← Back
BuildNYC
Residential, converted (42 apartments per DOB filing)
245 WEST 55TH STREET
MANHATTAN · BIN 1024873
💬 Discuss this project
1914Year Built
11Stories
O3Building Class
C6-4Zoning
63,500 sfGross Floor Area
42Units
LL97 Covered1 Active Violation ▸FISP: SAFE
Residential, converted (42 apartments per DOB filing) · Owner of record: 245 West 55th St · 6,025 sf lot · 10.54 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingFire ProtectionFire AlarmEquipmentCivilGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
Whole building & multi-floor projects245 WEST 55TH St. LLCUnder Construction4 filings
RoofMadigan Development, LLCUnder Construction6p · 3 filings
Floor 12Madigan Development, LLCUnder Construction1 filing
Floor 11Madigan Development, LLCUnder Construction1 filing
Floor 10
Floor 9
Floor 8
Floor 7
Floor 6
Floor 5
Floor 4Needle beam installationUnder Construction1p · 1 filing
Floor 3Needle beam installationUnder Construction1 filing
Floor 2Duart Film LaboratoriesUnder Construction6p · 4 filings
Floor 1Duart Film LaboratoriesUnder Construction4 filings
CellarDuart Film LaboratoriesUnder Construction2 filings
Site & exteriorDuart Film LaboratoriesUnder Construction13 filings
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Madigan Development19710/13/2026
Duart Film Labs1903/21/2026
Duart303/21/2026
245 West 55th St103/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
06/06/2023$28.5M—— → —$449/sf building
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
KD Designs2203/21/2026
Hierarch-E403/21/2026
Howard I Shapiro Associates1403/21/2026
EA Design Group603/21/2026
Synergy Building Consultants103/21/2026
AE Design Solution203/21/2026
HS Design Studio203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Arsenal ScaffoldScaffold3709/30/2026
CM and Associates ConstructionGeneral Contractor1907/19/2026
Volk Industrial ServicesGeneral Contractor1507/08/2026
G.N.T. MechanicalFire Protection1010/09/2026
Volk Industrial ServicesScaffold806/27/2026
Metro Contracting NYScaffold403/21/2026
G.N.T. MechanicalPlumbing410/09/2026
Structure-ConGeneral Contractor407/08/2026
Caputek Electrical ServicesElectrical403/21/2026
Everest ScaffoldingScaffold307/08/2026
New J.D. Gen. ConstructionGeneral Contractor303/21/2026
New York Standard MechanicalPlumbing207/08/2026
CM and Associates ConstructionScaffold207/08/2026
Accurate MechanicalPlumbing207/08/2026
Accurate MechanicalFire Protection207/08/2026
Butt AssociatesGeneral Contractor107/08/2026
Metropolis ElectricElectrical103/21/2026
Judd ElectricElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Delta Testing Labs6873108/25/2026
Salamon Engineering1264203/01/2023
Richmond Testing Lab263311/01/2022
AK Engineering678305/13/2021
Building Lifecycle
All (300)Filed (73)Permit Issued (80)Signed Off (12)Facade (FISP) (14)Violation (54)Inspection (10)Objection (27)Special Inspection (30)
10/08/2026
Permit issued — Plumbing
M00940950-S6-PL
10/08/2026
Permit issued — Sprinklers
M00940950-S7-EW-SP
09/29/2026
Permit issued — Protection and Mechanical Methods
M01293816-I1-PMM
09/01/2026
Permit issued — Construction Fence
M01409573-I1-SH
08/31/2026
Permit issued — Protection and Mechanical Methods
M01127303-I1-PMM
08/25/2026
Filed — Alteration
PARTIAL DEMOLITION MEANS & METHODS AND TEMPORARY STABILIZATION AS PER PLANS FILED. ALT-CO & RELATED STRUCTURAL WORK FILED UNDER M00940950.
M00991268-P7
08/18/2026
Special inspection requirement — Final
Lawrence Shapiro
08/18/2026
Special inspection requirement — Demolition
RICHARD GREENWALD
08/18/2026
Special inspection requirement — Construction Operations Influencing Adjacent Structures
RICHARD GREENWALD
08/18/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
RICHARD GREENWALD
07/17/2026
Permit issued — Mechanical Systems
M00940950-S5-MS
07/17/2026
Special inspection requirement — Demolition
RICHARD GREENWALD
07/13/2026
Filed — Alteration
PARTIAL DEMOLITION MEANS & METHODS AND TEMPORARY STABILIZATION AS PER PLANS FILED. ALT-CO & RELATED STRUCTURAL WORK FILED UNDER M00940950.
M00991268-P6
07/10/2026
Special inspection requirement — Demolition
RICHARD GREENWALD
06/29/2026
Filed — Alteration
Filing herewith for Temporary Standpipe as per plans (Provided one Temporary Standpipe with compressor and one fire department Siamese connection.
M00956411-P4
06/29/2026
Special inspection requirement — Standpipe Systems
RICHARD GREENWALD
06/29/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
RICHARD GREENWALD
06/24/2026
Special inspection requirement — Standpipe Systems
RICHARD GREENWALD
06/24/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
RICHARD GREENWALD
06/18/2026
Filed — Alteration
Filing herewith for Temporary Standpipe as per plans (Provided one Temporary Standpipe with compressor and one fire department Siamese connection.
M00956411-P3
06/16/2026
Permit issued — Supported Scaffold
M01031800-I1-SF
06/16/2026
Permit issued — Protection and Mechanical Methods
M01083449-I1-PMM
06/16/2026
Permit issued — Protection and Mechanical Methods
M01044796-I1-PMM
06/11/2026
Signed off — Alteration
INSTALLATION OF TEMPORARY CONST. PLYWOOD FENCE AND HEAVY DUTY SIDEWALK SHED AS PER PLANS. SW SHED AND PLYWOOD FENCE SHALL COMPLY WITH CHAPTER #33 OF THE 2022 CODE. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
M01059787-I1
06/11/2026
Permit issued — Construction Fence
M01409573-I1-SH
06/11/2026
Permit issued — Construction Fence
M01409573-I1-FN
06/11/2026
Special inspection requirement — Ventilation and air distribution system
RICHARD GREENWALD
06/11/2026
Special inspection requirement — Heating Systems
RICHARD GREENWALD
06/11/2026
Special inspection requirement — Duct leakage testing, insulation and design
RICHARD GREENWALD
06/10/2026
Filed — Alteration
INSTALLATION OF TEMPORARY CONST. PLYWOOD FENCE AND HEAVY DUTY SIDEWALK SHED AS PER PLANS. SW SHED AND PLYWOOD FENCE SHALL COMPLY WITH CHAPTER #33 OF THE 2022 CODE. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
M01409573-I1
06/10/2026
Special inspection requirement — Standpipe Systems
RICHARD GREENWALD
06/10/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
RICHARD GREENWALD
05/18/2026
Signed off — Alteration
INSTALLATION OF TEMPORARY SUSPENDED SCAFFOLD EQUIPMENT.
M01225976-I1
05/18/2026
Objection raised — Other
05/12/2026
Objection resolved — Addressed
05/11/2026
Permit issued — Sidewalk Shed
M01059787-I1-FN
05/06/2026
Objection raised — Other
05/01/2026
Filed — Alteration
PARTIAL DEMOLITION MEANS & METHODS AND TEMPORARY STABILIZATION AS PER PLANS FILED. ALT-CO & RELATED STRUCTURAL WORK FILED UNDER M00940950.
M00991268-P5
04/29/2026
Objection resolved — Addressed
04/22/2026
Special inspection requirement — Final
Lawrence Shapiro
04/22/2026
Special inspection requirement — Construction Operations Influencing Adjacent Structures
RICHARD GREENWALD
04/22/2026
Special inspection requirement — Demolition
RICHARD GREENWALD
04/22/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
RICHARD GREENWALD
04/15/2026
Permit issued — Structural
M00940950-S4-ST
04/13/2026
Permit issued — Protection and Mechanical Methods
M01212822-I1-PMM
04/08/2026
Inspection — No Access-Final PL - Up to 9 Requested Floors
No Access
View inspection ↗
04/06/2026
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
04/03/2026
Violation issued (ECB, closed)
Unknown
04/03/2026
Violation issued (ECB, closed)
Unknown
04/01/2026
Permit issued — Standpipe
M00956411-S5-EW-SD
04/01/2026
Objection raised — Zoning
03/25/2026
Filed — Alteration CO
Modification to plumbing fixtures as per plans filed herewith.
M00940950-P6
03/18/2026
Permit issued — Sidewalk Shed
M01059787-I1-SH
03/10/2026
Special inspection requirement — Structural Steel - Details
RICHARD GREENWALD
03/10/2026
Special inspection requirement — Structural Steel - Welding
RICHARD GREENWALD
03/10/2026
Special inspection requirement — Structural Steel - High Strength Bolting
RICHARD GREENWALD
03/10/2026
Special inspection requirement — Post-installed Anchors
RICHARD GREENWALD
03/10/2026
Special inspection requirement — Masonry
RICHARD GREENWALD
03/10/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
RICHARD GREENWALD
03/10/2026
Special inspection requirement — Concrete - Cast-In-Place
RICHARD GREENWALD
Latest 60 of 300 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingPermit IssuedG.N.T. Mechanical10/08/2026
DOB NOWSprinklersPermit IssuedG.N.T. Mechanical10/08/2026
DOB NOWProtection and Mechanical MethodsPermit IssuedArsenal Scaffold09/29/2026
DOB NOWConstruction FencePermit IssuedArsenal Scaffold09/01/2026
DOB NOWProtection and Mechanical MethodsPermit IssuedArsenal Scaffold08/31/2026
DOB NOWMechanical SystemsPermit IssuedCM and Associates Construction07/17/2026
DOB NOWSupported ScaffoldPermit IssuedArsenal Scaffold06/16/2026
DOB NOWProtection and Mechanical MethodsPermit IssuedArsenal Scaffold06/16/2026
DOB NOWProtection and Mechanical MethodsPermit IssuedArsenal Scaffold06/16/2026
DOB NOWConstruction FencePermit IssuedArsenal Scaffold06/11/2026
DOB NOWConstruction FencePermit IssuedArsenal Scaffold06/11/2026
DOB NOWSidewalk ShedSigned-offArsenal Scaffold05/11/2026
DOB NOWStructuralPermit IssuedCM and Associates Construction04/15/2026
DOB NOWProtection and Mechanical MethodsPermit IssuedArsenal Scaffold04/13/2026
DOB NOWStandpipePermit IssuedG.N.T. Mechanical04/01/2026
DOB NOWSidewalk ShedSigned-offArsenal Scaffold03/18/2026
DOB NOWSupport of ExcavationPermit IssuedChristopher B. Mesbah02/17/2026
DOB NOWProtection and Mechanical MethodsPermit IssuedArsenal Scaffold02/11/2026
DOB NOWSupported ScaffoldPermit IssuedArsenal Scaffold02/10/2026
DOB NOWProtection and Mechanical MethodsPermit IssuedChristopher B. Mesbah02/09/2026
DOB NOWProtection and Mechanical MethodsPermit IssuedArsenal Scaffold01/29/2026
DOB NOWFoundationPermit IssuedChristopher B. Mesbah01/26/2026
DOB NOWProtection and Mechanical MethodsPermit IssuedVolk Industrial Services01/15/2026
DOB NOWSprinklersPermit IssuedG.N.T. Mechanical12/16/2025
DOB NOWStandpipePermit IssuedG.N.T. Mechanical12/16/2025
DOB NOWPlumbingPermit IssuedG.N.T. Mechanical12/10/2025
DOB NOWSuspended ScaffoldSigned-offRH Expert12/05/2025
DOB NOWGeneral ConstructionPermit IssuedChristopher B. Mesbah11/14/2025
DOB NOWStructuralPermit IssuedVolk Industrial Services11/06/2025
DOB NOWProtection and Mechanical MethodsPermit IssuedArsenal Scaffold10/23/2025
DOB NOWProtection and Mechanical MethodsPermit IssuedArsenal Scaffold09/30/2025
DOB NOWProtection and Mechanical MethodsPermit IssuedArsenal Scaffold06/30/2025
DOB NOWProtection and Mechanical MethodsPermit IssuedArsenal Scaffold06/27/2025
DOB NOWSupported ScaffoldPermit IssuedArsenal Scaffold06/27/2025
DOB NOWSuspended ScaffoldSigned-offElm Suspension Systems06/11/2025
DOB NOWSidewalk ShedSigned-offArsenal Scaffold05/29/2025
DOB NOWSidewalk ShedSigned-offArsenal Scaffold05/28/2025
DOB NOWGeneral ConstructionPermit IssuedChristopher B. Mesbah05/02/2025
DOB NOWProtection and Mechanical MethodsPermit IssuedArsenal Scaffold04/21/2025
DOB NOWStructuralPermit IssuedChristopher B. Mesbah04/18/2025
+ 33 more permits on file
2 projects · most recent 06/29/2026
Others Air Conditioning Systems Heating and Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
06/29/2026Permit IssuedVolk Industrial ServicesOthers
Other
N/A NA 111 BTU ×1
03/25/2026Permit IssuedCM and Associates ConstructionAir Conditioning Systems, Heating and Air Conditioning Systems
Cooling
Mitsubishi Electric PEFY-P12NMAU 12,000 BTU · Vrf Indoor ×1
PEFY-P12NMSU 12,000 BTU · Vrf Indoor ×1
PEFY-P15NMAU 15,000 BTU · Vrf Indoor ×1
PEFY-P18NMAU 18 BTU · Vrf Indoor ×1
PEFY-P18NMSU 18,000 BTU · Vrf Indoor ×1
PEFY-P24NKMU 24,000 BTU · Vrf Indoor ×1
PEFY-P24NMAU 24,000 BTU · Vrf Indoor ×1
PEFY-P24NMSU 24,000 BTU · Vrf Indoor ×1
PEFY-P30NMAU 30,000 BTU · Vrf Indoor ×1
PEFY-P36NMAU 36,000 BTU · Vrf Indoor ×1
PEFY-P48NMAU 48,000 BTU · Vrf Indoor ×1
Addison PROH210C2 2,600 CFM · Rooftop Unit ×1
Heat / Cool
Mitsubishi Electric PURY-EP216TNU-A 14,850 CFM · Vrf Outdoor ×2
PUMY-HP48NKMU1 3,885 CFM · Vrf Outdoor ×1
PURY-EP120TNU-A 8,300 CFM · Vrf Outdoor ×1
PURY-EP144TNU-A 9,550 CFM · Vrf Outdoor ×1
PURY-EP240TNU-A 14,500 CFM · Vrf Outdoor ×1
PURY-EP96TNU-A 74,000 CFM · Vrf Outdoor ×1
1 project · most recent 06/29/2026
Sprinkler System
FiledStatusContractorScope
06/29/2026Permit IssuedG.N.T. MechanicalSprinkler System
2 projects · most recent 06/29/2026
Water/Sanitary Gas Storm
FiledStatusContractorScope
06/29/2026Permit IssuedG.N.T. MechanicalWater/Sanitary
03/25/2026Permit IssuedG.N.T. MechanicalGas, Storm, Water/Sanitary
8 projects · most recent 03/31/2026
General Wiring
FiledStatusContractorScope
03/31/2026Permit IssuedItz Electric—
10/28/2025Permit IssuedMetropolis ElectricGeneral Wiring
02/14/2025Permit IssuedMetropolis Electric—
10/17/2024Permit IssuedNash Electric Services—
06/25/2024Permit IssuedNash Electric Services—
01/05/2024Permit IssuedInter Connection Eletric—
11/20/2021CompleteRichard Neu—
07/17/2018CompleteBorowide Elect'l Contractors—
2 projects · most recent 08/25/2026
Steel Concrete
FiledStatusContractorScope
08/25/2026Permit IssuedVolk Industrial Services6 scope_items
03/25/2026Permit IssuedG.N.T. MechanicalSteel, Concrete
1 project · most recent 05/19/2025
Suspended Scaffold (SC)
FiledStatusContractorScope
05/19/2025Signed-offElm Suspension SystemsSuspended Scaffold (SC)
▾Field Inspections (DOB CAP) — 10
DateTypeResultReport
04/08/2026No Access-Final PL - Up to 9 Requested FloorsNo AccessView ↗
04/06/2026Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
05/23/2024Certified StandPipe - SD - Hydrostatic 63/09 Test (Initial 75 Feet)CertifiedView ↗
11/27/2023Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
11/22/2023Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
11/20/2023Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
06/02/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
08/08/2022Certified Storm Drainage-ST-Fixtures-FinishCertifiedView ↗
07/01/2022Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
07/20/2021Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 141
DateRequirementInspectorRole
08/18/2026FinalLawrence Shapiroprogress
08/18/2026Construction Operations Influencing Adjacent StructuresRICHARD GREENWALDspecial
08/18/2026DemolitionRICHARD GREENWALDspecial
08/18/2026Structural Stability – Alterations of existing buildingsRICHARD GREENWALDspecial
07/17/2026DemolitionRICHARD GREENWALDspecial
07/10/2026DemolitionRICHARD GREENWALDspecial
06/29/2026Fire-Resistant Penetrations and JointsRICHARD GREENWALDspecial
06/29/2026Standpipe SystemsRICHARD GREENWALDspecial
06/24/2026Fire-Resistant Penetrations and JointsRICHARD GREENWALDspecial
06/24/2026Standpipe SystemsRICHARD GREENWALDspecial
06/11/2026Ventilation and air distribution systemRICHARD GREENWALDenergy_progress
06/11/2026Duct leakage testing, insulation and designRICHARD GREENWALDenergy_progress
06/11/2026Heating SystemsRICHARD GREENWALDspecial
06/10/2026Fire-Resistant Penetrations and JointsRICHARD GREENWALDspecial
06/10/2026Standpipe SystemsRICHARD GREENWALDspecial
04/22/2026DemolitionRICHARD GREENWALDspecial
04/22/2026Structural Stability – Alterations of existing buildingsRICHARD GREENWALDspecial
04/22/2026FinalLawrence Shapiroprogress
04/22/2026Construction Operations Influencing Adjacent StructuresRICHARD GREENWALDspecial
03/10/2026Structural Steel - DetailsRICHARD GREENWALDspecial
03/10/2026MasonryRICHARD GREENWALDspecial
03/10/2026Structural Stability – Alterations of existing buildingsRICHARD GREENWALDspecial
03/10/2026Structural Steel - WeldingRICHARD GREENWALDspecial
03/10/2026Post-installed AnchorsRICHARD GREENWALDspecial
03/10/2026Structural Steel - High Strength BoltingRICHARD GREENWALDspecial
Latest 25 of 141.
▾Tenants in the building
TenantSpaceFloorsRenovation projects
Duart Film LaboratoriesArts / Culture / EntertainmentCellar, Floors 1, 2
Project M00623293 Alteration · LOC Issued · 02/01/2022
Project M00605481 Alteration · LOC Issued · 11/16/2021
Project M00596742 Alteration · LOC Issued · 11/02/2021
Project M00489754 Alteration · LOC Issued · 05/13/2021
Project M00485013 Alteration · LOC Issued · 05/07/2021
Project M00062132 Alteration · LOC Issued · 07/19/2018
Names are taken automatically from the text of each project’s filed documents (title blocks and cover sheets) and screened to exclude owners, landlords and designers. They may be incomplete or wrong; check the filing.
▾Documents — 440 on file (BIS + DOB NOW)
▸Plans & Drawings75
▸DOB NOWPlans/Sketch75
09/06/2026M00062132-I1Request digital key ↗
09/03/2026M00489774-I1Request digital key ↗
09/03/2026M00485013-I1Request digital key ↗
Showing 3 of 75 on file for this type
▸Applications & Permits20
▸BISWORK PERMIT APPLICATION9
04/01/2021123749916Open ↗
03/11/2020140889288Open ↗
03/10/2020140889288Open ↗
Showing 3 of 9 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION8
03/10/2020140889288Open ↗
06/19/2019123749916Open ↗
06/19/2019123749916Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWDEP Stormwater Construction Permit3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸Zoning, Tax Lot & Property Records7
▸DOB NOWZD1: DOB Zoning Diagram4
08/26/2026M00940950-P6Open ↗
Showing 1 of 4 on file for this type
▸DOB NOWZoning Exhibit form (1-5)3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸Seals & Professional Certifications224
▸DOB NOWSpecial Inspector Seal & Signature78
09/27/2026M00940950-P1Open ↗
09/27/2026M00940950-P1Open ↗
09/23/2026M00991268-P7Open ↗
Showing 3 of 78 on file for this type
▸DOB NOWProgress Inspector Seal & Signature64
09/27/2026M00940950-P1Open ↗
09/27/2026M00940950-P1Open ↗
09/23/2026M00991268-P7Open ↗
Showing 3 of 64 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature62
09/06/2026M00062132-I1Open ↗
09/03/2026M00489774-I1Open ↗
09/03/2026M00485013-I1Open ↗
Showing 3 of 62 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION8
06/19/2019123749916Open ↗
06/19/2019123749916Open ↗
06/19/2019123749916Open ↗
Showing 3 of 8 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT3
03/10/2020140889288Open ↗
06/19/2019123749916Open ↗
04/09/2013140068799Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST3
06/19/2019123749916Open ↗
07/18/2008110285129Open ↗
06/10/2008110184586Open ↗
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION2
03/10/2020140889288Open ↗
04/09/2013140068799Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY2
03/10/2020140889288Open ↗
04/09/2013140068799Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM2
07/18/2008110285129Open ↗
06/10/2008110184586Open ↗
▸Trade Schedules & Equipment10
▸DOB NOWFDNY: Letter of No Objection5
08/27/2026M00956411-P1Open ↗
08/27/2026M00956411-S3Open ↗
Showing 2 of 5 on file for this type
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE2
06/19/2019123749916Open ↗
06/19/2019123749916Open ↗
▸Safety & Tenant Protection4
▸DOB NOWStreet Tree Checklist3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Environmental & Asbestos19
▸DOB NOWDEP ACP-5: Asbestos Assessment Report11
09/03/2026M00489774-I1Open ↗
09/03/2026M00485013-I1Open ↗
09/03/2026M00596742-I1Open ↗
Showing 3 of 11 on file for this type
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form4
08/26/2026M00940950-S5Open ↗
Showing 1 of 4 on file for this type
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER2
07/18/2008110285129Open ↗
06/10/2008110184586Open ↗
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
03/10/2020140889288Open ↗
▸BISDEP ASBESTOS PROJECT COMPLETION FORM1
06/19/2019123749916Open ↗
▸Energy Compliance9
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS2
06/19/2019123749916Open ↗
06/19/2019123749916Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY2
10/05/2021123749916Open ↗
03/10/2020140889288Open ↗
▸DOB NOWEN2: As Built Energy Analysis.2
09/03/2026M00485013-I1Open ↗
Showing 1 of 2 on file for this type
▸BISELECTRICAL APPLICATION FOR SIDEWALK SHED LIGHTING1
04/09/2013140068799Open ↗
▸BISAS-BUILT ENERGY ANALYSIS1
10/05/2021123749916Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS1
03/10/2020140889288Open ↗
▸Inspections & Test Reports9
▸BISTECHNICAL REPORT: RESPONSIBILITY6
10/05/2021123749916Open ↗
10/05/2021123749916Open ↗
09/30/2021123749916Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWSOIL REPORT2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸DOB NOWTR4 Test Report and Plot Diagram1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Approvals, Objections & Sign-offs19
▸DOB NOWDEP Variance (V5) letter12
08/26/2026M00940950-S5Open ↗
Showing 1 of 12 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST3
10/05/2021123749916Open ↗
06/19/2013140068799Open ↗
06/28/2013140068799Open ↗
▸BISLETTERS - SUPPORTING DOCUMENTATION2
06/28/2013140068799Open ↗
06/19/2013140068799Open ↗
▸BISADMINISTRATIVE OBJECTIONS2
07/18/2008110285129Open ↗
06/10/2008110184586Open ↗
▸Cost, Insurance & Ownership6
▸BISCOST AFFIDAVIT6
10/05/2021123749916Open ↗
10/05/2021123749916Open ↗
03/10/2020140889288Open ↗
Showing 3 of 6 on file for this type
▸Filing & Intake Forms13
▸BISEFILING COVER SHEET5
06/19/2019123749916Open ↗
06/19/2019123749916Open ↗
06/19/2019123749916Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWAI1 Form4
08/26/2026M00991268-P7Open ↗
Showing 1 of 4 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET3
03/10/2020140889288Open ↗
04/09/2013140068799Open ↗
06/10/2008110184586Open ↗
▸BISADDITIONAL INFORMATION1
04/17/2009110285129Open ↗
▸Other Documents25
▸DOB NOWPlot Diagram9
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 9 on file for this type
▸DOB NOWSite Survey: Initial3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸DOB NOWProperty Ownership Certification3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸DOB NOWCalculations2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸DOB NOWManufacturer's Specifications2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸DOB NOWPARTIAL DEMO: 10-DAY Notice2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸DOB NOWAdjoining Owners Notification1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type