Elevator apt, semi-fireproof with stores
The Motto
2455 3RD AVENUE · Mott Haven-Port Morris · BIN 2129674
💬 Discuss this project
2022Year Built
24Stories
D7Building Class
M1-3/R8Zoning
130,403 sfGross Floor Area
142Units
LL97 CoveredRent Stabilized3 Active Violations ▸FDNY Report ↗
Elevator apt, semi-fireproof with stores · Owner of record: E 135 and 3rd Ave Owner · 10,157 sf lot · 12.84 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingFire ProtectionEquipmentCivilGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Whole building & multi-floor projectsE 135 And 3rd Ave Owner7 filings
RoofE 135 And 3rd Ave Owner1p · 2 filings
Floor 25E 135 And 3rd Ave Owner1 filing · 3 docs
Floor 24E 135 And 3rd Ave Owner1 filing
Floor 23
Floor 22
Floor 21E 135 And 3rd Ave Owner1 filing
Floor 20
Floor 19
Floor 18
Floor 17
Floor 16
Floor 15
Floor 14
Floor 13
Floor 12
Floor 11
Floor 10
Floor 9
Floor 8
Floor 7E 135 And 3rd Ave Owner1p · 1 filing
Floor 6
Floor 5
Floor 4
Floor 3225 East Realty Partners LL1 filing · 3 docs
Floor 2225 East Realty Partners LL1 filing · 3 docs
Floor 1
CellarE 135 And 3rd Ave Owner1p · 1 filing
Site & exteriorE 135 AND 3RD AVE OWNER LLC C/O Artimus6 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
E 135 3rd Ave Owner14407/08/2026
Defalco Concrete703/22/2026
225 East Realty603/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Skyline1602/27/2024
Enthink Engineers1606/07/2023
Asda Architecture + Design206/05/2023
Barry Gurvitch105/22/2023
KN3 Engineering108/17/2022
Universal Builders Supply307/13/2022
HM Loke Consulting Engineering207/11/2022
PC Group203/24/2022
Valjato Engineering108/09/2021
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Eurocelt Expediting603/21/2026
JM Zoning3603/21/2026
Valjato Engineering P203/21/2026
AE Design Solution203/21/2026
HM Loke Consulting Engineering203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Andamio ScaffoldingScaffold1807/08/2026
Xolle DemoScaffold1007/08/2026
Anthony G FerryElectrical703/21/2026
Five Borough NYCFire Protection707/08/2026
Forward MechanicalPlumbing307/08/2026
HaasGeneral Contractor303/21/2026
Xolle DemoGeneral Contractor307/08/2026
P-GoomScaffold303/21/2026
Defalco ConstructionScaffold203/21/2026
Anthony G FerryElectrical203/22/2026
Service Sign Erectors CoSign hanger207/08/2026
Borowide Elect'l ContractorsElectrical103/22/2026
Star Electrical ContractorsElectrical103/22/2026
Universal Builders SupplyScaffold107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Amaracon Testing & Inspec58421502/27/2024
Patuxent Engineering1893108/17/2022
Enthink Engineers6247204/15/2022
Engineering Group Associates526203/24/2022
Building Lifecycle
All (249)Filed (44)Permit Issued (34)Signed Off (17)Violation (30)Inspection (14)Objection (80)Special Inspection (30)
07/08/2026
Violation issued (HPD, open)
C
05/27/2026
Violation issued (HPD, open)
C
05/27/2026
Violation issued (HPD, closed)
B
05/27/2026
Violation issued (HPD, closed)
B
05/27/2026
Violation issued (HPD, closed)
B
08/08/2025
Violation issued (HPD, open)
B
08/08/2025
Violation issued (HPD, closed)
A
06/16/2025
Violation issued (HPD, closed)
A
11/29/2024
Violation issued (HPD, closed)
C
11/29/2024
Violation issued (HPD, closed)
C
11/29/2024
Violation issued (HPD, closed)
B
11/29/2024
Violation issued (HPD, closed)
B
11/29/2024
Violation issued (HPD, closed)
B
11/29/2024
Violation issued (HPD, closed)
B
11/29/2024
Violation issued (HPD, closed)
B
11/29/2024
Violation issued (HPD, closed)
C
11/29/2024
Violation issued (HPD, closed)
C
11/29/2024
Violation issued (HPD, closed)
C
11/29/2024
Violation issued (HPD, closed)
B
11/29/2024
Violation issued (HPD, closed)
B
11/29/2024
Violation issued (HPD, closed)
B
11/29/2024
Violation issued (HPD, closed)
C
11/29/2024
Violation issued (HPD, closed)
C
11/04/2024
Violation issued (HPD, closed)
B
11/04/2024
Violation issued (HPD, closed)
B
11/04/2024
Violation issued (HPD, closed)
B
04/25/2024
Signed off — Alteration
Sprinkler modification on 2nd and 3rd floor. No change in use, egress, or occupancy
X01010214-I1
04/18/2024
Violation issued (HPD, closed)
A
04/01/2024
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
03/27/2024
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
03/04/2024
Permit issued — Sprinklers
X01010214-I1-EW-SP
02/27/2024
Filed — Alteration
Sprinkler modification on 2nd and 3rd floor. No change in use, egress, or occupancy
X01010214-I1
02/23/2024
Special inspection requirement — Sprinkler Systems
CONNIE PISANI
02/23/2024
Special inspection requirement — Tenant Protection Plan Compliance
CONNIE PISANI
02/21/2024
Signed off — Alteration
Plumbing work as per plans filed.
X00286711-I1
01/31/2024
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
CONNIE PISANI
01/30/2024
Objection resolved — Addressed
01/26/2024
Objection raised — Other
01/24/2024
Filed — Alteration
Plumbing work as per plans filed.
X00286711-P8
01/12/2024
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
CONNIE PISANI
01/09/2024
Filed — Alteration
Plumbing work as per plans filed.
X00286711-P7
12/22/2023
Signed off — Alteration
Install combined sprinkler/standpipe system as per plans filed. No change to use, egress oroccupancy.
X00286728-I1
12/22/2023
Signed off — Alteration
Mechanical work as per plans filed.
X00286574-I1
12/06/2023
Signed off — Alteration
Structural work as per plans filed.
X00286413-I1
12/04/2023
Signed off — Alteration
Propose to install non-advertising sign. No change in use, egress, or occupancy.
X00884492-I1
12/04/2023
Signed off — Alteration
X00884496-I1
11/17/2023
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
CONNIE PISANI
11/15/2023
Special inspection requirement — Sprinkler Systems
CONNIE PISANI
11/15/2023
Special inspection requirement — Standpipe Systems
CONNIE PISANI
11/14/2023
Filed — Alteration
Install combined sprinkler/standpipe system as per plans filed. No change to use, egress oroccupancy.
X00286728-P2
11/14/2023
Filed — Alteration
Plumbing work as per plans filed.
X00286711-P6
10/23/2023
Signed off — Alteration
INSTALLATION OF CONSTRUCTION FENCE.
X00571716-I1
10/06/2023
Permit issued — Plumbing
X00286711-I1-PL
09/22/2023
Signed off — Alteration
TUP filing as per Building bulleting 2010-002
X00872993-I1
09/12/2023
Signed off — Alteration
Install temporary standpipe system during construction as per plans filed. No change to use, egress oroccupancy.
X00286748-I1
08/04/2023
Permit issued — Construction Fence
X00571716-I1-FN
07/31/2023
Signed off — Alteration
INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. LIVE LOAD 300PSF.
X00664144-I1
07/24/2023
Signed off — Alteration
INSTALLATION OF TEMPORARY ROOF PROTECTION AS PER PLANS.NEW BUILIDING JOB# 210180533 AND THE OVERHEAD PROTECTION WILL BE INSTALLED ON THE NEIGHBOR ADDRESS 2447 3 AVENUE.
X00704441-I1
07/24/2023
Signed off — Alteration
INSTALLATION OF TEMPORARY ROOF PROTECTION AS PER PLANS.NEW BUILIDING JOB# 210180542 AND THE OVERHEAD PROTECTION WILL BE INSTALLED ON THE NEIGHBOR ADDRESS 2447 3 AVENUE.
X00704432-I1
07/21/2023
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
Latest 60 of 249 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSprinklersSigned-offFive Borough NYC03/04/2024
DOB NOWPlumbingSigned-offForward Heating10/06/2023
DOB NOWConstruction FenceSigned-offXolle Demo08/04/2023
DOB NOWSignSigned-offService Sign Erectors Co06/07/2023
DOB NOWSignSigned-offService Sign Erectors Co06/07/2023
DOB NOWGeneral ConstructionSigned-offXolle Demo05/25/2023
DOB NOWProtection and Mechanical MethodsSigned-offAndamio Scaffolding04/07/2023
DOB NOWProtection and Mechanical MethodsSigned-offAndamio Scaffolding04/07/2023
DOB NOWSprinklersSigned-offFive Borough NYC03/16/2023
DOB NOWStandpipeSigned-offFive Borough NYC03/16/2023
DOB NOWMechanical SystemsSigned-offHaas02/10/2023
DOB NOWStructuralSigned-offXolle Demo02/08/2023
DOB NOWSupported ScaffoldSigned-offAndamio Scaffolding02/07/2023
DOB NOWSidewalk ShedSigned-offAndamio Scaffolding01/26/2023
DOB NOWPlumbingSigned-offForward Heating11/02/2022
DOB NOWProtection and Mechanical MethodsSigned-offP-Goom10/11/2022
DOB NOWStandpipeSigned-offFive Borough NYC10/05/2022
DOB NOWConstruction FenceSigned-offXolle Demo08/10/2022
DOB NOWProtection and Mechanical MethodsSigned-offDefalco Construction04/19/2022
DOB NOWProtection and Mechanical MethodsSigned-offAndamio Scaffolding04/15/2022
DOB NOWProtection and Mechanical MethodsSigned-offAndamio Scaffolding04/15/2022
DOB NOWProtection and Mechanical MethodsSigned-offUniversal Build Supp04/15/2022
DOB NOWStandpipeSigned-offFive Borough NYC04/08/2022
DOB NOWSprinklersSigned-offFive Borough NYC04/08/2022
DOB NOWConstruction FenceSigned-offXolle Demo03/10/2022
DOB NOWSupported ScaffoldSigned-offAndamio Scaffolding02/14/2022
DOB NOWSidewalk ShedSigned-offAndamio Scaffolding01/28/2022
DOB NOWPlumbingSigned-offForward Heating11/29/2021
DOB NOWStandpipeSigned-offFive Borough NYC10/14/2021
DOB NOWConstruction FenceSigned-offXolle Demo08/23/2021
DOB NOWConstruction FenceSigned-offXolle Demo08/17/2021
DOB NOWConstruction FencePermit IssuedXolle Demo02/19/2021
DOB NOWConstruction FencePermit IssuedXolle Demo02/14/2020
DOB NOWConstruction FencePermit IssuedXolle Demo05/15/2019
BIS—ISSUEDXolle Demo08/10/2023
BIS—ISSUEDXolle Demo08/10/2023
BIS—ISSUEDXolle Demo08/10/2023
BIS—ISSUEDXolle Demo05/22/2023
BIS—ISSUEDXolle Demo12/15/2022
BIS—ISSUEDXolle Demo12/15/2022
+ 13 more permits on file
10 projects · most recent 09/23/2024
General Wiring
FiledStatusContractorScope
09/23/2024CompleteAnthony G FerryGeneral Wiring
10/31/2023CompleteAnthony G FerryGeneral Wiring
07/29/2023CompleteAnthony G FerryGeneral Wiring
09/27/2022CancelledStar Electrical Contractors—
05/24/2022CompleteStar Electrical Contractors—
04/05/2022CompleteBorowide Elect'l Contractors—
03/09/2022CompleteBorowide Elect'l Contractors—
11/22/2021CompleteAnthony G Ferry—
11/10/2021CompleteAnthony G FerryGeneral Wiring
02/10/2021CompleteBorowide Elect'l Contractors—
▾Field Inspections (DOB CAP) — 14
DateTypeResultReport
04/01/2024Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
03/27/2024Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
07/21/2023Pass-Final General Construction Non-Directive 14PassView ↗
05/11/2023Pass-Final PL - Up to 9 Requested FloorsPassView ↗
05/05/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
04/17/2023Pass-Final SP - Up to 3 Requested FloorsPassView ↗
04/13/2023Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
04/11/2023Pass-Final SD - More than 10 Requested FloorsPassView ↗
04/07/2023Certified StandPipe-SD-Piping-Hydrostatic TestCertifiedView ↗
02/27/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
02/02/2023Pass-Final PL - Up to 9 Requested FloorsPassView ↗
06/01/2022Certified StandPipe - SD - Alarm Sys 64/09 - FinishCertifiedView ↗
06/01/2022Certified StandPipe - SD - Hydrostatic 63/09 Test (Initial 75 Feet)CertifiedView ↗
03/11/2022Pass-Final PL - UndergroundPassView ↗
▾Special Inspection Requirements (DOB NOW) — 34
DateRequirementInspectorRole
02/23/2024Sprinkler SystemsCONNIE PISANIspecial
02/23/2024Tenant Protection Plan ComplianceCONNIE PISANIspecial
01/31/2024Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationCONNIE PISANIspecial
01/12/2024Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationCONNIE PISANIspecial
11/17/2023Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationCONNIE PISANIspecial
11/15/2023Sprinkler SystemsCONNIE PISANIspecial
11/15/2023Standpipe SystemsCONNIE PISANIspecial
06/05/2023FinalAlfonso DEliaprogress
02/03/2023Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationCONNIE PISANIspecial
01/25/2023Sprinkler SystemsCONNIE PISANIspecial
01/25/2023Standpipe SystemsCONNIE PISANIspecial
09/16/2022Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationCONNIE PISANIspecial
08/11/2022Post-installed AnchorsJOHN O'CONNOR, P.E.special
06/30/2022Standpipe SystemsCONNIE PISANIspecial
06/28/2022Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationCONNIE PISANIspecial
06/21/2022Standpipe SystemsCONNIE PISANIspecial
03/24/2022Alternative Materials - OTCR Buildings Bulletin NumberSunil Saigalspecial
03/24/2022Structural Stability – Alterations of existing buildingsSunil Saigalspecial
03/24/2022Alternative Materials - OTCR Buildings Bulletin NumberSunil Saigalspecial
03/24/2022Post-installed AnchorsSunil Saigalspecial
03/24/2022Post-installed AnchorsSunil Saigalspecial
03/24/2022Structural Stability – Alterations of existing buildingsSunil Saigalspecial
09/01/2021Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationCONNIE PISANIspecial
07/09/2020Flood Zone Compliance (attach FEMA elevation/dry floodproofing certificate where applicable)—special
07/09/2020Fire-Resistant Penetrations and Joints—special
Latest 25 of 34.
▾Documents — 334 on file (BIS + DOB NOW)
▸Plans & Drawings45
▸DOB NOWPlans/Sketch25
08/25/2026X00571716-I1Request digital key ↗
08/24/2026X00704441-I1Request digital key ↗
08/24/2026X00704432-I1Request digital key ↗
Showing 3 of 25 on file for this type
▸DOB NOWPlans/Sketch - Plumbing8
08/22/2026X00286711-P4Request digital key ↗
08/22/2026X00286711-P7Request digital key ↗
08/22/2026X00286711-P3Request digital key ↗
Showing 3 of 8 on file for this type
▸DOB NOWPlans/Sketch - Standpipe5
08/24/2026X00286748-I1Request digital key ↗
08/23/2026X00286728-P1Request digital key ↗
08/23/2026X00286728-P2Request digital key ↗
Showing 3 of 5 on file for this type
▸DOB NOWPlans/Sketch - Sprinkler3
08/23/2026X00286728-P2Request digital key ↗
08/15/2026X00286728-I1Request digital key ↗
08/15/2026X00286728-P1Request digital key ↗
▸DOB NOWPlans/Sketch - Structural2
08/26/2026X00286413-I1Request digital key ↗
08/15/2026X00286413-P1Request digital key ↗
▸DOB NOWPlans/Sketch - Mechanical Systems2
08/26/2026X00286574-I1Request digital key ↗
08/14/2026X00286574-P1Request digital key ↗
▸Applications & Permits61
▸BISPLAN / WORK APPROVAL APPLICATION38
04/03/2024210082257Open ↗
04/03/2024220063071Open ↗
04/03/2024220165951Open ↗
Showing 3 of 38 on file for this type
▸BISWORK PERMIT APPLICATION17
08/11/2023210180533Open ↗
08/11/2023210180533Open ↗
12/15/2022210180533Open ↗
Showing 3 of 17 on file for this type
▸BISPLAN - WORK & PERMITS - SUPPPORTING DOCUMENTATION5
06/22/2023210180533Open ↗
04/27/2022240272101Open ↗
04/15/2021210180533Open ↗
Showing 3 of 5 on file for this type
▸BISBPP-5 - Authorization to the Department of Transportation1
04/10/2020240272101Open ↗
▸Zoning, Tax Lot & Property Records20
▸BISEASEMENT AND RESTRICTIVE DECLARATIONS - SUPPPORTING DOCUMENTATION6
10/15/2020210180533Open ↗
10/15/2020210180533Open ↗
10/15/2020210180533Open ↗
Showing 3 of 6 on file for this type
▸BISZONING DIAGRAM3
12/06/2021210180533Open ↗
07/01/2021210180533Open ↗
10/21/2020210180533Open ↗
▸BISTAX LOT: TENTATIVE LOT NUMBER ISSUED2
03/03/2021240272101Open ↗
04/02/2020210180533Open ↗
▸BISTAX LOT: FINAL LOT NUMBER ISSUED2
08/20/2024240272101Open ↗
10/08/2020210180533Open ↗
▸BISZONING EXHIBIT III:DESC. & OWNRSHP.STMNT1
10/08/2020210180533Open ↗
▸BISFLOOD ZONE COMPLIANCE1
11/06/2023210180533Open ↗
▸BISVERIFY TAX LOT1
04/24/2024210180533Open ↗
▸BISCO OBJ: VERIFY ADDRESS-TOPO STAMP1
04/23/2024210180533Open ↗
▸BISFLOOD ZONE DESIGN CERTIFICATION1
10/08/2020210180533Open ↗
▸BISZONING EXHIBIT IV: CERTIFICATION1
10/08/2020210180533Open ↗
▸BISZONING RESOLUTION DETERMINATION1
10/21/2020210180533Open ↗
▸Seals & Professional Certifications65
▸DOB NOWDPL-1: Design Professional Seal & Signature43
08/26/2026X00286574-I1Open ↗
08/26/2026X00286574-P1Open ↗
08/26/2026X00286413-I1Open ↗
Showing 3 of 43 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature17
09/02/2026X00286728-I1Open ↗
09/01/2026X01010214-I1Open ↗
09/01/2026X00286748-P2Open ↗
Showing 3 of 17 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION3
06/20/2012210082257Open ↗
01/25/2012220165951Open ↗
Showing 2 of 3 on file for this type
▸BISAPPLICANT OWNER SIGNATURE1
04/10/2020240272101Open ↗
▸DOB NOWProgress Inspector Seal & Signature1
09/01/2026X00884492-I1Open ↗
▸Trade Schedules & Equipment5
▸BISSCHEDULE B - PLUMBING3
10/10/2013210082257Open ↗
Showing 1 of 3 on file for this type
▸BISDETECTOR:SMOKE-CERT. OF INSTALLATION1
07/19/2023210180533Open ↗
▸BIS* SEWER CONNECTION: DEP SD1 & SD21
10/08/2020210180533Open ↗
▸Safety & Tenant Protection9
▸BISSTREET TREE CHECKLIST5
05/19/2021240272101Open ↗
02/05/2021240272101Open ↗
10/08/2020210180533Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWTenant Protection Plan2
08/13/2026X00286728-I1Open ↗
08/13/2026X00286711-I1Open ↗
▸BISBPP: STREET TREES SITE PLAN1
03/03/2021240272101Open ↗
▸BISSTREET TREE SIGNOFF1
04/23/2024210180533Open ↗
▸Environmental & Asbestos2
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER2
05/19/2010220063071Open ↗
Showing 1 of 2 on file for this type
▸Energy Compliance11
▸BISPRELIMINARY COMMISSIONING REPORT CERTIFICATION2
10/28/2024210180533Open ↗
07/24/2023210180533Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY1
10/19/2020210180533Open ↗
▸BISINSULATION PLACEMENT & R VALUES1
07/28/2023210180533Open ↗
▸BISLIGHTING IN DWELLING UNITS1
11/06/2023210180533Open ↗
▸BISENERGY CODE COMPLIANCE INSPECTIONS1
11/06/2023210180533Open ↗
▸BISAS-BUILT ENERGY ANALYSIS (EN2)1
11/06/2023210180533Open ↗
▸BISLIGHTING CONTROLS1
11/06/2023210180533Open ↗
▸BISTECHNICAL REPORT: ENERGY1
01/25/2012220165951Open ↗
▸BISEXTERIOR LIGHTING POWER1
11/06/2023210180533Open ↗
▸DOB NOWPreliminary Commissioning Report Certification1
08/13/2026X00286574-I1Open ↗
▸Inspections & Test Reports18
▸BISTECHNICAL REPORT: RESPONSIBILITY8
05/26/2022210180533Open ↗
04/28/2022210180533Open ↗
08/25/2021210180533Open ↗
Showing 3 of 8 on file for this type
▸BISFIRE-RESISTANT PENETRATIONS AND JOINTS (FIRESTOP)2
06/06/2024210180533Open ↗
06/06/2024210180533Open ↗
▸BISTECHNICAL REPORT: CONCRETE DESIGN MIX2
02/17/2022210180533Open ↗
10/26/2021210180533Open ↗
▸BISWALL PANELS, CURTAIN WALLS, AND VENEERS1
09/26/2023210180533Open ↗
▸BISTECHNICAL REPORT: PILE DRIVING1
04/08/2022210180533Open ↗
▸BISHYDRO FLOW TEST LETTER1
12/19/2011220063071Open ↗
▸BISSOIL REPORT1
10/08/2020210180533Open ↗
▸BISTECHNICAL REPORT: CONCRETE/TEST CYLINDER1
10/26/2021210180533Open ↗
▸BISTECHNICAL REPORT: SOIL INSPECTION1
10/08/2020210180533Open ↗
▸Approvals, Objections & Sign-offs32
▸BISSCHEDULE A - OCCUPANCY / USE19
12/01/2022210180533Open ↗
10/08/2021210180533Open ↗
03/11/2021210180533Open ↗
Showing 3 of 19 on file for this type
▸BISSUPERSEDING LETTER5
08/11/2023210180533Open ↗
05/31/2022210180533Open ↗
05/31/2022210180533Open ↗
Showing 3 of 5 on file for this type
▸BISADMINISTRATIVE OBJECTIONS3
01/25/2012220165951Open ↗
Showing 1 of 3 on file for this type
▸BISCONSTRUCTION CODE DETERMINATION2
08/11/2023210180533Open ↗
10/21/2020210180533Open ↗
▸BISNYS DEC TIDAL WETLANDS APPROVAL2
03/03/2021240272101Open ↗
10/08/2020210180533Open ↗
▸BISBSA/CPC APPROVAL1
06/23/2020210180533Open ↗
▸Cost, Insurance & Ownership6
▸BISCOST AFFIDAVIT3
01/25/2012220165951Open ↗
05/19/2010220063071Open ↗
Showing 2 of 3 on file for this type
▸BISPROJECT-SPECIFIC GL INSURANCE3
10/26/2021210180533Open ↗
11/29/2012210082257Open ↗
06/12/2012210082257Open ↗
▸Filing & Intake Forms24
▸BISADDITIONAL INFORMATION16
07/14/2023210180533Open ↗
07/14/2023210180533Open ↗
06/29/2023210180533Open ↗
Showing 3 of 16 on file for this type
▸BISEFILING COVER SHEET4
12/31/2019210180533Open ↗
01/25/2012220165951Open ↗
Showing 2 of 4 on file for this type
▸BISBOROUGH INTAKE FORM3
05/31/2022210180533Open ↗
03/18/2022210180533Open ↗
10/26/2021210180533Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET1
04/10/2020240272101Open ↗
▸Other Documents17
▸DOB NOWFEMA Elevation Certificate (086-0-33)/Flood Proofing Certificate (086-0-34)5
08/13/2026X00286711-I1Open ↗
08/13/2026X00286413-I1Open ↗
08/13/2026X00286728-I1Open ↗
Showing 3 of 5 on file for this type
▸BISBPP - SUPPORTING DOCUMENTATION3
05/19/2021240272101Open ↗
05/19/2021240272101Open ↗
05/19/2021240272101Open ↗
▸DOB NOWLowest Floor Elevation Plan3
08/24/2026X00286748-I1Open ↗
08/15/2026X00286728-I1Open ↗
08/15/2026X00286711-I1Open ↗
▸BISPLOT DIAGRAM2
10/15/2020210180533Open ↗
Showing 1 of 2 on file for this type
▸BISVESTIBULES1
11/06/2023210180533Open ↗
▸BISPROTECTION OF EXPOSED FOUNDATION INSULATION1
07/28/2023210180533Open ↗
▸BISFEMA ELEVATION CERT (086-0-33)/ FLOODPROOFING CERT (086-0-34)1
07/14/2023210180533Open ↗
▸DOB NOWSupporting Document1
08/13/2026X00286574-P1Open ↗