← Back
Walk-up cooperative
246 5 AVENUE
BROOKLYN · BIN 3020255
💬 Discuss this project
1910Year Built
4Stories
C6Building Class
R6AZoning
6,360 sfGross Floor Area
8Units
Rent Stabilized1 Open Violation ▸FDNY Report ↗
Walk-up cooperative · Owner of record: 246 FIFTH AVE HOUSING CORP · 2,438 sf lot · 2.61 FAR built · Flood zone X
Locations of Work
ArchitectureStructural
Roof2p · 2 filings · 19 docs
Floor 31 filing · 3 docs
Floor 21 filing · 3 docs
Floor 11 filing · 3 docs
Cellar1 filing · 3 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
246 FIFTH AVE HOUSING CORP903/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
ALLAN KLEIN PA401/27/2023
NEW YORK ENGINEERING ASSOC., P.C.110/18/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
JAM CONSULTANTS, INC.803/21/2026
NEW YORK ENGINEERING ASSOCIATES P C203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
FLUE TECH INCGeneral Contractor303/21/2026
GEMINI WATERPROOFING & REGeneral Contractor303/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
AUTOGRAPHIC CO1579201/27/2023
NEW YORK ENGINEERING ASSO851110/18/2022
Building Lifecycle
All (26)Filed (5)Permit Issued (2)Signed Off (1)Violation (9)Special Inspection (9)
06/30/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/20/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
02/01/2023
Signed off — Alteration
General construction and structural work to reconstruct vault inclusive of beam, vault roof, and sidewalk replacement. No change to use, egress, or occupancy.
B00591893-I1
01/27/2023
Filed — Alteration
General construction and structural work to reconstruct vault inclusive of beam, vault roof, and sidewalk replacement. No change to use, egress, or occupancy.
B00591893-P3
01/26/2023
Special inspection requirement — Concrete - Cast-In-Place
asghar Ghodsi
01/26/2023
Special inspection requirement — Structural Stability – Alterations of existing buildings
asghar Ghodsi
01/26/2023
Special inspection requirement — Structural Steel - Details
asghar Ghodsi
01/26/2023
Special inspection requirement — Final
ERIC BERLENT
10/28/2022
Permit issued — General Construction
B07997505-I1-GC
10/18/2022
Filed — Alteration
B07997505-I1
07/25/2022
Permit issued — General Construction
B00591893-I1-GC-CX
03/09/2022
Filed — Alteration
General construction and structural work to reconstruct vault inclusive of beam, vault roof, and sidewalk replacement. No change to use, egress, or occupancy.
B00591893-P2
02/18/2022
Violation issued (HPD, closed)
A
02/18/2022
Violation issued (HPD, closed)
I
10/12/2021
Filed — Alteration
General construction and structural work to reconstruct vault inclusive of beam, vault roof, and sidewalk replacement. No change to use, egress, or occupancy.
B00591893-P1
10/07/2021
Special inspection requirement — Concrete - Cast-In-Place
10/07/2021
Special inspection requirement — Final
10/07/2021
Special inspection requirement — Masonry
10/07/2021
Special inspection requirement — Structural Stability – Alterations of existing buildings
10/07/2021
Special inspection requirement — Structural Steel - Details
09/28/2021
Filed — Alteration
General construction and structural work to reconstruct vault inclusive of beam, vault roof, and sidewalk replacement. No change to use, egress, or occupancy.
B00591893-I1
02/13/2004
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
03/19/2003
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/01/1994
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
08/16/1993
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/01/1993
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedFLUE TECH INC10/28/2022
DOB NOWGeneral ConstructionSigned-offGEMINI WATERPROOFING & RE07/25/2022
Nothing on file for this building.
▾Special Inspection Requirements (DOB NOW) — 9
DateRequirementInspectorRole
01/26/2023Concrete - Cast-In-Placeasghar Ghodsispecial
01/26/2023Structural Stability – Alterations of existing buildingsasghar Ghodsispecial
01/26/2023Structural Steel - Detailsasghar Ghodsispecial
01/26/2023FinalERIC BERLENTprogress
10/07/2021Concrete - Cast-In-Place—special
10/07/2021Final—progress
10/07/2021Masonry—special
10/07/2021Structural Stability – Alterations of existing buildings—special
10/07/2021Structural Steel - Details—special
▾Documents — 19 on file (BIS + DOB NOW)
▸Plans & Drawings5
▸DOB NOWPlans/Sketch5
09/01/2026B00591893-I1Request digital key ↗
09/01/2026B00591893-P1Request digital key ↗
09/01/2026B00591893-P3Request digital key ↗
Showing 3 of 5 on file for this type
▸Seals & Professional Certifications9
▸DOB NOWDPL-1: Design Professional Seal & Signature5
09/01/2026B00591893-I1Open ↗
09/01/2026B00591893-P3Open ↗
09/01/2026B00591893-P2Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature3
09/01/2026B00591893-P3Open ↗
09/01/2026B00591893-P3Open ↗
09/01/2026B00591893-P3Open ↗
▸DOB NOWProgress Inspector Seal & Signature1
09/01/2026B00591893-P3Open ↗
▸Environmental & Asbestos5
▸DOB NOWDEP ACP-5: Asbestos Assessment Report5
09/01/2026B00591893-I1Open ↗
09/01/2026B00591893-P3Open ↗
09/01/2026B00591893-P2Open ↗
Showing 3 of 5 on file for this type