← Back
One story - permanent living quarter
246-59 86 ROAD
QUEENS · BIN 4175989
💬 Discuss this project
1950Year Built
1.5Stories
A2Building Class
R2AZoning
929 sfGross Floor Area
1Units
0 Open ViolationsFDNY Report ↗
One story - permanent living quarter · 4,100 sf lot · 0.23 FAR built · Flood zone X
Locations of Work
Architecture
Roof1p · 1 filing · 20 docs
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
10/11/2024$625K—— → —$673/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
SOLANKI ENGINEERING, PC402/24/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
JP HOME CONSTRUCTION CORPGeneral Contractor104/09/2026
L & N PLUMBING, INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
SOLANKI ENGINEERING, P.C.8451402/24/2026
Building Lifecycle
All (65)Filed (4)Permit Issued (2)Signed Off (2)Violation (5)Inspection (4)Objection (18)Special Inspection (30)
03/30/2026
Signed off — Alteration
SUBSEQUENT FILING FOR THE LEGALIZATION OF NEW PLUMBING FIXTURES THROUGHOUT DWELLING. GAS METER IS SHOWN INSIDE DWELLING UNIT AND ELECTRIC DRYER ONLY. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
Q01169014-S2
02/27/2026
Special inspection requirement — Energy Code Compliance Inspections
Ashray Solanki
02/27/2026
Special inspection requirement — Maintenance information
Ashray Solanki
02/27/2026
Special inspection requirement — HVAC-R and service water heating equipment
Ashray Solanki
02/27/2026
Special inspection requirement — HVAC-R and service water heating system controls
Ashray Solanki
02/27/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
Ashray Solanki
02/27/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Ashray Solanki
02/24/2026
Filed — Alteration
SUBSEQUENT FILING FOR THE LEGALIZATION OF NEW PLUMBING FIXTURES THROUGHOUT DWELLING. GAS METER IS SHOWN INSIDE DWELLING UNIT AND ELECTRIC DRYER ONLY. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
Q01169014-P2
12/24/2025
Signed off — Alteration
SUBSEQUENT FILING FOR THE LEGALIZATION OF NEW PLUMBING FIXTURES THROUGHOUT DWELLING. GAS METER IS SHOWN INSIDE DWELLING UNIT AND ELECTRIC DRYER ONLY. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
Q01169014-I1
12/22/2025
Violation issued (ECB, closed)
Construction
12/12/2025
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
12/12/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
12/12/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
12/03/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
10/24/2025
Filed — Alteration
SUBSEQUENT FILING FOR THE LEGALIZATION OF NEW PLUMBING FIXTURES THROUGHOUT DWELLING. GAS METER IS SHOWN INSIDE DWELLING UNIT AND ELECTRIC DRYER ONLY. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
Q01169014-P1
10/24/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Ashray Solanki
10/24/2025
Special inspection requirement — HVAC-R and service water heating equipment
Ashray Solanki
10/24/2025
Special inspection requirement — Maintenance information
Ashray Solanki
10/24/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
Ashray Solanki
10/24/2025
Special inspection requirement — HVAC-R and service water heating system controls
Ashray Solanki
10/24/2025
Special inspection requirement — Energy Code Compliance Inspections
Ashray Solanki
10/23/2025
Permit issued — Plumbing
Q01169014-S2-PL
06/24/2025
Permit issued — Structural
Q01169014-I1-GC-CX
03/20/2025
Objection raised — Other
03/20/2025
Objection resolved — Addressed
03/18/2025
Filed — Alteration
SUBSEQUENT FILING FOR THE LEGALIZATION OF NEW PLUMBING FIXTURES THROUGHOUT DWELLING. GAS METER IS SHOWN INSIDE DWELLING UNIT AND ELECTRIC DRYER ONLY. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
Q01169014-S2
03/09/2025
Objection resolved — Addressed
03/09/2025
Objection resolved — Addressed
03/09/2025
Objection resolved — Addressed
03/09/2025
Objection resolved — Addressed
03/09/2025
Objection resolved — Addressed
03/09/2025
Objection resolved — Addressed
03/09/2025
Objection resolved — Addressed
03/09/2025
Objection resolved — Addressed
02/25/2025
Objection raised — Other
02/12/2025
Objection raised — Zoning
02/12/2025
Objection raised — Structural
02/12/2025
Objection raised — Other
02/12/2025
Objection raised — Other
02/12/2025
Objection raised — Scope
02/12/2025
Objection raised — Admin
02/12/2025
Objection raised — Scope
01/22/2025
Filed — Alteration
SUBSEQUENT FILING FOR THE LEGALIZATION OF NEW PLUMBING FIXTURES THROUGHOUT DWELLING. GAS METER IS SHOWN INSIDE DWELLING UNIT AND ELECTRIC DRYER ONLY. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
Q01169014-I1
01/18/2025
Special inspection requirement — HVAC-R and service water heating system controls
Ashray Solanki
01/18/2025
Special inspection requirement — Interior lighting power
Ashray Solanki
01/18/2025
Special inspection requirement — Fenestration areas
Ashray Solanki
01/18/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
Ashray Solanki
01/18/2025
Special inspection requirement — HVAC-R and service water heating equipment
Ashray Solanki
01/18/2025
Special inspection requirement — Insulation placement and R values
Ashray Solanki
01/18/2025
Special inspection requirement — Maintenance information
Ashray Solanki
01/18/2025
Special inspection requirement — Permanent certificate
Ashray Solanki
01/18/2025
Special inspection requirement — Duct leakage testing, insulation and design
Ashray Solanki
01/18/2025
Special inspection requirement — Metering
Ashray Solanki
01/18/2025
Special inspection requirement — Air barrier - visual inspection
Ashray Solanki
01/18/2025
Special inspection requirement — Fenestration air leakage
Ashray Solanki
01/18/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
Ashray Solanki
01/18/2025
Special inspection requirement — Mechanical Systems
Ashray Solanki
01/18/2025
Special inspection requirement — Concrete - Cast-In-Place
Ashray Solanki
01/18/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Ashray Solanki
01/18/2025
Special inspection requirement — Subgrade Inspections
Ashray Solanki
Latest 60 of 65 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offL & N PLUMBING, INC10/23/2025
DOB NOWStructuralSigned-offJP HOME CONSTRUCTION CORP06/24/2025
1 project · most recent 04/28/2025
General Wiring
FiledStatusContractorScope
04/28/2025CompleteACCURATE ELEC'L CORP.General Wiring
▾Field Inspections (DOB CAP) — 4
DateTypeResultReport
12/12/2025Certified Gas-Gas-Piping-RoughingCertifiedView ↗
12/12/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
12/12/2025Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
12/03/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
▾Special Inspection Requirements (DOB NOW) — 35
DateRequirementInspectorRole
02/27/2026Energy Code Compliance InspectionsAshray Solankiprogress
02/27/2026Maintenance informationAshray Solankienergy_progress
02/27/2026HVAC-R and service water heating equipmentAshray Solankienergy_progress
02/27/2026HVAC-R and service water heating system controlsAshray Solankienergy_progress
02/27/2026HVAC-R and service water piping design and insulationAshray Solankienergy_progress
02/27/2026Fire-Resistant Penetrations and JointsAshray Solankispecial
10/24/2025Fire-Resistant Penetrations and JointsAshray Solankispecial
10/24/2025HVAC-R and service water heating equipmentAshray Solankienergy_progress
10/24/2025Maintenance informationAshray Solankienergy_progress
10/24/2025HVAC-R and service water piping design and insulationAshray Solankienergy_progress
10/24/2025HVAC-R and service water heating system controlsAshray Solankienergy_progress
10/24/2025Energy Code Compliance InspectionsAshray Solankiprogress
01/18/2025HVAC-R and service water heating system controlsAshray Solankienergy_progress
01/18/2025Interior lighting powerAshray Solankienergy_progress
01/18/2025Fenestration areasAshray Solankienergy_progress
01/18/2025HVAC-R and service water piping design and insulationAshray Solankienergy_progress
01/18/2025HVAC-R and service water heating equipmentAshray Solankienergy_progress
01/18/2025Insulation placement and R valuesAshray Solankienergy_progress
01/18/2025Maintenance informationAshray Solankienergy_progress
01/18/2025Permanent certificateAshray Solankienergy_progress
01/18/2025Duct leakage testing, insulation and designAshray Solankienergy_progress
01/18/2025MeteringAshray Solankienergy_progress
01/18/2025Air barrier - visual inspectionAshray Solankienergy_progress
01/18/2025Fenestration air leakageAshray Solankienergy_progress
01/18/2025Structural Stability – Alterations of existing buildingsAshray Solankispecial
Latest 25 of 35.
▾Documents — 29 on file (BIS + DOB NOW)
▸Plans & Drawings4
▸DOB NOWPlans/Sketch4
08/17/2026Q01169014-P2Request digital key ↗
08/17/2026Q01169014-P1Request digital key ↗
08/17/2026Q01169014-S2Request digital key ↗
Showing 3 of 4 on file for this type
▸Zoning, Tax Lot & Property Records5
▸DOB NOWRestrictive Declaration/Easement 14
08/17/2026Q01169014-P1Open ↗
08/17/2026Q01169014-S2Open ↗
08/13/2026Q01169014-P2Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWZD1: DOB Zoning Diagram1
08/13/2026Q01169014-I1Open ↗
▸Seals & Professional Certifications13
▸DOB NOWProgress Inspector Seal & Signature6
08/31/2026Q01169014-S2Open ↗
08/31/2026Q01169014-S2Open ↗
08/28/2026Q01169014-P1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature4
08/17/2026Q01169014-P1Open ↗
08/17/2026Q01169014-S2Open ↗
08/13/2026Q01169014-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature3
08/31/2026Q01169014-S2Open ↗
08/28/2026Q01169014-P1Open ↗
08/24/2026Q01169014-I1Open ↗
▸Environmental & Asbestos4
▸DOB NOWDEP ACP-5: Asbestos Assessment Report4
08/17/2026Q01169014-P1Open ↗
08/17/2026Q01169014-S2Open ↗
08/13/2026Q01169014-P2Open ↗
Showing 3 of 4 on file for this type
▸Other Documents3
▸DOB NOWSite Survey: Initial1
08/13/2026Q01169014-I1Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone1
08/13/2026Q01169014-I1Open ↗
▸DOB NOWPlot Diagram1
08/13/2026Q01169014-I1Open ↗