← Back
BuildNYC
Two stories - detached, small or mid-size
246-20 CAMBRIA AVENUE
QUEENS · BIN 4170541
💬 Discuss this project
1955Year Built
2Stories
A1Building Class
R2AZoning
1,593 sfGross Floor Area
1Units
Two stories - detached, small or mid-size · 5,200 sf lot · 0.31 FAR built · Flood zone X
Locations of Work
Electrical
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
RoofPhotovoltaic solar panel installation1p · 1 filing · 9 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Parker and West Engineering106/14/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Sunrun103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Sunrun Installation ServiceGeneral Contractor203/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Parker and West Engineering5272106/14/2024
Building Lifecycle
10/01/2024
Signed off — Alteration
FILING HEREWITH TAX ABATEMENT APPLICATION FOR INSTALLATION OF ROOF MOUNTED SOLAR PANELS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
Q01064556-I1
06/24/2024
Permit issued — Solar
Q01064556-I1-SL
06/14/2024
Filed — Alteration
FILING HEREWITH TAX ABATEMENT APPLICATION FOR INSTALLATION OF ROOF MOUNTED SOLAR PANELS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
Q01064556-I1
06/10/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Walid Abdulla
06/10/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
Walid Abdulla
8 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSolarSigned-offSunrun Installation Service06/24/2024
BISPLISSUEDFlytiger P & H07/31/2006
BISEQISSUEDAmerican C Construction06/20/2006
BISPLISSUEDWagner Weintraub06/27/1997
BISOTISSUEDMichael Kuo03/03/1997
1 project · most recent 06/14/2024
FiledStatusContractorScope
06/14/2024CompleteSunrun Solar Electl—
▾Special Inspection Requirements (DOB NOW) — 5
DateRequirementInspectorRole
06/10/2024Fire-Resistant Penetrations and JointsWalid Abdullaspecial
06/10/2024Structural Stability – Alterations of existing buildingsWalid Abdullaspecial
06/10/2024Energy Code Compliance InspectionsWalid Abdullaprogress
06/10/2024FinalWalid Abdullaprogress
06/10/2024Air barrier - visual inspectionWalid Abdullaenergy_progress
9 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account