← Back
BuildNYC
Cape Cod
246-39 CAMBRIA AVENUE
QUEENS · BIN 4170532
💬 Discuss this project
1955Year Built
1.5Stories
A0Building Class
R2AZoning
1,016 sfGross Floor Area
1Units
1 Active Violation 0 unresolved · 1 paperwork only ▸FDNY Report ↗
Cape Cod · Owner of record: Cambria Properties 246 · 4,900 sf lot · 0.21 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralPlumbing
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Floor 120p · 1 filing · 20 docs
Cellar2p · 1 filing · 20 docs
Site & exterior1p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Cambria Properties103/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Prainito Architect704/21/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Emmanuel Ray Basile703/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Rangasammy Veerapen ConstructionGeneral Contractor603/21/2026
V&B Electrical ContngElectrical103/22/2026
BT's Plumbing and HeatingPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Prainito Architect7432204/21/2022
Triangle Inspection & Tes7495203/07/2022
Building Lifecycle
04/25/2022
Signed off — Alteration
INSATLLATION OF CONNECTION FROM DRYWELL TO LEADERS
Q00516383-I1
04/22/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
Salvatore Prainito
04/22/2022
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
Rajasekhar Sakhamuri
04/22/2022
Special inspection requirement — Concrete - Cast-In-Place
Salvatore Prainito
04/22/2022
Special inspection requirement — Structural Stability – Alterations of existing buildings
Salvatore Prainito
49 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offBT's Plumbing and Heating11/29/2021
DOB NOWFoundationSigned-offRangasammy Veerapen Construction11/09/2021
DOB NOWGeneral ConstructionSigned-offRangasammy Veerapen Construction09/29/2021
2 projects · most recent 12/07/2021
General Wiring
FiledStatusContractorScope
12/07/2021CompleteTimothy Coleman LicensedGeneral Wiring
06/29/2019Permit IssuedV&B Electrical Contng—
▾Field Inspections (DOB CAP) — 3
DateTypeResultReport
04/06/2022Fail-Final General Construction Non-Directive 14FailView ↗
03/18/2022Certified Storm Drainage-ST-Fixtures-FinishCertifiedView ↗
02/18/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
▾Special Inspection Requirements (DOB NOW) — 18
DateRequirementInspectorRole
04/22/2022Fire-Resistant Penetrations and JointsSalvatore Prainitospecial
04/22/2022Subsurface Investigations (Borings/Test Pits)Rajasekhar Sakhamurispecial
04/22/2022Concrete - Cast-In-PlaceSalvatore Prainitospecial
04/22/2022Structural Stability – Alterations of existing buildingsSalvatore Prainitospecial
04/22/2022Energy Code Compliance InspectionsSalvatore Prainitoprogress
04/22/2022Fire-Resistance Rated ConstructionSalvatore Prainitoprogress
04/19/2022Concrete - Cast-In-PlaceSalvatore Prainitospecial
04/19/2022Fire-Resistant Penetrations and JointsSalvatore Prainitospecial
04/19/2022Structural Stability – Alterations of existing buildingsSalvatore Prainitospecial
04/19/2022Subsurface Investigations (Borings/Test Pits)Rajasekhar Sakhamurispecial
04/19/2022Energy Code Compliance InspectionsSalvatore Prainitoprogress
04/19/2022Fire-Resistance Rated ConstructionSalvatore Prainitoprogress
03/11/2022Soil Percolation Test - Private On-Site Storm Water Drainage Disposal Systems, and Detention FacilitiesRajasekhar Sakhamurispecial
03/02/2022Soil Percolation Test - Private On-Site Storm Water Drainage Disposal Systems, and Detention FacilitiesRajasekhar Sakhamurispecial
10/27/2021FinalSERDAR CEYLANprogress
10/27/2021Footing and FoundationSalvatore Prainitoprogress
10/20/2021Footing and FoundationSalvatore Prainitoprogress
10/20/2021Final—progress
53 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account