← Back
BuildNYC
Primarily 5-6 family with 1 store or office
245 MALCOM X BOULEVARD
BROOKLYN · BIN 3046201
💬 Discuss this project
1927Year Built
4Stories
S5Building Class
R6AZoning
10,560 sfGross Floor Area
6Units
Rent Stabilized91 Active Violations 79 unresolved · 12 paperwork only 3 likely answered ▸
Primarily 5-6 family with 1 store or office · Owner of record: Reid & Halsey Realty · 4,693 sf lot · 2.25 FAR built · Flood zone X
Locations of Work
ArchitecturePlumbing
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Floor 1Powder room and kitchen sink replacement4p · 1 filing · 5 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Reid & Halsey1403/21/2026
Reid & Halsey Realty803/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Ashraf205/23/2024
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Wise Electric SolutionsElectrical103/21/2026
Zone Plumbing & HeatingPlumbing107/08/2026
Building Lifecycle
All (67)Filed (2)Permit Issued (1)Violation (60)Inspection (3)Special Inspection (1)
02/10/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
02/07/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
02/07/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
12/30/2024
Permit issued — Plumbing
B01049997-S2-PL
08/16/2024
Violation issued (HPD, open)
A
08/16/2024
Violation issued (HPD, open)
A
08/16/2024
Violation issued (HPD, open)
A
08/16/2024
Violation issued (HPD, open)
A
08/16/2024
Violation issued (HPD, open)
A
08/16/2024
Violation issued (HPD, open)
A
08/16/2024
Violation issued (HPD, open)
A
08/16/2024
Violation issued (HPD, open)
C
08/16/2024
Violation issued (HPD, open)
A
08/16/2024
Violation issued (HPD, open)
C
08/16/2024
Violation issued (HPD, open)
A
08/16/2024
Violation issued (HPD, open)
C
08/16/2024
Violation issued (HPD, open)
A
08/16/2024
Violation issued (HPD, open)
B
05/23/2024
Filed — Alteration
1. REPLACE EXISTING WATER CLOSET,WASH BASIN IN POWDER ROOM.2. INSTALL NEW SINK .3. INSTALL NEW (01) FLOOR DRAIN IN 1ST FL 3.INSTALL 2-NEW 3-COMPART KITCHEN SINK WITH GREASE TRAP, 4. THIS JOB FILED TO WITHDRAW APPLICA# 340434654.5. ADDRESS ECB# 35179817P
B01049997-S2
05/23/2024
Filed — Alteration
1. REPLACE EXISTING WATER CLOSET,WASH BASIN IN POWDER ROOM.2. INSTALL NEW SINK .3. INSTALL NEW (01) FLOOR DRAIN IN 1ST FL 3.INSTALL 2-NEW 3-COMPART KITCHEN SINK WITH GREASE TRAP, 4. THIS JOB FILED TO WITHDRAW APPLICA# 340434654.5. ADDRESS ECB# 35179817P
B01049997-I1
05/13/2024
Special inspection requirement — Final
Eric Foster
06/30/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/20/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
03/03/2023
Violation issued (HPD, open)
C
02/24/2022
Violation issued (HPD, open)
A
02/24/2022
Violation issued (HPD, open)
A
02/24/2022
Violation issued (HPD, open)
A
02/24/2022
Violation issued (HPD, open)
A
02/24/2022
Violation issued (HPD, open)
A
02/24/2022
Violation issued (HPD, open)
A
02/24/2022
Violation issued (HPD, open)
B
10/15/2021
Violation issued (HPD, open)
B
10/15/2021
Violation issued (HPD, open)
A
10/15/2021
Violation issued (HPD, open)
A
10/15/2021
Violation issued (HPD, closed)
A
09/22/2021
Violation issued (HPD, open)
B
09/22/2021
Violation issued (HPD, open)
B
09/22/2021
Violation issued (HPD, open)
B
09/22/2021
Violation issued (HPD, open)
B
06/16/2021
Violation issued (ECB, closed)
Construction
06/06/2020
Violation issued (HPD, open)
B
06/06/2020
Violation issued (HPD, closed)
C
06/06/2020
Violation issued (HPD, open)
B
06/06/2020
Violation issued (HPD, open)
B
02/25/2019
Violation issued (ECB, closed)
Construction
02/25/2019
Violation issued (ECB, closed)
Construction
02/25/2019
Violation issued (ECB, closed)
Construction
02/25/2019
Violation issued (ECB, closed)
Construction
02/25/2019
Violation issued (ECB, closed)
Construction
02/25/2019
Violation issued (ECB, closed)
Construction
02/25/2019
Violation issued (ECB, closed)
Construction
02/25/2019
Violation issued (ECB, closed)
Construction
02/25/2019
Violation issued (ECB, closed)
Construction
02/25/2019
Violation issued (ECB, closed)
Construction
02/25/2019
Violation issued (ECB, closed)
Construction
12/17/2018
Violation issued (ECB, closed)
Construction
12/17/2018
Violation issued (ECB, closed)
Construction
12/15/2018
Violation issued (ECB, closed)
Construction
12/15/2018
Violation issued (ECB, open)
Construction
10/29/2018
Violation issued (ECB, closed)
Construction
Latest 60 of 67 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offZone Plumbing & Heating12/30/2024
BIS—ISSUEDUgb Construction12/27/2024
BISMHISSUEDUgb Construction11/17/2023
BIS—ISSUEDUgb Construction11/14/2023
BIS—ISSUEDUgb Construction12/20/2021
BISPLISSUEDCrown Plumbing04/25/2019
BISBLISSUEDCrown Plumbing01/17/2019
BISBLISSUEDTop Dog Plumbing & Heating05/31/2018
BISOTISSUEDUsman G. Bhutta03/07/2017
BISOTISSUEDUsman G. Bhutta03/07/2017
BISPLISSUEDTop Dog Plumbing & Heating12/07/2016
BISOTISSUEDUsman G. Bhutta11/02/2016
BISOTISSUEDUsman G. Bhutta09/23/2016
BISOTISSUEDJanan Construction08/31/2016
BIS—ISSUEDScampa Contracting07/21/2015
BISPLISSUEDTop Dog Plumbing & Heating12/04/2014
BISPLISSUEDTop Dog Plumbing & Heating05/03/2013
BIS—ISSUEDScampa Contracting03/26/2013
BIS—ISSUEDScampa Contracting01/24/2013
BISBLISSUEDRiser Plumbing & Heating09/23/2008
BIS—ISSUEDMB Cont04/18/2008
BISPLISSUEDRiser Plumbing & Heating04/02/2008
BIS—ISSUEDMB Cont08/28/2007
BIS—ISSUEDMB Cont09/12/2006
BISSPISSUEDRiser Plumbing & Heating06/21/2006
BISPLISSUEDResponse PL & Heating02/28/2006
BISEQISSUEDM.B. Contrcting04/15/2005
BISOTISSUED245 Meat05/14/1996
1 project · most recent 10/14/2019
General Wiring
FiledStatusContractorScope
10/14/2019CompleteWilldan Electrical of NYGeneral Wiring
▾Field Inspections (DOB CAP) — 3
DateTypeResultReport
02/10/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
02/07/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
02/07/2025Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 1
DateRequirementInspectorRole
05/13/2024FinalEric Fosterprogress
▾Documents — 107 on file (BIS + DOB NOW)
▸Plans & Drawings2
▸DOB NOWPlans/Sketch2
08/25/2026B01049997-S2Request digital key ↗
08/25/2026B01049997-I1Request digital key ↗
▸Applications & Permits40
▸BISPLAN / WORK APPROVAL APPLICATION24
10/23/2025300517821Open ↗
03/14/2024302044026Open ↗
02/26/2024302044026Open ↗
Showing 3 of 24 on file for this type
▸BISWORK PERMIT APPLICATION16
01/07/2025302044026Open ↗
04/11/2024340434854Open ↗
11/21/2023302044026Open ↗
Showing 3 of 16 on file for this type
▸Seals & Professional Certifications11
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION2
09/03/2008310137562Open ↗
05/05/2008310137562Open ↗
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION2
10/19/2016340434854Open ↗
08/09/2016340409908Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT2
10/19/2016340434854Open ↗
08/09/2016340409908Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY2
10/19/2016340434854Open ↗
08/09/2016340409908Open ↗
▸DOB NOWDPL-1: Design Professional Seal & Signature2
08/25/2026B01049997-S2Open ↗
08/25/2026B01049997-I1Open ↗
▸DOB NOWProgress Inspector Seal & Signature1
08/29/2026B01049997-I1Open ↗
▸Trade Schedules & Equipment11
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT7
03/01/2019310137562Open ↗
04/04/2018310137562Open ↗
07/25/2014310137562Open ↗
Showing 3 of 7 on file for this type
▸BISSCHEDULE B - PLUMBING3
02/26/2024302044026Open ↗
07/18/2017340434854Open ↗
10/19/2016340434854Open ↗
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE1
07/24/2017340434854Open ↗
▸Safety & Tenant Protection2
▸BISTENANT PROTECTION PLAN AND NOTES2
12/03/2021302044026Open ↗
10/19/2016340434854Open ↗
▸Environmental & Asbestos3
▸BISASBESTOS: CERTIFICATION (DEP ACP5)2
10/19/2016340434854Open ↗
08/09/2016340409908Open ↗
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER1
05/05/2008310137562Open ↗
▸Energy Compliance3
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS2
10/19/2016340434854Open ↗
08/09/2016340409908Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY1
10/19/2016340434854Open ↗
▸Inspections & Test Reports4
▸BISTECHNICAL REPORT: RESPONSIBILITY3
02/26/2025300517821Open ↗
01/15/2025300517821Open ↗
10/19/2016340434854Open ↗
▸BISINSPECTION REPORT - SUPPORTING DOCUMENTATION1
07/24/2019310137562Open ↗
▸Approvals, Objections & Sign-offs13
▸BISSUPERSEDING LETTER5
04/11/2024340434854Open ↗
04/29/2019340434854Open ↗
01/18/2019310137562Open ↗
Showing 3 of 5 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION3
10/23/2025300517821Open ↗
10/23/2025300517821Open ↗
10/23/2025300517821Open ↗
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST3
07/31/2019310137562Open ↗
07/24/2019310137562Open ↗
07/19/2019310137562Open ↗
▸BISADMINISTRATIVE OBJECTIONS1
05/05/2008310137562Open ↗
▸BISSCHEDULE A - OCCUPANCY / USE1
04/21/2021302044026Open ↗
▸Cost, Insurance & Ownership6
▸BISCOST AFFIDAVIT3
07/19/2019310137562Open ↗
10/19/2016340434854Open ↗
08/09/2016340409908Open ↗
▸BISCIVIL PENALTY AFFADAVIT/REQUEST3
12/07/2016340434854Open ↗
11/02/2016340434854Open ↗
08/30/2016340409908Open ↗
▸Filing & Intake Forms12
▸BISADDITIONAL INFORMATION5
03/14/2024302044026Open ↗
04/26/2021302044026Open ↗
07/27/2017340434854Open ↗
Showing 3 of 5 on file for this type
▸BISBOROUGH INTAKE FORM4
04/11/2024340434854Open ↗
07/31/2019310137562Open ↗
07/24/2019310137562Open ↗
Showing 3 of 4 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET2
10/19/2016340434854Open ↗
08/09/2016340409908Open ↗
▸BISEFILING COVER SHEET1
05/05/2008310137562Open ↗