← Back
Three families
2457 DEVOE TERRACE
BRONX · BIN 2014785
💬 Discuss this project
1910Year Built
3Stories
C0Building Class
R6Zoning
4,050 sfGross Floor Area
3Units
Rent Stabilized4 Open Violations ▸
Three families · Owner of record: 2457 DEVOE LLC · 4,171 sf lot · 0.97 FAR built · Flood zone X
Locations of Work
ArchitectureFire ProtectionGeneral
Roof19p · 1 filing · 20 docs
Floor 316p · 1 filing · 20 docs
Floor 216p · 1 filing · 20 docs
Floor 119p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
2457 DEVOE LLC103/22/2026
GROUP USA INC BUILDERS203/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
11/30/2023$1.2M—— → —$290/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
LESTER KATZ, NCARB509/05/2024
VASILIOS ARTEMIOU PE110/18/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
XPDITE GROUP LLC (104)603/21/2026
XPDITE GROUP LLC 105603/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
BUILDERS GROUP USA INCGeneral Contractor403/21/2026
PRIME PIPING & HEATING INFire Protection107/08/2026
PRIME PIPING & HEATING INPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
HRF SERVICES CORP5616609/05/2024
Building Lifecycle
All (131)Filed (6)Permit Issued (4)Signed Off (3)Violation (21)Inspection (7)Objection (60)Special Inspection (30)
08/16/2026
Violation issued (HPD, open)
B
08/16/2026
Violation issued (HPD, open)
C
04/30/2026
Violation issued (HPD, closed)
A
05/30/2025
Violation issued (HPD, closed)
A
05/30/2025
Violation issued (HPD, closed)
A
04/29/2025
Violation issued (HPD, closed)
A
04/29/2025
Violation issued (HPD, closed)
A
04/29/2025
Violation issued (HPD, open)
C
04/29/2025
Violation issued (HPD, closed)
A
04/29/2025
Violation issued (HPD, closed)
A
11/25/2024
Violation issued (HPD, closed)
I
11/19/2024
Special inspection requirement — Interior lighting power
FAHAD FATEH
11/19/2024
Special inspection requirement — Fenestration and door U-factor and product ratings
FAHAD FATEH
11/19/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
FAHAD FATEH
11/19/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
FAHAD FATEH
11/19/2024
Special inspection requirement — Energy Code Compliance Inspections
FAHAD FATEH
11/19/2024
Special inspection requirement — Fire-Resistance Rated Construction
FAHAD FATEH
11/19/2024
Special inspection requirement — Fenestration air leakage
FAHAD FATEH
11/19/2024
Special inspection requirement — Lighting in dwelling units
FAHAD FATEH
11/19/2024
Special inspection requirement — Lighting controls
FAHAD FATEH
11/19/2024
Special inspection requirement — Metering
FAHAD FATEH
11/19/2024
Special inspection requirement — Fenestration areas
FAHAD FATEH
11/19/2024
Special inspection requirement — Maintenance information
FAHAD FATEH
11/19/2024
Special inspection requirement — Exterior lighting power
FAHAD FATEH
11/07/2024
Objection resolved — Addressed
11/07/2024
Objection resolved — Addressed
10/29/2024
Objection raised — Other
10/16/2024
Objection resolved — Addressed
10/10/2024
Objection raised — Other
09/18/2024
Objection resolved — Addressed
09/12/2024
Objection raised — Other
09/12/2024
Objection raised — Other
09/05/2024
Filed — Alteration CO
SPRINKLER APPLICATION FILED HEREWITH IN CONJUCTION TO ALT-CO #X00907533-I1
X00907533-P2
09/05/2024
Special inspection requirement — Fenestration air leakage
FAHAD FATEH
09/05/2024
Special inspection requirement — Metering
FAHAD FATEH
09/05/2024
Special inspection requirement — Maintenance information
FAHAD FATEH
09/05/2024
Special inspection requirement — Interior lighting power
FAHAD FATEH
09/05/2024
Special inspection requirement — Fenestration and door U-factor and product ratings
FAHAD FATEH
09/05/2024
Special inspection requirement — Exterior lighting power
FAHAD FATEH
09/05/2024
Special inspection requirement — Lighting in dwelling units
FAHAD FATEH
09/05/2024
Special inspection requirement — Fenestration areas
FAHAD FATEH
09/05/2024
Special inspection requirement — Lighting controls
FAHAD FATEH
09/05/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
FAHAD FATEH
09/05/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
FAHAD FATEH
09/05/2024
Special inspection requirement — Energy Code Compliance Inspections
FAHAD FATEH
09/05/2024
Special inspection requirement — Fire-Resistance Rated Construction
FAHAD FATEH
08/21/2024
Violation issued (ECB, closed)
Construction
08/21/2024
Violation issued (ECB, closed)
Construction
08/21/2024
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
08/13/2024
Inspection — Fail-Final CND-Occupancy Inspection
Fail
View inspection ↗
06/21/2024
Signed off — Alteration CO
SPRINKLER APPLICATION FILED HEREWITH IN CONJUCTION TO ALT-CO #X00907533-I1
X00907533-S3
06/19/2024
Signed off — Alteration CO
SPRINKLER APPLICATION FILED HEREWITH IN CONJUCTION TO ALT-CO #X00907533-I1
X00907533-S1
06/18/2024
Signed off — Alteration CO
SPRINKLER APPLICATION FILED HEREWITH IN CONJUCTION TO ALT-CO #X00907533-I1
X00907533-S2
05/23/2024
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
05/21/2024
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
05/06/2024
Permit issued — Mechanical Systems
X00907533-S2-MS
04/10/2024
Special inspection requirement — Duct leakage testing, insulation and design
FAHAD FATEH
04/02/2024
Violation issued (HPD, closed)
A
03/27/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
03/19/2024
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
Latest 60 of 131 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsSigned-offBUILDERS GROUP USA05/06/2024
DOB NOWGeneral ConstructionPermit IssuedBUILDERS GROUP USA12/27/2023
DOB NOWPlumbingSigned-offPRIME PIPING & HEATING IN12/22/2023
DOB NOWSprinklersSigned-offA M B MECHANICAL INC12/22/2023
BISOTISSUEDNONE02/10/1999
1 project · most recent 09/05/2024
Sprinkler System
FiledStatusContractorScope
09/05/2024Signed-offPRIME PIPING & HEATING INSprinkler System
1 project · most recent 09/05/2024
Water/Sanitary
FiledStatusContractorScope
09/05/2024Signed-offA M B MECHANICAL INCWater/Sanitary
1 project · most recent 07/08/2024
General Wiring
FiledStatusContractorScope
07/08/2024CompleteFRIED ELECTRIC CO.General Wiring
▾Field Inspections (DOB CAP) — 7
DateTypeResultReport
08/21/2024Pass-Final CND-Occupancy InspectionPassView ↗
08/13/2024Fail-Final CND-Occupancy InspectionFailView ↗
05/23/2024Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
05/21/2024Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
03/27/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
03/19/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
02/20/2024Pass-Final PL - Up to 9 Requested FloorsPassView ↗
▾Special Inspection Requirements (DOB NOW) — 40
DateRequirementInspectorRole
11/19/2024Interior lighting powerFAHAD FATEHenergy_progress
11/19/2024Fenestration and door U-factor and product ratingsFAHAD FATEHenergy_progress
11/19/2024Structural Stability – Alterations of existing buildingsFAHAD FATEHspecial
11/19/2024Fire-Resistant Penetrations and JointsFAHAD FATEHspecial
11/19/2024Energy Code Compliance InspectionsFAHAD FATEHprogress
11/19/2024Fire-Resistance Rated ConstructionFAHAD FATEHprogress
11/19/2024Fenestration air leakageFAHAD FATEHenergy_progress
11/19/2024Lighting in dwelling unitsFAHAD FATEHenergy_progress
11/19/2024Lighting controlsFAHAD FATEHenergy_progress
11/19/2024MeteringFAHAD FATEHenergy_progress
11/19/2024Fenestration areasFAHAD FATEHenergy_progress
11/19/2024Maintenance informationFAHAD FATEHenergy_progress
11/19/2024Exterior lighting powerFAHAD FATEHenergy_progress
09/05/2024Fenestration air leakageFAHAD FATEHenergy_progress
09/05/2024MeteringFAHAD FATEHenergy_progress
09/05/2024Maintenance informationFAHAD FATEHenergy_progress
09/05/2024Interior lighting powerFAHAD FATEHenergy_progress
09/05/2024Fenestration and door U-factor and product ratingsFAHAD FATEHenergy_progress
09/05/2024Exterior lighting powerFAHAD FATEHenergy_progress
09/05/2024Lighting in dwelling unitsFAHAD FATEHenergy_progress
09/05/2024Fenestration areasFAHAD FATEHenergy_progress
09/05/2024Lighting controlsFAHAD FATEHenergy_progress
09/05/2024Fire-Resistant Penetrations and JointsFAHAD FATEHspecial
09/05/2024Structural Stability – Alterations of existing buildingsFAHAD FATEHspecial
09/05/2024Energy Code Compliance InspectionsFAHAD FATEHprogress
Latest 25 of 40.
▾Documents — 43 on file (BIS + DOB NOW)
▸Plans & Drawings6
▸DOB NOWPlans/Sketch6
08/21/2026X00907533-P1Request digital key ↗
08/21/2026X00907533-P2Request digital key ↗
08/21/2026X00907533-S3Request digital key ↗
Showing 3 of 6 on file for this type
▸Applications & Permits2
▸BISPLAN / WORK APPROVAL APPLICATION2
09/29/2023200565218Open ↗
09/19/2023200565218Open ↗
▸Zoning, Tax Lot & Property Records1
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026X00907533-I1Open ↗
▸Seals & Professional Certifications19
▸DOB NOWProgress Inspector Seal & Signature8
09/21/2026X00907533-I1Open ↗
09/21/2026X00907533-I1Open ↗
08/31/2026X00907533-P2Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature6
08/13/2026X00907533-I1Open ↗
08/13/2026X00907533-S3Open ↗
08/13/2026X00907533-P1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature5
09/21/2026X00907533-I1Open ↗
08/31/2026X00907533-P2Open ↗
08/26/2026X00907533-S3Open ↗
Showing 3 of 5 on file for this type
▸Safety & Tenant Protection3
▸DOB NOWStreet Tree Checklist3
08/13/2026X00907533-I1Open ↗
08/13/2026X00907533-P1Open ↗
08/13/2026X00907533-P2Open ↗
▸Environmental & Asbestos6
▸DOB NOWDEP ACP-5: Asbestos Assessment Report6
08/13/2026X00907533-I1Open ↗
08/13/2026X00907533-S1Open ↗
08/13/2026X00907533-P1Open ↗
Showing 3 of 6 on file for this type
▸Inspections & Test Reports1
▸BIS* FINAL INSPECTION DIRECTIVE 14 OF 19751
09/19/2023200565218Open ↗
▸Approvals, Objections & Sign-offs1
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST1
10/06/2023200565218Open ↗
▸Other Documents4
▸DOB NOWProperty Ownership Certification3
08/13/2026X00907533-P1Open ↗
08/13/2026X00907533-P2Open ↗
08/13/2026X00907533-I1Open ↗
▸BISTHE PLANS ARE MISSING.1
10/05/2023200565218Open ↗