Condo, cultural / medical / educational
Furman Hall
89 WEST 3 STREET · BIN 1086188
💬 Discuss this project
2002Year Built
10Stories
RABuilding Class
R7-2Zoning
141,811 sfGross Floor Area
2Units
LL97 CoveredRent Stabilized13 Open Violations ▸FISP: SAFE
Condo, cultural / medical / educational · 21,950 sf lot · 6.46 FAR built · Flood zone X
Locations of Work
ArchitectureMechanicalPlumbingFire Protection
Floor 161p · 1 filing · 20 docs
Floor 151p · 1 filing · 20 docs
Floor 14
Floor 13
Floor 12
Floor 11
Floor 10
Floor 9
Floor 8
Floor 7
Floor 63p · 1 filing · 20 docs
Floor 54p · 1 filing · 20 docs
Floor 49p · 1 filing · 19 docs
Floor 3
Floor 27p · 3 filings · 15 docs
Floor 12p · 1 filing · 6 docs
Cellar6p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
NEW YORK UNIVERSITY9007/08/2026
NYU2403/22/2026
NYU - LAW SCHOOL FOUNDATION803/21/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
YAO W GUO ARCHITECT, PC803/21/2026
CONVERSANO ASSOCIATES, INC.1803/21/2026
AE DESIGN SOLUTION403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
BROSNA CONSTRUCTION CORPOGeneral Contractor1107/08/2026
PJP INSTALLERS INCGeneral Contractor307/08/2026
RANALLO CONTRACTING INCGeneral Contractor207/08/2026
ANESIS SERVICES CORPFire Protection207/08/2026
HYDROKINETIC PLBG & HTG IPlumbing107/08/2026
THOMAS FAYFire Protection103/21/2026
HUDSON PLMBING & MCH, LLCPlumbing107/08/2026
CONDUCTOR ELECL SVCS INCElectrical103/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
FENAGH, INC6942406/17/2025
NICOLAS BARATTO ARCHITECT847107/19/2023
SKYLINE ENGINEERING, PLLC267605/30/2023
Building Lifecycle
All (149)Filed (15)Permit Issued (15)Signed Off (9)Facade (FISP) (9)Violation (60)Inspection (11)Special Inspection (30)
05/08/2026
Violation issued (HPD, open)
A
07/10/2025
Permit issued — Mechanical Systems
M01240342-S1-MS
07/10/2025
Permit issued — General Construction
M01240342-I1-GC
06/27/2025
Special inspection requirement — Interior lighting power
AILANTO DANIEL MINAWI
06/27/2025
Special inspection requirement — Mechanical Systems
AILANTO DANIEL MINAWI
06/27/2025
Special inspection requirement — Tenant Protection Plan Compliance
AILANTO DANIEL MINAWI
06/27/2025
Special inspection requirement — Final
AILANTO DANIEL MINAWI
06/27/2025
Special inspection requirement — Energy Code Compliance Inspections
AILANTO DANIEL MINAWI
06/27/2025
Special inspection requirement — HVAC-R and service water heating system controls
AILANTO DANIEL MINAWI
06/27/2025
Special inspection requirement — Maintenance information
AILANTO DANIEL MINAWI
06/27/2025
Special inspection requirement — Tenant Protection Plan Compliance
AILANTO DANIEL MINAWI
06/27/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
AILANTO DANIEL MINAWI
06/27/2025
Special inspection requirement — Final
AILANTO DANIEL MINAWI
06/27/2025
Special inspection requirement — Fire-Resistance Rated Construction
AILANTO DANIEL MINAWI
06/27/2025
Special inspection requirement — Energy Code Compliance Inspections
AILANTO DANIEL MINAWI
06/27/2025
Special inspection requirement — Lighting controls
AILANTO DANIEL MINAWI
06/26/2025
Filed — Alteration
Application filed for installation of partitions, door and related finishes with lighting as per plans. No change in use, egress, or occupancy
M01240342-P2
06/26/2025
Filed — Alteration
Application filed for installation of partitions, door and related finishes with lighting as per plans. No change in use, egress, or occupancy
M01240342-P1
06/25/2025
Permit issued — General Construction
M01233894-I1-GC
06/24/2025
Permit issued — Mechanical Systems
M01233894-S1-MS
06/23/2025
Special inspection requirement — Mechanical Systems
06/23/2025
Special inspection requirement — Energy Code Compliance Inspections
06/23/2025
Special inspection requirement — Tenant Protection Plan Compliance
06/23/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
06/23/2025
Special inspection requirement — Final
06/23/2025
Special inspection requirement — Maintenance information
06/23/2025
Special inspection requirement — Tenant Protection Plan Compliance
06/23/2025
Special inspection requirement — Fire-Resistance Rated Construction
06/23/2025
Special inspection requirement — HVAC-R and service water heating system controls
06/23/2025
Special inspection requirement — Final
06/23/2025
Special inspection requirement — Energy Code Compliance Inspections
06/17/2025
Filed — Alteration
Application filed for installation of partitions, door and related finishes with lighting as per plans. No change in use, egress, or occupancy
M01240342-I1
06/17/2025
Filed — Alteration
Application filed for installation of partitions, door and related finishes with lighting as per plans. No change in use, egress, or occupancy
M01240342-S1
06/16/2025
Filed — Alteration
APPLICATION FILED TO UPDATE EXISTING HVAC SYSTEMS TO MATCH UPDATED 4TH FLOOR ROOM LAYOUT. INSTALL NEW VAV BOX OF PHASE C SCOPE OF WORK FOR ADDED OFFICES.
M01233894-I1
06/16/2025
Filed — Alteration
APPLICATION FILED TO UPDATE EXISTING HVAC SYSTEMS TO MATCH UPDATED 4TH FLOOR ROOM LAYOUT. INSTALL NEW VAV BOX OF PHASE C SCOPE OF WORK FOR ADDED OFFICES.
M01233894-S1
06/13/2025
Violation issued (HPD, open)
A
06/06/2025
Special inspection requirement — Tenant Protection Plan Compliance
AILANTO DANIEL MINAWI
06/05/2025
Special inspection requirement — Maintenance information
AILANTO DANIEL MINAWI
06/05/2025
Special inspection requirement — HVAC-R and service water heating system controls
AILANTO DANIEL MINAWI
06/02/2025
Special inspection requirement — Final
AILANTO DANIEL MINAWI
06/02/2025
Special inspection requirement — Mechanical Systems
AILANTO DANIEL MINAWI
05/30/2025
Special inspection requirement — Interior lighting power
AILANTO DANIEL MINAWI
10/08/2024
Signed off — Alteration
modification to mechanical system new ductwork, pipe work & insulation, remove diffuser
M00697703-I1
06/23/2024
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
05/03/2024
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
04/16/2024
Violation issued (HPD, open)
A
03/26/2024
Signed off — Alteration
HEREWITH FILING FOR GENERAL CONSTRUCTION ON 5TH AND 6TH FLOOR AS PER PLANS HEREWHIT. NO CHANGE TO USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
M00875192-S2
03/01/2024
Signed off — Alteration
HEREWITH FILING FOR GENERAL CONSTRUCTION ON 5TH AND 6TH FLOOR AS PER PLANS HEREWHIT. NO CHANGE TO USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
M00875192-S1
02/29/2024
Signed off — Alteration
HEREWITH FILING FOR GENERAL CONSTRUCTION ON 5TH AND 6TH FLOOR AS PER PLANS HEREWHIT. NO CHANGE TO USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
M00875192-I1
02/20/2024
Cycle 9 facade report submitted
02/19/2024
Cycle 9 facade report signed — SAFE
02/17/2024
Cycle 9 facade inspection completed
02/05/2024
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
01/17/2024
Signed off — Alteration
HEREWITH FILING FOR GENERAL CONSTRUCTION AS PER PLANS BEING FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
M00901241-I1
01/04/2024
Signed off — Alteration
M00697743-I1
11/21/2023
Permit issued — General Construction
M00901241-I1-GC
10/05/2023
Signed off — Alteration
M00697733-I1
07/28/2023
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
07/24/2023
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
07/24/2023
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
Latest 60 of 149 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsPermit IssuedBROSNA CONSTRUCTION CORPO07/10/2025
DOB NOWGeneral ConstructionPermit IssuedBROSNA CONSTRUCTION CORPO07/10/2025
DOB NOWGeneral ConstructionPermit IssuedRANALLO CONTRACTING INC06/25/2025
DOB NOWMechanical SystemsPermit IssuedRANALLO CONTRACTING INC06/24/2025
DOB NOWGeneral ConstructionSigned-offBROSNA CONSTRUCTION CORPO11/21/2023
DOB NOWPlumbingSigned-offHYDROKINETIC PLBG & HTG I06/14/2023
DOB NOWPlumbingSigned-offTHOMAS FAY06/14/2023
DOB NOWGeneral ConstructionSigned-offBROSNA CONSTRUCTION CORPO06/11/2023
DOB NOWMechanical SystemsSigned-offBROSNA CONSTRUCTION CORPO06/10/2023
DOB NOWSprinklersSigned-offTHOMAS FAY06/21/2022
DOB NOWMechanical SystemsSigned-offBROSNA CONSTRUCTION CORPO05/27/2022
DOB NOWGeneral ConstructionSigned-offBROSNA CONSTRUCTION CORPO05/27/2022
DOB NOWPlumbingSigned-offHUDSON PLMBING & MCH, LLC05/27/2022
DOB NOWSupported ScaffoldSigned-offPJP INSTALLERS INC06/26/2018
DOB NOWSidewalk ShedSigned-offPJP INSTALLERS INC06/26/2018
BISSPISSUEDSKINNER PLMNG & HTG CORP12/27/2018
BISOTISSUEDPRIORITY NY INC12/21/2018
BISMHISSUEDPRIORITY NY INC12/21/2018
BISOTISSUEDA W R GROUP INC09/20/2018
BISSPISSUEDANESIS SERVICES CORP07/10/2018
BISOTISSUEDA W R GROUP INC05/30/2018
BISPLISSUEDACCURATE MECHANICAL INC05/21/2018
BISOTISSUEDBROSNA CONSTRUCTION CORPO05/04/2018
BISMHISSUEDBROSNA CONSTRUCTION CORPO05/04/2018
BISOTISSUEDBERN COMPANIES INC02/09/2016
BISOTISSUEDA W R GROUP INC07/02/2014
BISOTISSUEDA W R GROUP INC08/06/2013
BISOTISSUEDLRP CONSTRUCTION CORP07/12/2012
BIS—ISSUEDNY FLAG AND POLE CO., INC05/16/2011
BIS—ISSUEDNY FLAG AND POLE CO., INC05/11/2011
BISOTISSUEDUNITED PLBG MECH INC08/02/2010
BISOTISSUEDPALZA CONSTRUCTION CORPORATION04/16/2007
BISMHISSUEDPLAZA CONSTR. CORP.11/18/2003
BISMHISSUEDJ.T. FALK AND COMPANY10/03/2003
BISPLISSUEDNEW YORK STANDARD MECH CORP10/02/2003
BISSPISSUEDS&S FIRE SUPPRESSION SYSTEMS INC08/26/2003
BISPLISSUEDNEW YORK STANDARD MECH CORP08/06/2003
BISPLISSUEDPARAMOUNT PLBG CO INC08/04/2003
BISEQISSUEDUNITED HOISTING CORPORATION04/25/2003
BISEQISSUEDATLANTIC HEYDT CORP.04/11/2003
+ 25 more permits on file
1 project · most recent 06/16/2025
Others
FiledStatusContractorScopeMake / Model / Capacity
06/16/2025Permit IssuedRANALLO CONTRACTING INCOthers
Other
Anemostat EZTS 2,500 CFM · Vav Box ×20
11 projects · most recent 06/26/2025
General Wiring Boiler Controls Lighting
FiledStatusContractorScope
06/26/2025Permit IssuedCONDUCTOR ELECL SVCS INCGeneral Wiring
01/11/2024Permit IssuedCONDUCTOR ELECL SVCS INCGeneral Wiring
08/04/2023Permit IssuedOMD ELECTRICAL CORP1 meters, 1 new_meters
06/12/2023CompleteDENMAR ELECTRIC CORPGeneral Wiring
06/02/2022CompleteDENMAR ELECTRIC CORPGeneral Wiring
04/27/2022CompleteCONDUCTOR ELECL SVCS INCGeneral Wiring
12/17/2018CompleteSAFETECH ELECL CONTNG CORGeneral Wiring
12/05/2018CompleteCONDUCTOR ELECL SVCS INCGeneral Wiring
06/15/2018CompleteTOP SHELF ELECTRIC CORP—
06/06/2018CompleteRIGID ELECTRIC, INC.Boiler Controls
05/30/2018CompleteCONDUCTOR ELECL SVCS INCGeneral Wiring, Lighting
▾Field Inspections (DOB CAP) — 11
DateTypeResultReport
02/05/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
07/28/2023Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
07/24/2023Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
07/24/2023Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
07/18/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
09/12/2022Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
09/12/2022Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
09/09/2022Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
07/01/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
06/30/2022Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
06/30/2022Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 54
DateRequirementInspectorRole
06/27/2025Interior lighting powerAILANTO DANIEL MINAWIenergy_progress
06/27/2025Mechanical SystemsAILANTO DANIEL MINAWIspecial
06/27/2025Tenant Protection Plan ComplianceAILANTO DANIEL MINAWIspecial
06/27/2025FinalAILANTO DANIEL MINAWIprogress
06/27/2025Energy Code Compliance InspectionsAILANTO DANIEL MINAWIprogress
06/27/2025HVAC-R and service water heating system controlsAILANTO DANIEL MINAWIenergy_progress
06/27/2025Maintenance informationAILANTO DANIEL MINAWIenergy_progress
06/27/2025Tenant Protection Plan ComplianceAILANTO DANIEL MINAWIspecial
06/27/2025Fire-Resistant Penetrations and JointsAILANTO DANIEL MINAWIspecial
06/27/2025FinalAILANTO DANIEL MINAWIprogress
06/27/2025Fire-Resistance Rated ConstructionAILANTO DANIEL MINAWIprogress
06/27/2025Energy Code Compliance InspectionsAILANTO DANIEL MINAWIprogress
06/27/2025Lighting controlsAILANTO DANIEL MINAWIenergy_progress
06/23/2025Mechanical Systems—special
06/23/2025Energy Code Compliance Inspections—progress
06/23/2025Tenant Protection Plan Compliance—special
06/23/2025Fire-Resistant Penetrations and Joints—special
06/23/2025Final—progress
06/23/2025Maintenance information—energy_progress
06/23/2025Tenant Protection Plan Compliance—special
06/23/2025Fire-Resistance Rated Construction—progress
06/23/2025HVAC-R and service water heating system controls—energy_progress
06/23/2025Final—progress
06/23/2025Energy Code Compliance Inspections—progress
06/06/2025Tenant Protection Plan ComplianceAILANTO DANIEL MINAWIspecial
Latest 25 of 54.
▾Documents — 298 on file (BIS + DOB NOW)
▸Plans & Drawings15
▸DOB NOWPlans/Sketch15
09/06/2026M00054501-I1Request digital key ↗
09/06/2026M00054493-I1Request digital key ↗
09/02/2026M00697743-I1Request digital key ↗
Showing 3 of 15 on file for this type
▸Applications & Permits42
▸BISPLAN / WORK APPROVAL APPLICATION24
01/07/2019123386665Open ↗
01/02/2019123386665Open ↗
12/20/2018123592460Open ↗
Showing 3 of 24 on file for this type
▸BISWORK PERMIT APPLICATION18
12/28/2018123592460Open ↗
12/21/2018123592460Open ↗
12/21/2018123592460Open ↗
Showing 3 of 18 on file for this type
▸Seals & Professional Certifications112
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION34
05/20/2019123592460Open ↗
05/14/2019123386665Open ↗
04/12/2019123592460Open ↗
Showing 3 of 34 on file for this type
▸DOB NOWProgress Inspector Seal & Signature26
09/01/2026M00697703-I1Open ↗
08/30/2026M01240342-I1Open ↗
08/30/2026M01240342-I1Open ↗
Showing 3 of 26 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature17
09/01/2026M00697703-I1Open ↗
08/30/2026M01240342-I1Open ↗
08/30/2026M00901241-I1Open ↗
Showing 3 of 17 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature15
09/06/2026M00054501-I1Open ↗
09/06/2026M00054493-I1Open ↗
09/02/2026M00697743-I1Open ↗
Showing 3 of 15 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST9
12/20/2018123592460Open ↗
06/26/2018123602280Open ↗
03/23/2018123386665Open ↗
Showing 3 of 9 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT6
12/20/2018123592460Open ↗
12/20/2018123592460Open ↗
06/26/2018123602280Open ↗
Showing 3 of 6 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM5
08/06/2013121708385Open ↗
07/11/2012121135495Open ↗
05/06/2011120679649Open ↗
Showing 3 of 5 on file for this type
▸Trade Schedules & Equipment9
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE9
01/02/2019123386665Open ↗
12/20/2018123592460Open ↗
12/20/2018123386665Open ↗
Showing 3 of 9 on file for this type
▸Safety & Tenant Protection6
▸BISTenant Protection Plan and Notes5
12/21/2018123592460Open ↗
06/26/2018123602280Open ↗
04/09/2018123447243Open ↗
Showing 3 of 5 on file for this type
▸BISST-1: Street Tree Checklist1
01/29/2009110442940Open ↗
▸Environmental & Asbestos15
▸DOB NOWDEP ACP-5: Asbestos Assessment Report6
08/23/2026M01233894-S1Open ↗
08/23/2026M01233894-I1Open ↗
08/23/2026M01240342-I1Open ↗
Showing 3 of 6 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'4
05/06/2011120679649Open ↗
05/06/2011120678329Open ↗
05/05/2011120679630Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form3
09/02/2026M00697743-I1Open ↗
09/02/2026M00697703-I1Open ↗
09/02/2026M00697733-I1Open ↗
▸BISASBESTOS: CERTIFICATION (DEP ACP5)2
12/20/2018123592460Open ↗
08/06/2013121708385Open ↗
▸Energy Compliance18
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS12
05/20/2019123592460Open ↗
05/14/2019123386665Open ↗
12/20/2018123592460Open ↗
Showing 3 of 12 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS5
05/20/2019123592460Open ↗
05/14/2019123386665Open ↗
11/14/2018123447243Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWEN2: As Built Energy Analysis1
08/13/2026M00697743-I1Open ↗
▸Approvals, Objections & Sign-offs26
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter12
09/06/2026M00054501-I1Open ↗
09/06/2026M00054493-I1Open ↗
09/02/2026M00697743-I1Open ↗
Showing 3 of 12 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST9
05/20/2019123592460Open ↗
05/14/2019123602280Open ↗
05/14/2019123386665Open ↗
Showing 3 of 9 on file for this type
▸BISADMINISTRATIVE OBJECTIONS5
07/11/2012121135495Open ↗
05/06/2011120678329Open ↗
05/06/2011120679649Open ↗
Showing 3 of 5 on file for this type
▸Cost, Insurance & Ownership23
▸BISCOST AFFIDAVIT22
05/20/2019123592460Open ↗
05/14/2019123602280Open ↗
05/14/2019123386665Open ↗
Showing 3 of 22 on file for this type
▸BISDEPT OF FINANCE VERIFICATION1
12/20/2018123592460Open ↗
▸Filing & Intake Forms29
▸BISEFILING COVER SHEET15
12/20/2018123592460Open ↗
12/20/2018123592460Open ↗
06/26/2018123602280Open ↗
Showing 3 of 15 on file for this type
▸BISBOROUGH INTAKE FORM9
05/20/2019123592460Open ↗
05/14/2019123602280Open ↗
05/14/2019123386665Open ↗
Showing 3 of 9 on file for this type
▸BISADDITIONAL INFORMATION5
01/07/2019123386665Open ↗
01/02/2019123386665Open ↗
09/27/2018123602280Open ↗
Showing 3 of 5 on file for this type
▸Other Documents3
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION3
06/26/2018123602280Open ↗
05/06/2011120679649Open ↗
05/06/2011120678329Open ↗