← Back
Office only, 2-6 stories
24-55 FRANCIS LEWIS BLVD
QUEENS · BIN 4129428
💬 Discuss this project
1960Year Built
2Stories
O2Building Class
R4Zoning
4,090 sfGross Floor Area
3Units
Office only, 2-6 stories · Owner of record: 2455 FRANCIS LEWIS INC. · 4,176 sf lot · 0.98 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
24-55 FRANCIS LEWIS REALTY607/08/2026
GINO O LONGO ARCHITECT1404/09/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
09/20/2024$1.4M—— → —$342/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
GINO O. LONGO, ARCHITECT302/06/2025
SERDAR CEYLAN ARCHITECT, PC211/11/2022
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
FALCON CONSTRUCTION & DEVELOPGeneral Contractor304/09/2026
WMS ELECTRICAL CONTNG LTDElectrical103/22/2026
HYDRAULICS MECHANICAL INCPlumbing107/08/2026
RENEW PLUMBING CORPPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
GINO O. LONGO ARCHITETCT331402/06/2025
CEYLAN DESIGN AND CONSULT8422211/11/2022
Building Lifecycle
All (48)Filed (5)Permit Issued (4)Signed Off (3)Inspection (9)Objection (10)Special Inspection (17)
04/21/2026
Signed off — Alteration
APPLICATION HEREWITH FILED FOR NEW 2 PCS BATHROOM AND SINK AT FIRST FLOOR. NO CHANGE IN OCCUPANCY, USE OR EGRESS.
Q01118527-I1
03/02/2026
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
02/11/2026
Inspection — Fail-Final General Construction Non-Directive 14
Fail
View inspection ↗
02/04/2026
Inspection — Fail-Final General Construction Non-Directive 14
Fail
View inspection ↗
01/26/2026
Permit issued — General Construction
Q01118527-I1-GC-CX
09/17/2025
Inspection — Fail-Final General Construction Non-Directive 14
Fail
View inspection ↗
04/24/2025
Signed off — Alteration
APPLICATION HEREWITH FILED FOR NEW 2 PCS BATHROOM AND SINK AT FIRST FLOOR. NO CHANGE IN OCCUPANCY, USE OR EGRESS.
Q01118527-S1
04/21/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
02/13/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
02/13/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
02/13/2025
Objection resolved — Addressed
02/13/2025
Objection resolved — Addressed
02/10/2025
Objection raised — Other
02/10/2025
Objection raised — Other
02/07/2025
Permit issued — Plumbing
Q01118527-S1-PL
02/06/2025
Filed — Alteration
APPLICATION HEREWITH FILED FOR NEW 2 PCS BATHROOM AND SINK AT FIRST FLOOR. NO CHANGE IN OCCUPANCY, USE OR EGRESS.
Q01118527-P1
02/05/2025
Filed — Alteration
APPLICATION HEREWITH FILED FOR NEW 2 PCS BATHROOM AND SINK AT FIRST FLOOR. NO CHANGE IN OCCUPANCY, USE OR EGRESS.
Q01118527-S1
02/05/2025
Special inspection requirement — Energy Code Compliance Inspections
GINO LONGO
02/05/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
GINO LONGO
02/03/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
02/03/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
GINO LONGO
01/31/2025
Special inspection requirement — Fenestration areas
GINO LONGO
01/31/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
GINO LONGO
01/31/2025
Special inspection requirement — Structural Steel - Details
GINO LONGO
01/31/2025
Special inspection requirement — Final
GINO LONGO
01/31/2025
Special inspection requirement — Air barrier - visual inspection
GINO LONGO
01/31/2025
Special inspection requirement — Fenestration air leakage
GINO LONGO
01/31/2025
Special inspection requirement — Fenestration and door U-factor and product ratings
GINO LONGO
11/06/2024
Permit issued — Structural
Q01118527-I1-GC-CX
10/10/2024
Objection resolved — Addressed
10/10/2024
Objection resolved — Addressed
10/10/2024
Objection resolved — Addressed
10/07/2024
Objection raised — Other
10/07/2024
Objection raised — Inspections
10/07/2024
Objection raised — Accessibility
10/02/2024
Filed — Alteration
APPLICATION HEREWITH FILED FOR NEW 2 PCS BATHROOM AND SINK AT FIRST FLOOR. NO CHANGE IN OCCUPANCY, USE OR EGRESS.
Q01118527-I1
04/16/2024
Signed off — Alteration
APPLICATION IS FILED TO UPDATE THE GAS LINE TO EXISTING 1 EXISTING H.W.H., AND 2 HVAC UNITS IN EXISTING COMMERCIAL & OFFICE BUILDING AS PLANS SUBMITTED.
Q08016627-I1
09/26/2023
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
11/22/2022
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
11/17/2022
Special inspection requirement — HVAC-R and service water piping design and insulation
SERDAR CEYLAN
11/17/2022
Special inspection requirement — Energy Code Compliance Inspections
SERDAR CEYLAN
11/17/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
SERDAR CEYLAN
11/11/2022
Filed — Alteration
APPLICATION IS FILED TO UPDATE THE GAS LINE TO EXISTING 1 EXISTING H.W.H., AND 2 HVAC UNITS IN EXISTING COMMERCIAL & OFFICE BUILDING AS PLANS SUBMITTED.
Q08016627-P1
11/10/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
SERDAR CEYLAN
11/10/2022
Special inspection requirement — Energy Code Compliance Inspections
SERDAR CEYLAN
11/10/2022
Special inspection requirement — HVAC-R and service water piping design and insulation
SERDAR CEYLAN
11/03/2022
Permit issued — Plumbing
Q08016627-I1-PL
10/20/2022
Filed — Alteration
APPLICATION IS FILED TO UPDATE THE GAS LINE TO EXISTING 1 EXISTING H.W.H., AND 2 HVAC UNITS IN EXISTING COMMERCIAL & OFFICE BUILDING AS PLANS SUBMITTED.
Q08016627-I1
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offFALCON CONSTRUCTION & DEV01/26/2026
DOB NOWPlumbingSigned-offRENEW PLUMBING CORP02/07/2025
DOB NOWStructuralSigned-offFALCON CONSTRUCTION & DEV11/06/2024
DOB NOWPlumbingSigned-offHYDRAULICS MECHANICAL INC11/03/2022
BISMHISSUEDDUAL PURPOSE CORPORATION08/06/2012
BISOTISSUEDPLANET CONSTRUCTION & DE*05/03/2007
1 project · most recent 12/04/2024
FiledStatusContractorScope
12/04/2024CompleteWMS ELECTRICAL CONTNG LTD3 meters, 3 new_meters
▾Field Inspections (DOB CAP) — 9
DateTypeResultReport
03/02/2026Pass-Final General Construction Non-Directive 14PassView ↗
02/11/2026Fail-Final General Construction Non-Directive 14FailView ↗
02/04/2026Fail-Final General Construction Non-Directive 14FailView ↗
09/17/2025Fail-Final General Construction Non-Directive 14FailView ↗
04/21/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
02/13/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
02/13/2025Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
09/26/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
11/22/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
▾Special Inspection Requirements (DOB NOW) — 17
DateRequirementInspectorRole
02/05/2025Energy Code Compliance InspectionsGINO LONGOprogress
02/05/2025HVAC-R and service water piping design and insulationGINO LONGOenergy_progress
02/03/2025Fire-Resistant Penetrations and Joints—special
02/03/2025Fire-Resistant Penetrations and JointsGINO LONGOspecial
01/31/2025Fenestration areasGINO LONGOenergy_progress
01/31/2025Structural Stability – Alterations of existing buildingsGINO LONGOspecial
01/31/2025Structural Steel - DetailsGINO LONGOspecial
01/31/2025FinalGINO LONGOprogress
01/31/2025Air barrier - visual inspectionGINO LONGOenergy_progress
01/31/2025Fenestration air leakageGINO LONGOenergy_progress
01/31/2025Fenestration and door U-factor and product ratingsGINO LONGOenergy_progress
11/17/2022HVAC-R and service water piping design and insulationSERDAR CEYLANenergy_progress
11/17/2022Energy Code Compliance InspectionsSERDAR CEYLANprogress
11/17/2022Fire-Resistant Penetrations and JointsSERDAR CEYLANspecial
11/10/2022Fire-Resistant Penetrations and JointsSERDAR CEYLANspecial
11/10/2022Energy Code Compliance InspectionsSERDAR CEYLANprogress
11/10/2022HVAC-R and service water piping design and insulationSERDAR CEYLANenergy_progress
▾Documents — 44 on file (BIS + DOB NOW)
▸Plans & Drawings5
▸DOB NOWPlans/Sketch5
08/25/2026Q08016627-P1Request digital key ↗
08/25/2026Q08016627-I1Request digital key ↗
08/21/2026Q01118527-S1Request digital key ↗
Showing 3 of 5 on file for this type
▸Applications & Permits3
▸BISNon-Directive 14 Construction Sign Off Including Sign Applications1
08/18/2012420595724Open ↗
▸BISPLAN / WORK APPROVAL APPLICATION1
08/09/2012420595724Open ↗
▸BISWORK PERMIT APPLICATION1
08/09/2012420595724Open ↗
▸Seals & Professional Certifications21
▸DOB NOWProgress Inspector Seal & Signature8
09/27/2026Q01118527-P1Open ↗
09/27/2026Q01118527-P1Open ↗
09/02/2026Q01118527-S1Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature5
08/25/2026Q08016627-P1Open ↗
08/25/2026Q08016627-I1Open ↗
08/21/2026Q01118527-I1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature4
09/27/2026Q01118527-P1Open ↗
09/02/2026Q01118527-S1Open ↗
08/31/2026Q08016627-P1Open ↗
Showing 3 of 4 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION2
08/18/2012420595724Open ↗
08/09/2012420595724Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST1
08/09/2012420595724Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM1
08/09/2012420595724Open ↗
▸Trade Schedules & Equipment2
▸BISEQUIPMENT USE PERMITS1
08/18/2012420595724Open ↗
▸BISEQUIPMENT USE APPLICATION/PERMIT1
08/18/2012420595724Open ↗
▸Environmental & Asbestos5
▸DOB NOWDEP ACP-5: Asbestos Assessment Report5
08/25/2026Q08016627-P1Open ↗
08/25/2026Q08016627-I1Open ↗
08/21/2026Q01118527-S1Open ↗
Showing 3 of 5 on file for this type
▸Energy Compliance3
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS2
08/18/2012420595724Open ↗
08/09/2012420595724Open ↗
▸BISAS-BUILT ENERGY ANALYSIS1
08/18/2012420595724Open ↗
▸Approvals, Objections & Sign-offs2
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST1
08/18/2012420595724Open ↗
▸BISADMINISTRATIVE OBJECTIONS1
08/09/2012420595724Open ↗
▸Cost, Insurance & Ownership2
▸BISCOST AFFIDAVIT2
08/18/2012420595724Open ↗
08/09/2012420595724Open ↗
▸Filing & Intake Forms1
▸BISEFILING COVER SHEET1
08/09/2012420595724Open ↗