← Back
Primarily 2 family with 1 store or office
246 24 STREET
BROOKLYN · BIN 3009577
💬 Discuss this project
1935Year Built
3Stories
S2Building Class
M1-2DZoning
2,625 sfGross Floor Area
3Units
Rent Stabilized0 Open Violations
Primarily 2 family with 1 store or office · Owner of record: 750 4TH AVENUE LLC · 1,071 sf lot · 2.45 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanical
Roof4p · 1 filing · 20 docs
Floor 14p · 2 filings · 20 docs
Cellar3p · 2 filings · 20 docs
1 job · most recent 08/08/2023
General Wiring
FiledStatusContractorScope
08/08/2023CompleteQ.Y. ELECTRIC, INCGeneral Wiring
Building Lifecycle
All (75)Filed (14)Permit Issued (14)Signed Off (5)Violation (1)Inspection (5)Objection (6)Special Inspection (30)
12/04/2024
Violation issued (HPD, closed)
I
04/08/2024
Signed off — Alteration
THE PURPOSE OF THIS PROJECT IS TO REFURBISH THE EXISTING MIXED-USE BUILDING (STORE AND 2 DWELLING UNITS) AS PER THE SUBMITTED PLANS. PARTIAL INTERIOR DEMOLITION OF NON-LOAD-BEARING WALLS. NO CHANGE TO EXISTING BULK, USE, EGRESS, OR OCCUPANCY.
B00668458-I1
02/20/2024
Signed off — Alteration
Plumbing work in conjunction with job # B00668458
B00672954-I1
11/28/2023
Special inspection requirement — Energy Code Compliance Inspections
Mohammad Baalbaki
11/25/2023
Filed — Alteration
Plumbing work in conjunction with job # B00668458
B00672954-P5
11/25/2023
Special inspection requirement — Energy Code Compliance Inspections
Mohammad Baalbaki
11/16/2023
Signed off — Alteration
CONSTRUCTION FENCE IN CONJUNCTION WITH JOB # B00668458-I1
B00712383-I1
10/31/2023
Signed off — Alteration
ADD 3 NAVIEN NCB-240, COMBINATION BOILERS AT CELLAR ONE FOR EACH FLOOR
B00712382-S1
10/31/2023
Signed off — Alteration
ADD 3 NAVIEN NCB-240, COMBINATION BOILERS AT CELLAR ONE FOR EACH FLOOR
B00712382-I1
10/20/2023
Inspection — Pass-Final Boiler Equipment Inspection
Pass
View inspection ↗
10/19/2023
Permit issued — Boiler Equipment
B00712382-S1-BE
10/11/2023
Permit issued — Mechanical Systems
B00668458-I1-GC
10/04/2023
Special inspection requirement — Heating Systems
Barry Berg
10/03/2023
Filed — Alteration
ADD 3 NAVIEN NCB-240, COMBINATION BOILERS AT CELLAR ONE FOR EACH FLOOR
B00712382-P2
10/03/2023
Objection resolved — Addressed
10/03/2023
Special inspection requirement — Heating Systems
Barry Berg
09/26/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
Mohammad Baalbaki
09/26/2023
Special inspection requirement — Maintenance information
Mohammad Baalbaki
09/26/2023
Special inspection requirement — HVAC-R and service water heating system controls
Mohammad Baalbaki
09/26/2023
Special inspection requirement — HVAC-R and service water piping design and insulation
Mohammad Baalbaki
09/26/2023
Special inspection requirement — Heating Systems
Mohammad Baalbaki
09/26/2023
Special inspection requirement — HVAC-R and service water heating equipment
Mohammad Baalbaki
09/25/2023
Objection raised — Energy
09/22/2023
Inspection — Pass-Final Boiler Equipment Inspection
Pass
View inspection ↗
09/18/2023
Filed — Alteration
ADD 3 NAVIEN NCB-240, COMBINATION BOILERS AT CELLAR ONE FOR EACH FLOOR
B00712382-S1
08/28/2023
Special inspection requirement — Fenestration and door U-factor and product ratings
Mohammad Baalbaki
08/28/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
Mohammad Baalbaki
08/28/2023
Special inspection requirement — Mechanical Systems
Mohammad Baalbaki
08/28/2023
Special inspection requirement — Heating Systems
Mohammad Baalbaki
08/28/2023
Special inspection requirement — Structural Stability – Alterations of existing buildings
Mohammad Baalbaki
08/28/2023
Special inspection requirement — Interior lighting power
Mohammad Baalbaki
08/28/2023
Special inspection requirement — Final
JOHN MALVASIO
08/28/2023
Special inspection requirement — Energy Code Compliance Inspections
Mohammad Baalbaki
08/28/2023
Special inspection requirement — Fire-Resistance Rated Construction
Mohammad Baalbaki
08/28/2023
Special inspection requirement — Lighting controls
Mohammad Baalbaki
08/28/2023
Special inspection requirement — Fenestration air leakage
Mohammad Baalbaki
08/28/2023
Special inspection requirement — Maintenance information
Mohammad Baalbaki
08/28/2023
Special inspection requirement — Fenestration areas
Mohammad Baalbaki
08/28/2023
Special inspection requirement — Metering
Mohammad Baalbaki
08/17/2023
Filed — Alteration
THE PURPOSE OF THIS PROJECT IS TO REFURBISH THE EXISTING MIXED-USE BUILDING (STORE AND 2 DWELLING UNITS) AS PER THE SUBMITTED PLANS. PARTIAL INTERIOR DEMOLITION OF NON-LOAD-BEARING WALLS. NO CHANGE TO EXISTING BULK, USE, EGRESS, OR OCCUPANCY.
B00668458-P2
08/17/2023
Filed — Alteration
Plumbing work in conjunction with job # B00668458
B00672954-P4
08/16/2023
Special inspection requirement — Heating Systems
Mohammad Baalbaki
08/16/2023
Special inspection requirement — Energy Code Compliance Inspections
Mohammad Baalbaki
08/16/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
Mohammad Baalbaki
08/16/2023
Special inspection requirement — Mechanical Systems
Mohammad Baalbaki
08/16/2023
Special inspection requirement — Structural Stability – Alterations of existing buildings
Mohammad Baalbaki
08/16/2023
Special inspection requirement — Energy Code Compliance Inspections
Mohammad Baalbaki
06/26/2023
Filed — Alteration
Plumbing work in conjunction with job # B00668458
B00672954-P3
04/28/2023
Filed — Alteration
Plumbing work in conjunction with job # B00668458
B00672954-P2
04/27/2023
Filed — Alteration
THE PURPOSE OF THIS PROJECT IS TO REFURBISH THE EXISTING MIXED-USE BUILDING (STORE AND 2 DWELLING UNITS) AS PER THE SUBMITTED PLANS. PARTIAL INTERIOR DEMOLITION OF NON-LOAD-BEARING WALLS. NO CHANGE TO EXISTING BULK, USE, EGRESS, OR OCCUPANCY.
B00668458-P1
04/27/2023
Filed — Alteration
ADD 3 NAVIEN NCB-240, COMBINATION BOILERS AT CELLAR ONE FOR EACH FLOOR
B00712382-P1
04/27/2023
Filed — Alteration
Plumbing work in conjunction with job # B00668458
B00672954-P1
03/23/2023
Permit issued — Boiler Equipment
B00712382-I1-BE
03/07/2023
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
12/29/2022
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
12/29/2022
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
12/22/2022
Permit issued — Plumbing
B00672954-I1-PL
10/21/2022
Permit issued — Plumbing
B00672954-I1-PL
10/06/2022
Permit issued — Mechanical Systems
B00668458-I1-MS
10/06/2022
Permit issued — Construction Fence
B00712383-I1-FN
Latest 60 of 75 events.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
H L GENERAL CONTRACTORS5307/08/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
12/01/2021$950K—— → —$362/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
BAALBAKI&ASSOCIATES ENGINEERING, PC1411/25/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
B A INSPECTIONS2803/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
H.L. GENERAL CONTRACTORSGeneral Contractor1907/08/2026
KCM PLUMBING & HEATING COPlumbing407/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
BZINSPECTION8294310/03/2023
BAALBAKI&ASSOCIATES ENGIN1858409/18/2023
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWBoiler EquipmentSigned-offKCM PLUMBING & HEATING CO10/19/2023
DOB NOWMechanical SystemsSigned-offH.L. GENERAL CONTRACTORS10/11/2023
DOB NOWBoiler EquipmentSigned-offKCM PLUMBING & HEATING CO03/23/2023
DOB NOWPlumbingSigned-offKCM PLUMBING & HEATING CO12/22/2022
DOB NOWPlumbingSigned-offKCM PLUMBING & HEATING CO10/21/2022
DOB NOWMechanical SystemsSigned-offH.L. GENERAL CONTRACTORS10/06/2022
DOB NOWConstruction FenceSigned-offH.L. GENERAL CONTRACTORS10/06/2022
DOB NOWGeneral ConstructionSigned-offH.L. GENERAL CONTRACTORS10/05/2022
DOB NOWConstruction FenceSigned-offH.L. GENERAL CONTRACTORS04/29/2022
DOB NOWGeneral ConstructionSigned-offH.L. GENERAL CONTRACTORS04/29/2022
DOB NOWGeneral ConstructionSigned-offH.L. GENERAL CONTRACTORS04/29/2022
DOB NOWMechanical SystemsSigned-offH.L. GENERAL CONTRACTORS04/15/2022
DOB NOWMechanical SystemsSigned-offH.L. GENERAL CONTRACTORS04/08/2022
DOB NOWConstruction FenceSigned-offH.L. GENERAL CONTRACTORS04/06/2022
▾Field Inspections (DOB CAP) — 5
DateTypeResultReport
10/20/2023Pass-Final Boiler Equipment InspectionPassView ↗
09/22/2023Pass-Final Boiler Equipment InspectionPassView ↗
03/07/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
12/29/2022Certified Gas-Gas-Piping-RoughingCertifiedView ↗
12/29/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 57
DateRequirementInspectorRole
11/28/2023Energy Code Compliance InspectionsMohammad Baalbakiprogress
11/25/2023Energy Code Compliance InspectionsMohammad Baalbakiprogress
10/04/2023Heating SystemsBarry Bergspecial
10/03/2023Heating SystemsBarry Bergspecial
09/26/2023Fire-Resistant Penetrations and JointsMohammad Baalbakispecial
09/26/2023Maintenance informationMohammad Baalbakienergy_progress
09/26/2023HVAC-R and service water heating system controlsMohammad Baalbakienergy_progress
09/26/2023HVAC-R and service water piping design and insulationMohammad Baalbakienergy_progress
09/26/2023Heating SystemsMohammad Baalbakispecial
09/26/2023HVAC-R and service water heating equipmentMohammad Baalbakienergy_progress
08/28/2023Fenestration and door U-factor and product ratingsMohammad Baalbakienergy_progress
08/28/2023Fire-Resistant Penetrations and JointsMohammad Baalbakispecial
08/28/2023Mechanical SystemsMohammad Baalbakispecial
08/28/2023Heating SystemsMohammad Baalbakispecial
08/28/2023Structural Stability – Alterations of existing buildingsMohammad Baalbakispecial
08/28/2023Interior lighting powerMohammad Baalbakienergy_progress
08/28/2023FinalJOHN MALVASIOprogress
08/28/2023Energy Code Compliance InspectionsMohammad Baalbakiprogress
08/28/2023Fire-Resistance Rated ConstructionMohammad Baalbakiprogress
08/28/2023Lighting controlsMohammad Baalbakienergy_progress
08/28/2023Fenestration air leakageMohammad Baalbakienergy_progress
08/28/2023Maintenance informationMohammad Baalbakienergy_progress
08/28/2023Fenestration areasMohammad Baalbakienergy_progress
08/28/2023MeteringMohammad Baalbakienergy_progress
08/16/2023Heating SystemsMohammad Baalbakispecial
Latest 25 of 57.
▾Documents — 99 on file (BIS + DOB NOW)
▸Plans & Drawings14
▸DOB NOWPlans/Sketch14
08/31/2026B00668458-I1Request digital key ↗
08/31/2026B00668458-P2Request digital key ↗
08/31/2026B00668458-P1Request digital key ↗
Showing 3 of 14 on file for this type
▸Seals & Professional Certifications71
▸DOB NOWProgress Inspector Seal & Signature40
09/28/2026B00672954-I1Open ↗
09/23/2026B00712382-S1Open ↗
09/23/2026B00712382-S1Open ↗
Showing 3 of 40 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature17
09/28/2026B00712382-P2Open ↗
09/23/2026B00712382-I1Open ↗
09/23/2026B00712382-S1Open ↗
Showing 3 of 17 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature14
08/31/2026B00668458-I1Open ↗
08/31/2026B00668458-P2Open ↗
08/31/2026B00668458-P1Open ↗
Showing 3 of 14 on file for this type
▸Environmental & Asbestos13
▸DOB NOWDEP ACP-5: Asbestos Assessment Report13
08/31/2026B00668458-I1Open ↗
08/31/2026B00668458-P2Open ↗
08/31/2026B00668458-P1Open ↗
Showing 3 of 13 on file for this type
▸Energy Compliance1
▸DOB NOWEN2: As Built Energy Analysis1
08/13/2026B00668458-I1Open ↗