← Back
BuildNYC
One family attached or semi-detached
245 REVERE AVENUE
BRONX · BIN 2080984
💬 Discuss this project
1955Year Built
2Stories
A5Building Class
R4-1Zoning
1,764 sfGross Floor Area
1Units
One family attached or semi-detached · 1,800 sf lot · 0.98 FAR built · Flood zone X
Locations of Work
StructuralElectricalGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
RoofResidential solar electric generation array installation10p · 1 filing · 8 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Albert Einstein College of Medicine110/04/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Momentum Solar109/28/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
MXV Sia9281109/28/2026
Building Lifecycle
09/28/2026
Filed — Alteration
Installation of solar panels, rooftop, grid tied, railed, 8 modules, 3.28 KW
X01466370-I1
09/28/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Mina Makar
09/28/2026
Special inspection requirement — Adhesive-Based Solar Pedestal Bonding Systems
Mina Makar
09/28/2026
Special inspection requirement — Post-installed Anchors
Mina Makar
09/28/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
Mina Makar
8 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Nothing on file for this building.
1 project · most recent 09/28/2026
FiledStatusContractorScope
09/28/2026Permit IssuedIsland Electric—
1 project · most recent 09/28/2026
FiledStatusContractorScope
09/28/2026———
▾Special Inspection Requirements (DOB NOW) — 7
DateRequirementInspectorRole
09/28/2026Fire-Resistant Penetrations and JointsMina Makarspecial
09/28/2026Adhesive-Based Solar Pedestal Bonding SystemsMina Makarspecial
09/28/2026Post-installed AnchorsMina Makarspecial
09/28/2026Structural Stability – Alterations of existing buildingsMina Makarspecial
09/28/2026Energy Code Compliance InspectionsMina Makarprogress
09/28/2026FinalMina Makarprogress
09/28/2026Air barrier - visual inspectionMina Makarenergy_progress
8 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account