| Owner | Filings | Most Recent |
|---|---|---|
| MADIGAN DEVELOPMENT | 193 | 09/30/2026 |
| METRO CONTRACTING NY | 7 | 03/22/2026 |
| VOLK INDUSTRIAL SERVICES CORP | 6 | 03/22/2026 |
| 245 WEST 55TH ST LLC | 1 | 03/22/2026 |
| URBAN D.C. INC | 1 | 03/22/2026 |
| DU-ART REALTY CORP. | 1 | 03/22/2026 |
| DUART | 3 | 03/21/2026 |
| Date | Price | Unit | Seller → Buyer | $/sf |
|---|---|---|---|---|
| 06/06/2023 | $28.5M | — | — → — | $449/sf building |
| Firm | Filings | Most Recent |
|---|---|---|
| HOWARD I SHAPIRO & ASSOCIATES | 11 | 08/25/2026 |
| ROBERT ETTINGER, P.E, P.C. | 11 | 06/29/2026 |
| ASHRAF CORP | 17 | 06/10/2026 |
| FOGARTY FINGER ARCHITECTURE PLLC | 5 | 03/25/2026 |
| DESIMONE CONSULTING ENGINEERING | 6 | 02/25/2026 |
| BLACK SHEEP ENGINEERING GROUP | 2 | 01/29/2026 |
| GEORGE J. XERAKIAS, PE | 1 | 05/19/2025 |
| CHUN ENGINEERING CONSULTANT PLLC | 3 | 05/16/2025 |
| ALBER CAMARGO | 2 | 03/19/2025 |
| KZ ENGINEERING, P.C | 1 | 12/17/2024 |
| ROGER DE ELECTRIC CO. | 8 | 03/02/2023 |
| ENTHINK ENGINEERS LLC | 1 | 11/20/2021 |
| AK ENGINEERING, PC | 3 | 05/13/2021 |
| BAILEYS ENGINEERING PC | 1 | 07/19/2018 |
| Representative | Filings | Most Recent |
|---|---|---|
| KD DESIGNS | 22 | 03/21/2026 |
| HIERARCH-E | 4 | 03/21/2026 |
| HOWARD I SHAPIRO ASSOCIATES | 14 | 03/21/2026 |
| EA DESIGN GROUP | 6 | 03/21/2026 |
| SYNERGY BUILDING CONSULTANTS | 1 | 03/21/2026 |
| AE DESIGN SOLUTION | 2 | 03/21/2026 |
| HS DESIGN STUDIO | 2 | 03/21/2026 |
| Firm | Trade | Roles | Most Recent |
|---|---|---|---|
| ARSENAL SCAFFOLD INC | General Contractor | 37 | 09/30/2026 |
| VOLK INDUSTRIAL SERVICES | General Contractor | 23 | 07/08/2026 |
| CM AND ASSOCIATES CONST | General Contractor | 21 | 07/19/2026 |
| G.N.T. MECHANICAL LLC | Fire Protection | 9 | 07/08/2026 |
| METRO CONTRACTING NY, INC. | General Contractor | 4 | 03/21/2026 |
| STRUCTURE-CON INC | General Contractor | 4 | 07/08/2026 |
| NEW J.D. GEN. CONSTR. INC | General Contractor | 3 | 03/21/2026 |
| G.N.T. MECHANICAL LLC | Plumbing | 3 | 07/08/2026 |
| EVEREST SCAFFOLDING INC | General Contractor | 3 | 07/08/2026 |
| NEW YORK STANDARD MECH CORP | Plumbing | 2 | 07/08/2026 |
| DICAPUA, JOHN | Electrical | 2 | 03/21/2026 |
| JOHN DICAPUA | Electrical | 2 | 03/21/2026 |
| ACCURATE MECHANICAL INC | Fire Protection | 2 | 07/08/2026 |
| ACCURATE MECHANICAL INC | Plumbing | 2 | 07/08/2026 |
| TOUGH STALLION LLC | Electrical | 1 | 03/21/2026 |
| BIRNBAUM, ALAN | Electrical | 1 | 03/21/2026 |
| SPIRO SINANIS | Electrical | 1 | 03/21/2026 |
| BUTT ASSOCIATES INC | General Contractor | 1 | 07/08/2026 |
| Agency | License # | Filings | Most Recent |
|---|---|---|---|
| DELTA TESTING LABS | 687 | 31 | 08/25/2026 |
| SALAMON ENGINEERING PLLC | 1264 | 2 | 03/01/2023 |
| RICHMOND TESTING LAB | 263 | 3 | 11/01/2022 |
| AK ENGINEERING PC | 678 | 3 | 05/13/2021 |
| Source | Work Type | Status | Applicant | Issued |
|---|---|---|---|---|
| DOB NOW | Protection and Mechanical Methods | Permit Issued | ARSENAL SCAFFOLD INC | 09/29/2026 |
| DOB NOW | Construction Fence | Permit Issued | ARSENAL SCAFFOLD INC | 09/01/2026 |
| DOB NOW | Protection and Mechanical Methods | Permit Issued | ARSENAL SCAFFOLD INC | 08/31/2026 |
| DOB NOW | Mechanical Systems | Permit Issued | CM AND ASSOCIATES CONST | 07/17/2026 |
| DOB NOW | Protection and Mechanical Methods | Permit Issued | ARSENAL SCAFFOLD INC | 06/16/2026 |
| DOB NOW | Supported Scaffold | Permit Issued | ARSENAL SCAFFOLD INC | 06/16/2026 |
| DOB NOW | Protection and Mechanical Methods | Permit Issued | ARSENAL SCAFFOLD INC | 06/16/2026 |
| DOB NOW | Construction Fence | Permit Issued | ARSENAL SCAFFOLD INC | 06/11/2026 |
| DOB NOW | Construction Fence | Permit Issued | ARSENAL SCAFFOLD INC | 06/11/2026 |
| DOB NOW | Sidewalk Shed | Signed-off | ARSENAL SCAFFOLD INC | 05/11/2026 |
| DOB NOW | Structural | Permit Issued | CM AND ASSOCIATES CONST | 04/15/2026 |
| DOB NOW | Protection and Mechanical Methods | Permit Issued | ARSENAL SCAFFOLD INC | 04/13/2026 |
| DOB NOW | Standpipe | Permit Issued | G.N.T. MECHANICAL LLC | 04/01/2026 |
| DOB NOW | Sidewalk Shed | Signed-off | ARSENAL SCAFFOLD INC | 03/18/2026 |
| DOB NOW | Support of Excavation | Permit Issued | CHRISTOPHER B. MESBAH | 02/17/2026 |
| DOB NOW | Protection and Mechanical Methods | Permit Issued | ARSENAL SCAFFOLD INC | 02/11/2026 |
| DOB NOW | Supported Scaffold | Permit Issued | ARSENAL SCAFFOLD INC | 02/10/2026 |
| DOB NOW | Protection and Mechanical Methods | Permit Issued | CHRISTOPHER B. MESBAH | 02/09/2026 |
| DOB NOW | Protection and Mechanical Methods | Permit Issued | ARSENAL SCAFFOLD INC | 01/29/2026 |
| DOB NOW | Foundation | Permit Issued | CHRISTOPHER B. MESBAH | 01/26/2026 |
| DOB NOW | Protection and Mechanical Methods | Permit Issued | VOLK INDUSTRIAL SERVICES | 01/15/2026 |
| DOB NOW | Sprinklers | Permit Issued | G.N.T. MECHANICAL LLC | 12/16/2025 |
| DOB NOW | Standpipe | Permit Issued | G.N.T. MECHANICAL LLC | 12/16/2025 |
| DOB NOW | Plumbing | Permit Issued | G.N.T. MECHANICAL LLC | 12/10/2025 |
| DOB NOW | Suspended Scaffold | Signed-off | RH EXPERT CORP | 12/05/2025 |
| DOB NOW | General Construction | Permit Issued | CHRISTOPHER B. MESBAH | 11/14/2025 |
| DOB NOW | Structural | Permit Issued | VOLK INDUSTRIAL SERVICES | 11/06/2025 |
| DOB NOW | Protection and Mechanical Methods | Permit Issued | ARSENAL SCAFFOLD INC | 10/23/2025 |
| DOB NOW | Protection and Mechanical Methods | Permit Issued | ARSENAL SCAFFOLD INC | 09/30/2025 |
| DOB NOW | Protection and Mechanical Methods | Permit Issued | ARSENAL SCAFFOLD INC | 06/30/2025 |
| DOB NOW | Protection and Mechanical Methods | Permit Issued | ARSENAL SCAFFOLD INC | 06/27/2025 |
| DOB NOW | Supported Scaffold | Permit Issued | ARSENAL SCAFFOLD INC | 06/27/2025 |
| DOB NOW | Suspended Scaffold | Signed-off | ELM SUSPENSION SYSTEMS | 06/11/2025 |
| DOB NOW | Sidewalk Shed | Signed-off | ARSENAL SCAFFOLD INC | 05/29/2025 |
| DOB NOW | Sidewalk Shed | Signed-off | ARSENAL SCAFFOLD INC | 05/28/2025 |
| DOB NOW | General Construction | Permit Issued | CHRISTOPHER B. MESBAH | 05/02/2025 |
| DOB NOW | Protection and Mechanical Methods | Permit Issued | ARSENAL SCAFFOLD INC | 04/21/2025 |
| DOB NOW | Structural | Permit Issued | CHRISTOPHER B. MESBAH | 04/18/2025 |
| DOB NOW | General Construction | Permit Issued | CHRISTOPHER B. MESBAH | 04/17/2025 |
| DOB NOW | Standpipe | Permit Issued | G.N.T. MECHANICAL LLC | 04/03/2025 |
| Filed | Status | Contractor | Scope | Make / Model / Capacity |
|---|---|---|---|---|
| 06/29/2026 | Permit Issued | VOLK INDUSTRIAL SERVICES | Others | Other N/A NA 111 BTU ×1 |
| 03/25/2026 | Permit Issued | CM AND ASSOCIATES CONST | Air Conditioning Systems, Heating and Air Conditioning Systems | Cooling Mitsubishi Electric PEFY-P12NMAU 12,000 BTU · Vrf Indoor ×1 PEFY-P12NMSU 12,000 BTU · Vrf Indoor ×1 PEFY-P15NMAU 15,000 BTU · Vrf Indoor ×1 PEFY-P18NMAU 18 BTU · Vrf Indoor ×1 PEFY-P18NMSU 18,000 BTU · Vrf Indoor ×1 PEFY-P24NKMU 24,000 BTU · Vrf Indoor ×1 PEFY-P24NMAU 24,000 BTU · Vrf Indoor ×1 PEFY-P24NMSU 24,000 BTU · Vrf Indoor ×1 PEFY-P30NMAU 30,000 BTU · Vrf Indoor ×1 PEFY-P36NMAU 36,000 BTU · Vrf Indoor ×1 PEFY-P48NMAU 48,000 BTU · Vrf Indoor ×1 Addison PROH210C2 2,600 CFM · Rooftop Unit ×1 Heat / Cool Mitsubishi Electric PURY-EP216TNU-A 14,850 CFM · Vrf Outdoor ×2 PUMY-HP48NKMU1 3,885 CFM · Vrf Outdoor ×1 PURY-EP120TNU-A 8,300 CFM · Vrf Outdoor ×1 PURY-EP144TNU-A 9,550 CFM · Vrf Outdoor ×1 PURY-EP240TNU-A 14,500 CFM · Vrf Outdoor ×1 PURY-EP96TNU-A 74,000 CFM · Vrf Outdoor ×1 |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 06/29/2026 | Permit Issued | G.N.T. MECHANICAL LLC | Sprinkler System |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 06/29/2026 | Permit Issued | G.N.T. MECHANICAL LLC | Water/Sanitary |
| 03/25/2026 | — | — | Gas, Storm, Water/Sanitary |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 03/31/2026 | Permit Issued | ITZ ELECTRIC CORP | — |
| 10/28/2025 | Permit Issued | METROPOLIS ELECTRIC CORP | General Wiring |
| 02/14/2025 | Permit Issued | METROPOLIS ELECTRIC CORP | — |
| 10/17/2024 | Permit Issued | NASH ELECTRIC SERVICES IN | — |
| 06/25/2024 | Permit Issued | NASH ELECTRIC SERVICES IN | — |
| 01/05/2024 | Permit Issued | INTER CONNECTION ELETRIC | — |
| 11/20/2021 | Complete | RICHARD NEU | — |
| 07/17/2018 | Complete | BOROWIDE ELECT'L CONTR'S | — |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 08/25/2026 | Permit Issued | VOLK INDUSTRIAL SERVICES | 6 scope_items |
| 03/25/2026 | Permit Issued | CM AND ASSOCIATES CONST | Steel, Concrete |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 06/10/2026 | Permit Issued | ARSENAL SCAFFOLD INC | Fence, Sidewalk Shed |
| 03/19/2025 | Permit Issued | ARSENAL SCAFFOLD INC | Scaffold |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 05/19/2025 | Signed-off | ELM SUSPENSION SYSTEMS | Suspended Scaffold (SC) |
| Date | Type | Result | Report |
|---|---|---|---|
| 07/27/2026 | Certified Sprinkler-SP-Fixtures-Finish | Certified | View ↗ |
| 07/16/2026 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 05/05/2026 | Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test | Certified | View ↗ |
| 04/08/2026 | No Access-Final PL - Up to 9 Requested Floors | No Access | View ↗ |
| 04/06/2026 | Certified Water and Sanitary-WS-Fixtures-Finish | Certified | View ↗ |
| 04/02/2026 | Certified Gas-Gas-Piping-Roughing | Certified | View ↗ |
| 08/14/2025 | Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test | Certified | View ↗ |
| 05/23/2024 | Certified StandPipe - SD - Hydrostatic 63/09 Test (Initial 75 Feet) | Certified | View ↗ |
| 11/27/2023 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 11/22/2023 | Certified Sprinkler-SP-Fixtures-Finish | Certified | View ↗ |
| 11/20/2023 | Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test | Certified | View ↗ |
| 06/02/2023 | Certified Water and Sanitary-WS-Fixtures-Finish | Certified | View ↗ |
| 08/08/2022 | Certified Storm Drainage-ST-Fixtures-Finish | Certified | View ↗ |
| 07/01/2022 | Certified Storm Drainage-ST-Piping-Underground | Certified | View ↗ |
| 07/20/2021 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| Date | Requirement | Inspector | Role |
|---|---|---|---|
| 08/18/2026 | Structural Stability – Alterations of existing buildings | RICHARD GREENWALD | special |
| 08/18/2026 | Construction Operations Influencing Adjacent Structures | RICHARD GREENWALD | special |
| 08/18/2026 | Demolition | RICHARD GREENWALD | special |
| 08/18/2026 | Final | Lawrence Shapiro | progress |
| 07/17/2026 | Demolition | RICHARD GREENWALD | special |
| 07/10/2026 | Demolition | RICHARD GREENWALD | special |
| 06/29/2026 | Fire-Resistant Penetrations and Joints | RICHARD GREENWALD | special |
| 06/29/2026 | Standpipe Systems | RICHARD GREENWALD | special |
| 06/24/2026 | Fire-Resistant Penetrations and Joints | RICHARD GREENWALD | special |
| 06/24/2026 | Standpipe Systems | RICHARD GREENWALD | special |
| 06/11/2026 | Ventilation and air distribution system | RICHARD GREENWALD | energy_progress |
| 06/11/2026 | Duct leakage testing, insulation and design | RICHARD GREENWALD | energy_progress |
| 06/11/2026 | Heating Systems | RICHARD GREENWALD | special |
| 06/10/2026 | Fire-Resistant Penetrations and Joints | RICHARD GREENWALD | special |
| 06/10/2026 | Standpipe Systems | RICHARD GREENWALD | special |
| 04/22/2026 | Structural Stability – Alterations of existing buildings | RICHARD GREENWALD | special |
| 04/22/2026 | Final | Lawrence Shapiro | progress |
| 04/22/2026 | Construction Operations Influencing Adjacent Structures | RICHARD GREENWALD | special |
| 04/22/2026 | Demolition | RICHARD GREENWALD | special |
| 03/10/2026 | Structural Steel - High Strength Bolting | RICHARD GREENWALD | special |
| 03/10/2026 | Structural Steel - Details | RICHARD GREENWALD | special |
| 03/10/2026 | Post-installed Anchors | RICHARD GREENWALD | special |
| 03/10/2026 | Masonry | RICHARD GREENWALD | special |
| 03/10/2026 | Final | RICHARD GREENWALD | progress |
| 03/10/2026 | Concrete - Cast-In-Place | RICHARD GREENWALD | special |