← Back
Elevator apt, semi-fireproof without stores
245 WEST 75 STREET
MANHATTAN · BIN 1030836
💬 Discuss this project
1920Year Built
6Stories
D1Building Class
R8BZoning
24,840 sfGross Floor Area
48Units
Rent Stabilized8 Open Violations 7 unresolved · 1 paperwork only ▸
Elevator apt, semi-fireproof without stores · Owner of record: JPS 020 REALTY LLC. · 5,950 sf lot · 4.17 FAR built · Flood zone X
Locations of Work
Plumbing
Floor 63p · 1 filing · 11 docs
Floor 53p · 1 filing · 11 docs
Floor 43p · 1 filing · 11 docs
Floor 33p · 1 filing · 11 docs
Floor 23p · 1 filing · 11 docs
Floor 13p · 1 filing · 11 docs
Cellar4p · 2 filings · 15 docs
Basement1p · 1 filing · 11 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
COAST GROUP607/08/2026
J.P.S. 020 REALTY LLC203/22/2026
JPS 020 REALTY LLC DITMAS203/22/2026
JPS OZO REALTY LLC203/22/2026
OWNER OF 245 WEST 75 ST103/22/2026
THE OWNER OF103/22/2026
OWNER OF JPS REALTY COMPA103/22/2026
MSS CONSTRUCTION CORP.103/21/2026
SUPER VENUS CONSTRUCTION103/21/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
NEW YORK ENGINEERING503/21/2026
SANDEEP KAUR103/21/2026
PEROTTO GROUP403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
COAST GROUP CORPGeneral Contractor307/08/2026
ADVANCED PLUMBING MECHPlumbing207/08/2026
PAT SEMENTA P & H CO INCPlumbing207/08/2026
HAZRAT ALLYElectrical103/21/2026
JEFFREY SOLOMONElectrical103/21/2026
MILLER, JR, CLINTONElectrical103/21/2026
ALLY HAZRATElectrical103/21/2026
SYED-NAQVI, ALTAFElectrical103/21/2026
NY CITY PLUMBER CORPPlumbing107/08/2026
SYED-NAQVI ALTAFElectrical103/21/2026
ANTHONY LOGOZZOElectrical103/21/2026
EDWARDS, AElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
NEW YORK ENGINEERING ASSO851506/06/2023
MOORE ASSOCIATES, LLC3408112/14/2021
GREGORY V. PEROTTO, P.E.947111/19/2019
Building Lifecycle
All (95)Filed (9)Permit Issued (8)Signed Off (3)Violation (50)Inspection (3)Objection (2)Special Inspection (20)
05/17/2026
Violation issued (HPD, closed)
C
08/05/2025
Signed off — Alteration
INSTALLATION OF ROOF PROTECTION AS PER PLANS. NO CHANGE IN USE OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
M01045038-I1
06/02/2025
Permit issued — Plumbing
M00618910-I1-PL
04/30/2025
Permit issued — Protection and Mechanical Methods
M01045038-I1-PMM
05/02/2024
Filed — Alteration
INSTALLATION OF ROOF PROTECTION AS PER PLANS. NO CHANGE IN USE OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
M01045038-I1
05/02/2024
Permit issued — Protection and Mechanical Methods
M01045038-I1-PMM
03/29/2024
Signed off — Alteration
INSTALL NEW GAS SERVICE, METER AND PIPING.
M00831280-I1
03/29/2024
Signed off — Alteration
REPLACE BOILER AND OIL BURNER WITH BOILER AND GAS/OIL BURNER. CHANGE GRADE OF FUEL FROM #4 TO #2 OIL.
M00831318-I1
07/25/2023
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
07/10/2023
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
06/27/2023
Inspection — Pass-Final Boiler Equipment Inspection
Pass
View inspection ↗
06/08/2023
Objection resolved — Addressed
06/07/2023
Objection raised — Scope
06/06/2023
Filed — Alteration
INSTALL NEW GAS SERVICE, METER AND PIPING.
M00831280-P1
05/18/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
LOUIS ARENA
05/18/2023
Special inspection requirement — Tenant Protection Plan Compliance
05/18/2023
Special inspection requirement — Energy Code Compliance Inspections
LOUIS ARENA
04/11/2023
Permit issued — Plumbing
M00831280-I1-PL
03/27/2023
Permit issued — Boiler Equipment
M00831318-I1-BE
02/24/2023
Filed — Alteration
INSTALL NEW GAS SERVICE, METER AND PIPING.
M00831280-I1
02/24/2023
Filed — Alteration
REPLACE BOILER AND OIL BURNER WITH BOILER AND GAS/OIL BURNER. CHANGE GRADE OF FUEL FROM #4 TO #2 OIL.
M00831318-I1
02/22/2023
Special inspection requirement — HVAC-R and service water heating equipment
LOUIS ARENA
02/22/2023
Special inspection requirement — Maintenance information
LOUIS ARENA
02/22/2023
Special inspection requirement — HVAC-R and service water piping design and insulation
LOUIS ARENA
02/22/2023
Special inspection requirement — HVAC-R and service water heating system controls
LOUIS ARENA
02/21/2023
Special inspection requirement — Tenant Protection Plan Compliance
LOUIS ARENA
02/17/2023
Special inspection requirement — Fuel-Oil Storage and Fuel-Oil Piping Systems
LOUIS ARENA
02/17/2023
Special inspection requirement — Heating Systems
LOUIS ARENA
02/06/2023
Filed — Alteration
M08038386-I1
02/06/2023
Filed — Alteration
M08038286-I1
01/19/2023
Violation issued (ECB, closed)
Construction
11/18/2022
Special inspection requirement — Tenant Protection Plan Compliance
LOUIS ARENA
11/15/2022
Special inspection requirement — HVAC-R and service water piping design and insulation
LOUIS ARENA
11/15/2022
Special inspection requirement — Maintenance information
LOUIS ARENA
11/15/2022
Special inspection requirement — HVAC-R and service water heating system controls
LOUIS ARENA
11/15/2022
Special inspection requirement — HVAC-R and service water heating equipment
LOUIS ARENA
11/10/2022
Special inspection requirement — Fuel-Oil Storage and Fuel-Oil Piping Systems
LOUIS ARENA
11/10/2022
Special inspection requirement — Heating Systems
LOUIS ARENA
10/27/2022
Violation issued (HPD, closed)
B
10/27/2022
Violation issued (HPD, closed)
A
10/27/2022
Violation issued (HPD, closed)
B
07/28/2022
Permit issued — Plumbing
M00618910-I1-PL
02/20/2022
Violation issued (HPD, closed)
B
02/20/2022
Violation issued (HPD, closed)
A
02/20/2022
Violation issued (HPD, closed)
C
02/20/2022
Violation issued (HPD, closed)
B
02/20/2022
Violation issued (HPD, closed)
B
12/14/2021
Filed — Alteration
INSTALL WASHER/DRYER MACHINES FOR BUILDING TENANT'S ACCESSORY USE AT CELLAR . WORK INCLUDES PLUMBING PIPING, SPRINKLER HEADS OFF DOMESTIC ,AND DRYER EXHAUST VENTING. ALL AS PER PLAN. NO CHANGE IN EGRESS, USE OR OCCUPANCY.
M00618910-I1
06/16/2020
Violation issued (HPD, closed)
B
03/02/2020
Violation issued (HPD, open)
B
03/02/2020
Violation issued (HPD, open)
C
02/27/2020
Permit issued — Plumbing
M00265155-S1-PL
02/26/2020
Filed — Alteration
FILING TO OBTAIN GAS AUTHORIZATION. REPLACE GAS PIPING TO EXISTING GAS STOVES AND DRYERS FROM EXISTING GAS METER. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M00265155-S1
12/11/2019
Violation issued (HPD, open)
B
12/11/2019
Violation issued (HPD, closed)
A
12/11/2019
Violation issued (HPD, open)
B
12/11/2019
Violation issued (HPD, open)
A
11/19/2019
Filed — Alteration
FILING TO OBTAIN GAS AUTHORIZATION. REPLACE GAS PIPING TO EXISTING GAS STOVES AND DRYERS FROM EXISTING GAS METER. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M00265155-I1
11/19/2019
Permit issued — Plumbing
M00265155-I1-PL
11/19/2019
Violation issued (ECB, open)
Construction
Latest 60 of 95 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingPermit IssuedADVANCED PLUMBING MECH06/02/2025
DOB NOWProtection and Mechanical MethodsSigned-offCOAST GROUP CORP04/30/2025
DOB NOWProtection and Mechanical MethodsSigned-offCOAST GROUP CORP05/02/2024
DOB NOWPlumbingSigned-offNY CITY PLUMBER CORP04/11/2023
DOB NOWBoiler EquipmentSigned-offABILENE, INC03/27/2023
DOB NOWPlumbingPermit IssuedADVANCED PLUMBING MECH07/28/2022
DOB NOWPlumbingPermit IssuedPAT SEMENTA P & H CO INC02/27/2020
DOB NOWPlumbingSigned-offPAT SEMENTA P & H CO INC11/19/2019
BISOTISSUEDMC FAR CONTRACTORS INC11/21/2019
BISEQISSUEDSUPER VENUS CONSTRUCTION10/19/2011
BISEQISSUEDMSS CONSTRCUTION CORP10/24/2008
BISEQISSUEDMSS CONSTRUCTION CORP07/18/2008
1 project · most recent 12/14/2021
FiledStatusContractorScope
12/14/2021——1 heads
2 projects · most recent 12/14/2021
Gas Plumbing-Sprinkler Water/Sanitary
FiledStatusContractorScope
12/14/2021Permit IssuedADVANCED PLUMBING MECHGas, Plumbing-Sprinkler, Water/Sanitary
02/26/2020Permit IssuedPAT SEMENTA P & H CO INCGas
4 projects · most recent 05/05/2023
General Wiring
FiledStatusContractorScope
05/05/2023CompleteABILENE ELECTRIC INC1 meters
01/19/2023Permit IssuedABILENE ELECTRIC INC—
02/05/2020CompleteGILSTON BROTHERS ELECT'LGeneral Wiring
03/22/2019CompleteGILSTON BROTHERS ELECT'L—
▾Field Inspections (DOB CAP) — 3
DateTypeResultReport
07/25/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
07/10/2023Fail-Final PL - Up to 3 Requested FloorsFailView ↗
06/27/2023Pass-Final Boiler Equipment InspectionPassView ↗
▾Special Inspection Requirements (DOB NOW) — 20
DateRequirementInspectorRole
05/18/2023Fire-Resistant Penetrations and JointsLOUIS ARENAspecial
05/18/2023Tenant Protection Plan Compliance—special
05/18/2023Energy Code Compliance InspectionsLOUIS ARENAprogress
02/22/2023HVAC-R and service water heating equipmentLOUIS ARENAenergy_progress
02/22/2023Maintenance informationLOUIS ARENAenergy_progress
02/22/2023HVAC-R and service water piping design and insulationLOUIS ARENAenergy_progress
02/22/2023HVAC-R and service water heating system controlsLOUIS ARENAenergy_progress
02/21/2023Tenant Protection Plan ComplianceLOUIS ARENAspecial
02/17/2023Fuel-Oil Storage and Fuel-Oil Piping SystemsLOUIS ARENAspecial
02/17/2023Heating SystemsLOUIS ARENAspecial
11/18/2022Tenant Protection Plan ComplianceLOUIS ARENAspecial
11/15/2022HVAC-R and service water piping design and insulationLOUIS ARENAenergy_progress
11/15/2022Maintenance informationLOUIS ARENAenergy_progress
11/15/2022HVAC-R and service water heating system controlsLOUIS ARENAenergy_progress
11/15/2022HVAC-R and service water heating equipmentLOUIS ARENAenergy_progress
11/10/2022Fuel-Oil Storage and Fuel-Oil Piping SystemsLOUIS ARENAspecial
11/10/2022Heating SystemsLOUIS ARENAspecial
11/14/2019Fire-Resistant Penetrations and JointsGregory Perottospecial
11/14/2019Energy Code Compliance InspectionsGregory Perottoprogress
11/14/2019Fire-Resistance Rated ConstructionGregory Perottoprogress
▾Documents — 107 on file (BIS + DOB NOW)
▸Plans & Drawings9
▸DOB NOWPlans/Sketch7
09/03/2026M00618910-I1Request digital key ↗
08/31/2026M08038386-I1Request digital key ↗
08/31/2026M08038286-I1Request digital key ↗
Showing 3 of 7 on file for this type
▸DOB NOWPlans/Sketch - Plumbing2
08/15/2026M00265155-S1Request digital key ↗
08/15/2026M00265155-I1Request digital key ↗
▸Applications & Permits18
▸BISPLAN / WORK APPROVAL APPLICATION8
04/29/2020140867667Open ↗
04/29/2020140867667Open ↗
04/17/2020140867667Open ↗
Showing 3 of 8 on file for this type
▸BISWORK PERMIT APPLICATION6
09/09/2019140867667Open ↗
10/21/2011120862762Open ↗
12/08/2008110295831Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWLPC Approval/Permit4
08/13/2026M00618910-I1Open ↗
08/13/2026M00831280-P1Open ↗
08/13/2026M00831280-I1Open ↗
Showing 3 of 4 on file for this type
▸Seals & Professional Certifications34
▸DOB NOWDPL-1: Design Professional Seal & Signature9
09/05/2026M00265155-S1Open ↗
09/05/2026M00265155-I1Open ↗
08/31/2026M08038386-I1Open ↗
Showing 3 of 9 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION5
04/29/2020140867667Open ↗
04/17/2020140867667Open ↗
10/21/2011120862762Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWProgress Inspector Seal & Signature5
09/23/2026M00831318-I1Open ↗
08/30/2026M00265155-I1Open ↗
08/30/2026M00265155-I1Open ↗
Showing 3 of 5 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST4
10/21/2011120862762Open ↗
10/24/2008110372365Open ↗
07/26/2008110295831Open ↗
Showing 3 of 4 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM4
10/21/2011120862762Open ↗
10/24/2008110372365Open ↗
07/26/2008110295831Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature4
09/23/2026M00831318-I1Open ↗
08/30/2026M00265155-I1Open ↗
08/29/2026M00831280-P1Open ↗
Showing 3 of 4 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT1
09/09/2019140867667Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
09/09/2019140867667Open ↗
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION1
09/09/2019140867667Open ↗
▸Safety & Tenant Protection4
▸DOB NOWTenant Protection Plan2
08/13/2026M00265155-I1Open ↗
08/13/2026M00265155-S1Open ↗
▸BISTENANT PROTECTION PLAN AND NOTES1
09/09/2019140867667Open ↗
▸BISST-1: Street Tree Checklist1
07/26/2008110295831Open ↗
▸Environmental & Asbestos11
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form4
08/31/2026M08038386-I1Open ↗
08/31/2026M08038286-I1Open ↗
08/31/2026M00831280-I1Open ↗
Showing 3 of 4 on file for this type
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER3
10/27/2008110372365Open ↗
07/26/2008110295831Open ↗
07/15/2008110295608Open ↗
▸DOB NOWDEP ACP-5: Asbestos Assessment Report3
09/05/2026M00265155-I1Open ↗
09/05/2026M00265155-S1Open ↗
08/13/2026M00618910-I1Open ↗
▸BISASBESTOS: COMPLETION OR CLOSEOUT (ACP20/21/5)1
09/09/2019140867667Open ↗
▸Energy Compliance7
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY3
05/04/2020140867667Open ↗
09/09/2019140867667Open ↗
09/09/2019140867667Open ↗
▸BISAS-BUILT ENERGY ANALYSIS1
05/04/2020140867667Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS1
09/09/2019140867667Open ↗
▸BISNYCECC ANALYSIS1
09/09/2019140867667Open ↗
▸DOB NOWPreliminary Commissioning Report Certification1
08/13/2026M00831318-I1Open ↗
▸Inspections & Test Reports3
▸BISTECHNICAL REPORT: RESPONSIBILITY3
05/04/2020140867667Open ↗
09/09/2019140867667Open ↗
09/09/2019140867667Open ↗
▸Approvals, Objections & Sign-offs7
▸BISADMINISTRATIVE OBJECTIONS4
10/21/2011120862762Open ↗
10/24/2008110372365Open ↗
07/26/2008110295831Open ↗
Showing 3 of 4 on file for this type
▸BISLANDMARKS APPROVAL1
09/09/2019140867667Open ↗
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST1
05/04/2020140867667Open ↗
▸BISLANDMARKS SIGNOFF1
05/04/2020140867667Open ↗
▸Cost, Insurance & Ownership4
▸BISCOST AFFIDAVIT4
05/04/2020140867667Open ↗
04/30/2020140867667Open ↗
09/09/2019140867667Open ↗
Showing 3 of 4 on file for this type
▸Filing & Intake Forms8
▸BISEFILING COVER SHEET3
10/21/2011120862762Open ↗
10/27/2008110372365Open ↗
07/15/2008110295608Open ↗
▸BISBOROUGH INTAKE FORM2
04/29/2020140867667Open ↗
04/17/2020140867667Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET2
09/09/2019140867667Open ↗
07/26/2008110295831Open ↗
▸BISADDITIONAL INFORMATION1
04/30/2020140867667Open ↗
▸Other Documents2
▸DOB NOWPro Cert Restriction Exception (LL158/17)2
08/13/2026M08038386-I1Open ↗
08/13/2026M08038286-I1Open ↗