DOB09/01/2021FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
DOB03/19/2021THE BOROUGH COMMISSIONER HAS ORDERED ALL WORK STOPPED IN REFERENCE TO EMERGENCY DECLARATION IN WHICH HPD MUST PERFORM ABATEMENT/STOP ALL WOR K EXCEPT TO MAKE SITE SAFE
DOB09/16/2020FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
DOB09/02/2020FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
DOB09/02/2020FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
ECB06/23/2020FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER. AT TIME OF INSPECTION EXPOSURE #3 WALL AT REAR OF PREMISES HAS EXTENSIVE BOWING WITH ROTTED AND EXPOSED WOODEN MEMBERS WITH BRICKS THAT HAVE DISLODGED AND$6K due
DOB06/18/2020V-DOB VIOLATION - ACTIVE
ECB05/30/2020FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT.AT THE TIME OF INSPECTION REAR EXTERIOR WALL COLLAPSE ON REAR YARD OF 248 54 STREET BROOKLYN NOTE:WALL WAS IN STATE OF DISREPAIR WITH SECTION ROTTED CAUSE AND WITH$25K due
ECB05/29/2020OBSERVED REAR WALL AT EXPO # 03 PARTIALLY COLLAPSED 2ND TO 3RD FLOOR LEVEL. REMAINING REAR WALL DISLODGED, BULGING INTERIOR & EXTERIOR WITH WALL SEPARATION FROM FLOOR. FLOORINGS ARE SLOPING TOWARD REAR AND CREA$6K due
ECB06/02/2021PERMIT HOLDER FAILED TO ENSURE WORKERS ATTEND PRE-SHIFT MEETING.NOTE AT THE TIME OF INSPECTION OF A 3 STORY DEMO SITE IN PROGRESS THAT CONSISTS OF DEMO WORK.UPON REQUEST FOR PRE-SHIFT SAFETY MEETING BEFORE COMMNothing owed — awaiting certificate of correction