-I1-SF
08/13/2024
Permit issued — General Construction
M01076979-I1-GC
07/20/2024
Filed — Alteration
FILING FOR MINOR INTERIOR WORK AT THE EXISTING CORNER RETAIL STORE FOR TAKE OUT CAFE , CARPENTRY, MILL WORK AND FINISHES.
M01076979-I1
07/17/2024
Special inspection requirement — Tenant Protection Plan Compliance
Jay Kavi
07/17/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Jay Kavi
07/03/2024
Permit issued — Sidewalk Shed
M01072935-I1-SH
07/02/2024
Filed — Alteration
Installation of a temporarily heavy-duty sidewalk shed per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
M01072935-I1
06/25/2024
Permit issued — Suspended Scaffold
M01056670-I1-SC
06/17/2024
Permit issued — General Construction
M01027204-I1-GC
Latest 60 of 184 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSuspended ScaffoldPermit IssuedVichihel Restoration10/06/2026
DOB NOWStructuralPermit IssuedPrat Enterprises09/23/2026
DOB NOWSupported ScaffoldPermit IssuedPrat Enterprises09/16/2026
DOB NOWSidewalk ShedPermit IssuedPrat Enterprises09/02/2026
DOB NOWSidewalk ShedPermit IssuedPrat Enterprises06/09/2026
DOB NOWGeneral ConstructionPermit IssuedPrat Enterprises06/05/2026
DOB NOWSuspended ScaffoldSigned-offPrat Enterprises04/21/2026
DOB NOWProtection and Mechanical MethodsPermit IssuedPrat Enterprises10/22/2025
DOB NOWStructuralPermit IssuedPrat Enterprises09/18/2025
DOB NOWSupported ScaffoldPermit IssuedPrat Enterprises09/17/2025
DOB NOWSuspended ScaffoldPermit IssuedPratt Construction & Restoration07/02/2025
DOB NOWGeneral ConstructionPermit IssuedPrat Enterprises06/10/2025
DOB NOWSidewalk ShedPermit IssuedPrat Enterprises06/09/2025
DOB NOWSuspended ScaffoldSigned-offPrat Enterprises04/24/2025
DOB NOWProtection and Mechanical MethodsPermit IssuedPrat Enterprises10/30/2024
DOB NOWStructuralPermit IssuedPrat Enterprises10/01/2024
DOB NOWSupported ScaffoldPermit IssuedPrat Enterprises09/27/2024
DOB NOWGeneral ConstructionPermit IssuedUrban Construction & Design08/13/2024
DOB NOWSidewalk ShedPermit IssuedPrat Enterprises07/03/2024
DOB NOWSuspended ScaffoldPermit IssuedPratt Construction & Restoration06/25/2024
DOB NOWGeneral ConstructionPermit IssuedPrat Enterprises06/17/2024
DOB NOWPlumbingSigned-offAqua Blue Plumbing Svces11/14/2023
DOB NOWPlumbingSigned-offRaymond's Plumbing & Heating11/02/2023
DOB NOWPlumbingSigned-offPlumbing P & H12/28/2022
DOB NOWGeneral ConstructionSigned-offNi Construction12/13/2022
DOB NOWGeneral ConstructionSigned-offBJF Construction Co01/21/2022
DOB NOWPlumbingSigned-offAqua Blue Plumbing Svces01/20/2022
BISOTISSUEDAbilene01/11/2019
BISEQISSUEDRockledge Scaffold10/07/2015
BISBLISSUEDAqua Blue Plumbing Svces07/20/2015
BISPLISSUEDAqua Blue Plumbing Svces07/20/2015
BISPLISSUEDBell Fuel Oil10/01/2013
BISOTISSUEDAbilene08/22/2013
BISBLISSUEDAqua Blue Plumbing Svces10/01/2012
BISPLISSUEDAqua Blue Plumbing Svces10/01/2012
BISPLISSUEDBell Fuel Oil09/10/2012
BISFBISSUEDBell Fuel Oil09/10/2012
BISPLISSUEDImpact Plumbing09/06/2012
BISMHISSUEDJ Thomas Construction08/29/2012
BISPLISSUEDNew York Plumbing & Heating11/17/2011
+ 37 more permits on file
10 projects · most recent 07/08/2026
General Wiring
FiledStatusContractorScope
07/08/2026CompleteEmpire Lic Electrical ContractorsGeneral Wiring
05/07/2026Permit IssuedEmpire Lic Electrical ContractorsGeneral Wiring
10/08/2025CompleteNY City ElectricGeneral Wiring
09/05/2024Permit IssuedAurora Electrical Contg—
01/09/2024CompleteEverest Electrical ContractingGeneral Wiring
08/11/2023CompleteNas ElectricGeneral Wiring
06/01/2023CompleteEvs ElectricGeneral Wiring
01/30/2023CompletePower Surge ElectricGeneral Wiring
06/18/2019Permit IssuedRNH Electric CompanyGeneral Wiring
02/27/2018Permit IssuedEcs Electrical Contg ServiceGeneral Wiring
2 projects · most recent 08/06/2026
Suspended Scaffold (SC)
FiledStatusContractorScope
08/06/2026Permit IssuedPrat EnterprisesSuspended Scaffold (SC)
03/20/2026Signed-offPrat EnterprisesSuspended Scaffold (SC)
▾Field Inspections (DOB CAP) — 11
DateTypeResultReport
12/29/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
11/24/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
09/13/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
07/26/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
06/26/2023Fail-Final PL - Up to 3 Requested FloorsFailView ↗
06/20/2023Certified Gas-Gas-Piping-RoughingCertifiedView ↗
06/14/2023Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
06/06/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
01/20/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
01/18/2023Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
01/25/2022Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 28
DateRequirementInspectorRole
08/05/2026Alternative Materials - OTCR Buildings Bulletin NumberKarol Zdancewiczspecial
08/05/2026Post-installed AnchorsKarol Zdancewiczspecial
03/20/2026Post-installed AnchorsKarol Zdancewiczspecial
03/20/2026Alternative Materials - OTCR Buildings Bulletin NumberKarol Zdancewiczspecial
09/18/2025Alternative Materials - OTCR Buildings Bulletin NumberKarol Zdancewiczspecial
09/18/2025Post-installed AnchorsKarol Zdancewiczspecial
07/17/2024Tenant Protection Plan ComplianceJay Kavispecial
07/17/2024Fire-Resistant Penetrations and JointsJay Kavispecial
06/11/2024Post-installed AnchorsKarol Zdancewiczspecial
06/11/2024Alternative Materials - OTCR Buildings Bulletin NumberKarol Zdancewiczspecial
05/28/2024FinalJONAR MADRIAGAprogress
05/28/2024Tenant Protection Plan ComplianceJONAR MADRIAGAspecial
05/28/2024Structural Stability – Alterations of existing buildingsJONAR MADRIAGAspecial
03/28/2024Construction Operations Influencing Adjacent StructuresJONAR MADRIAGAspecial
03/28/2024MasonryJONAR MADRIAGAspecial
03/28/2024Post-installed AnchorsJONAR MADRIAGAspecial
03/28/2024Structural Stability – Alterations of existing buildingsJONAR MADRIAGAspecial
03/28/2024Tenant Protection Plan ComplianceJONAR MADRIAGAspecial
03/28/2024Energy Code Compliance InspectionsNicholas Ferraraprogress
03/28/2024FinalNicholas Ferraraprogress
03/28/2024Air barrier - visual inspectionNicholas Ferraraenergy_progress
10/16/2023Tenant Protection Plan ComplianceJoe Liebermanspecial
02/16/2023Lighting in dwelling unitsMichael Zenreichenergy_progress
02/16/2023FinalMichael Zenreichprogress
02/16/2023Energy Code Compliance InspectionsMichael Zenreichprogress
Latest 25 of 28.
▾Documents — 272 on file (BIS + DOB NOW)
▸Plans & Drawings23
▸DOB NOWPlans/Sketch23
09/03/2026M00551595-S1Request digital key ↗
09/01/2026M07995871-P2Request digital key ↗
08/28/2026M00948214-I1Request digital key ↗
Showing 3 of 23 on file for this type
▸Applications & Permits46
▸BISWORK PERMIT APPLICATION31
01/14/2019123526185Open ↗
01/14/2019123526185Open ↗
10/07/2015140412211Open ↗
Showing 3 of 31 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION15
01/14/2019123526185Open ↗
10/07/2015140412211Open ↗
09/12/2012121156131Open ↗
Showing 3 of 15 on file for this type
▸Seals & Professional Certifications81
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION24
07/31/2019123526185Open ↗
01/14/2019123526185Open ↗
01/12/2016140412211Open ↗
Showing 3 of 24 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature19
09/01/2026M07995871-I1Open ↗
09/01/2026M07995871-P1Open ↗
09/01/2026M07995871-P2Open ↗
Showing 3 of 19 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature19
09/01/2026M07995871-P1Open ↗
08/31/2026M01027204-I1Open ↗
08/31/2026M01027204-I1Open ↗
Showing 3 of 19 on file for this type
▸DOB NOWProgress Inspector Seal & Signature9
09/01/2026M07995871-P1Open ↗
09/01/2026M07995871-P1Open ↗
09/01/2026M07995871-P1Open ↗
Showing 3 of 9 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST3
01/14/2019123526185Open ↗
09/12/2012121156131Open ↗
10/18/2010120499683Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM3
09/12/2012121156131Open ↗
11/23/2010120536018Open ↗
10/18/2010120499683Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT2
01/14/2019123526185Open ↗
10/07/2015140412211Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
10/07/2015140412211Open ↗
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION1
10/07/2015140412211Open ↗
▸Trade Schedules & Equipment23
▸BISSELF-CERT PLUMBING NOTICE10
03/04/2014121156131Open ↗
12/30/2013121156131Open ↗
11/22/2013121156131Open ↗
Showing 3 of 10 on file for this type
▸BISSCHEDULE B - PLUMBING8
09/12/2012121156131Open ↗
07/10/2012121144396Open ↗
10/12/2011120689790Open ↗
Showing 3 of 8 on file for this type
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT4
01/14/2019123526185Open ↗
07/23/2015120536018Open ↗
09/12/2012121156131Open ↗
Showing 3 of 4 on file for this type
▸BISBOILERS - SUPPORTING DOCUMENTATION1
12/30/2013121156131Open ↗
▸Environmental & Asbestos25
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'10
08/16/2011120787363Open ↗
05/17/2011120689790Open ↗
07/08/2010120401485Open ↗
Showing 3 of 10 on file for this type
▸DOB NOWDEP ACP-5: Asbestos Assessment Report10
09/01/2026M07995871-P2Open ↗
08/28/2026M00948214-I1Open ↗
08/27/2026M01027204-S1Open ↗
Showing 3 of 10 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)3
01/14/2019123526185Open ↗
09/12/2012121156131Open ↗
07/10/2012121144396Open ↗
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER2
11/23/2010120536018Open ↗
10/18/2010120499683Open ↗
▸Energy Compliance10
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS4
07/31/2019123526185Open ↗
01/14/2019123526185Open ↗
09/04/2012121144396Open ↗
Showing 3 of 4 on file for this type
▸BISTECHNICAL REPORT: ENERGY3
10/24/2011120689790Open ↗
10/03/2011120787363Open ↗
06/14/2011120689790Open ↗
▸BISAS-BUILT ENERGY ANALYSIS2
07/31/2019123526185Open ↗
10/24/2011120689790Open ↗
▸BISELECTRICAL APPLICATION FOR SIDEWALK SHED LIGHTING1
10/07/2015140412211Open ↗
▸Inspections & Test Reports1
▸BISTECHNICAL REPORT: RESPONSIBILITY1
10/07/2015140412211Open ↗
▸Approvals, Objections & Sign-offs17
▸BISADMINISTRATIVE OBJECTIONS8
09/12/2012121156131Open ↗
07/10/2012121144396Open ↗
08/16/2011120787363Open ↗
Showing 3 of 8 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST7
07/31/2019123526185Open ↗
09/13/2016120536018Open ↗
01/12/2016140412211Open ↗
Showing 3 of 7 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION2
07/31/2019123526185Open ↗
05/17/2011120689790Open ↗
▸Cost, Insurance & Ownership17
▸BISCOST AFFIDAVIT17
07/31/2019123526185Open ↗
01/14/2019123526185Open ↗
09/13/2016120536018Open ↗
Showing 3 of 17 on file for this type
▸Filing & Intake Forms15
▸BISEFILING COVER SHEET9
01/14/2019123526185Open ↗
09/12/2012121156131Open ↗
07/10/2012121144396Open ↗
Showing 3 of 9 on file for this type
▸BISADDITIONAL INFORMATION4
07/23/2015120536018Open ↗
06/04/2014121156131Open ↗
01/09/2014120536018Open ↗
Showing 3 of 4 on file for this type
▸BISBOROUGH INTAKE FORM1
07/31/2019123526185Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET1
10/07/2015140412211Open ↗
▸Other Documents14
▸DOB NOWManufacturer's Specifications5
08/16/2026M01441525-I1Open ↗
08/13/2026M01056670-I1Open ↗
08/13/2026M01210898-P1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWCalculations5
08/16/2026M01441525-I1Open ↗
08/13/2026M01056670-I1Open ↗
08/13/2026M01210898-P2Open ↗
Showing 3 of 5 on file for this type
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION2
10/07/2015140412211Open ↗
10/20/2010120499683Open ↗
▸BISDepartment of Consumer Affairs (DCA) Form1
09/04/2012121144396Open ↗
▸DOB NOWPARTIAL DEMO: 10-DAY Notice1
08/13/2026M01027204-S1Open ↗