← Back
BuildNYC
BROOKLYN
246 CENTRAL AVENUE
BROOKLYN · BIN 3430606
💬 Discuss this project
—Year Built
—Stories
—Building Class
—Zoning
—Gross Floor Area
—Units
5 Active Violations ▸
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingFire ProtectionEquipmentLandscapeGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
RoofTemporary roof protection installationUnder Construction104p · 2 filings · 20 docs
BulkheadUnder Construction9p · 1 filing · 20 docs
Floor 6Temporary roof protection installationUnder Construction12p · 1 filing · 16 docs
Floor 5Temporary roof protection installationUnder Construction243p · 2 filings · 20 docs
Floor 4Temporary roof protection installationUnder Construction243p · 2 filings · 20 docs
Floor 3Temporary roof protection installationUnder Construction235p · 2 filings · 20 docs
Floor 2Temporary roof protection installationUnder Construction244p · 2 filings · 20 docs
Floor 1Temporary roof protection installationUnder Construction243p · 2 filings · 20 docs
CellarUnder Construction240p · 1 filing · 20 docs
Site & exteriorOne Central Ave LLCUnder Construction164p · 3 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
One Central Ave309/03/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Paul G. Jones, P.E808/20/2026
Architecture Outfit1608/17/2026
Brian Goldman, Architect102/23/2023
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
M. Early Plumbing & HeatingFire Protection109/03/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Domani Inspection Service8431508/17/2026
Building Lifecycle
All (177)Filed (25)Permit Issued (54)Signed Off (1)Violation (11)Inspection (4)Objection (52)Special Inspection (30)
09/02/2026
Permit issued — Sprinklers
B00708599-S7-EW-SP
08/20/2026
Filed — Alteration
INSTALLATION OF A HEAVY DUTY SIDEWALK SHED AND MEDIUM DUTY PIPE SCAFFOLD AS PER PLANS DURING NB CONSTRUCTION WORK. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED & PIPE SCAFFOLD TO COMPLY WITH CHAPTER 33 OF NYC BUILDING CODE OF 2022.
B01085388-P6
08/17/2026
Filed — New Building
Filing for new plumbing system as per plan filed herewith in subsequent filing under the NB application
B00708599-P8
08/13/2026
Filed — Alteration
INSTALLATION OF A HEAVY DUTY SIDEWALK SHED AND MEDIUM DUTY PIPE SCAFFOLD AS PER PLANS DURING NB CONSTRUCTION WORK. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED & PIPE SCAFFOLD TO COMPLY WITH CHAPTER 33 OF NYC BUILDING CODE OF 2022.
B01085388-P5
08/03/2026
Permit issued — Supported Scaffold
B01085388-I1-SH
08/03/2026
Violation issued (ECB, open)
Construction
08/03/2026
Violation issued (ECB, open)
Construction
08/03/2026
Violation issued (ECB, open)
Construction
08/03/2026
Violation issued (ECB, open)
Unknown
07/01/2026
Signed off — New Building
Filing for new plumbing system as per plan filed herewith in subsequent filing under the NB application
B00708599-S3
06/24/2026
Permit issued — Plumbing
B00708599-S5-PL
06/23/2026
Special inspection requirement — Concrete - Cast-In-Place
JOHN MCMONAGLE
06/23/2026
Special inspection requirement — Final
JOHN MCMONAGLE
06/23/2026
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
JOHN MCMONAGLE
06/23/2026
Special inspection requirement — Footing and Foundation
JOHN MCMONAGLE
06/23/2026
Special inspection requirement — Subgrade Inspections
JOHN MCMONAGLE
06/23/2026
Special inspection requirement — Subsurface Conditions – Fill Placement & In-Place Density
JOHN MCMONAGLE
06/23/2026
Special inspection requirement — Energy Code Compliance Inspections
JOHN MCMONAGLE
06/11/2026
Permit issued — Support of Excavation
B00708599-S3-SE
06/11/2026
Permit issued — General Construction
B00708599-I1-GC
06/11/2026
Permit issued — Foundation
B00708599-S1-FO
06/11/2026
Permit issued — Construction Fence
B00818200-I1-FN
06/04/2026
Permit issued — Mechanical Systems
B00708599-S6-MS
06/03/2026
Special inspection requirement — Vestibules
JOHN MCMONAGLE
06/03/2026
Special inspection requirement — Insulation placement and R values
JOHN MCMONAGLE
06/03/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
JOHN MCMONAGLE
06/03/2026
Special inspection requirement — Energy Code Compliance Inspections
JOHN MCMONAGLE
06/03/2026
Special inspection requirement — Interior lighting power
JOHN MCMONAGLE
06/03/2026
Special inspection requirement — Fire-Resistance Rated Construction
JOHN MCMONAGLE
06/03/2026
Special inspection requirement — Lighting in dwelling units
JOHN MCMONAGLE
06/03/2026
Special inspection requirement — Sprayed fire-resistant materials
JOHN MCMONAGLE
06/03/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
JOHN MCMONAGLE
06/03/2026
Special inspection requirement — Masonry
JOHN MCMONAGLE
06/03/2026
Special inspection requirement — Exterior lighting power
JOHN MCMONAGLE
06/03/2026
Special inspection requirement — Air barrier - visual inspection
JOHN MCMONAGLE
06/03/2026
Special inspection requirement — Fenestration areas
JOHN MCMONAGLE
06/03/2026
Special inspection requirement — Protection of exposed foundation insulation
JOHN MCMONAGLE
06/03/2026
Special inspection requirement — Preliminary
JOHN MCMONAGLE
06/03/2026
Special inspection requirement — Electrical motors and elevators
JOHN MCMONAGLE
06/03/2026
Special inspection requirement — Lighting controls
JOHN MCMONAGLE
06/03/2026
Special inspection requirement — Air barrier — testing
JOHN MCMONAGLE
06/03/2026
Special inspection requirement — Metering
JOHN MCMONAGLE
06/03/2026
Special inspection requirement — Fenestration air leakage
JOHN MCMONAGLE
06/03/2026
Special inspection requirement — Wall Panels, Curtain Walls, and Veneers
JOHN MCMONAGLE
06/01/2026
Permit issued — Supported Scaffold
B01085388-I1-SF
06/01/2026
Permit issued — Protection and Mechanical Methods
B01085388-S1-PMM
06/01/2026
Permit issued — Supported Scaffold
B01085388-I1-SH
03/31/2026
Violation issued (ECB, closed)
Construction
03/31/2026
Violation issued (ECB, closed)
Construction
03/31/2026
Violation issued (ECB, closed)
Construction
03/31/2026
Violation issued (ECB, closed)
Construction
03/30/2026
Filed — New Building
Filing for new plumbing system as per plan filed herewith in subsequent filing under the NB application
B00708599-P6
03/19/2026
Permit issued — Mechanical Systems
B00708599-S6-MS
03/19/2026
Permit issued — Foundation
B00708599-S1-FO
03/19/2026
Permit issued — Support of Excavation
B00708599-S3-SE
03/18/2026
Permit issued — Construction Fence
B00818200-I1-FN
03/17/2026
Permit issued — General Construction
B00708599-I1-GC
01/05/2026
Violation issued (ECB, open)
Unknown
01/05/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
JOHN MCMONAGLE
01/05/2026
Special inspection requirement — Masonry
JOHN MCMONAGLE
Latest 60 of 177 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSprinklersPermit IssuedM. Early Plumbing & Heating09/02/2026
DOB NOWSupported ScaffoldPermit IssuedConsolidated Scaffolding08/03/2026
DOB NOWPlumbingPermit IssuedM. Early Plumbing & Heating06/24/2026
DOB NOWSupport of ExcavationSigned-offJCT Development NY06/11/2026
DOB NOWGeneral ConstructionPermit IssuedJCT Development NY06/11/2026
DOB NOWFoundationPermit IssuedJCT Development NY06/11/2026
DOB NOWConstruction FencePermit IssuedJCT Development NY06/11/2026
DOB NOWMechanical SystemsPermit IssuedJCT Development NY06/04/2026
DOB NOWSupported ScaffoldPermit IssuedConsolidated Scaffolding06/01/2026
DOB NOWProtection and Mechanical MethodsPermit IssuedConsolidated Scaffolding06/01/2026
DOB NOWSupported ScaffoldPermit IssuedConsolidated Scaffolding06/01/2026
DOB NOWMechanical SystemsPermit IssuedJCT Development NY03/19/2026
DOB NOWFoundationPermit IssuedJCT Development NY03/19/2026
DOB NOWSupport of ExcavationSigned-offJCT Development NY03/19/2026
DOB NOWConstruction FencePermit IssuedJCT Development NY03/18/2026
DOB NOWGeneral ConstructionPermit IssuedJCT Development NY03/17/2026
DOB NOWSupport of ExcavationSigned-offJCT Development NY12/30/2025
DOB NOWGeneral ConstructionPermit IssuedJCT Development NY12/04/2025
DOB NOWFoundationPermit IssuedJCT Development NY11/28/2025
DOB NOWConstruction FencePermit IssuedJCT Development NY11/28/2025
DOB NOWMechanical SystemsPermit IssuedJCT Development NY11/28/2025
DOB NOWStructuralPermit IssuedJCT Development NY11/28/2025
DOB NOWConstruction FencePermit IssuedJCT Development NY11/14/2025
DOB NOWFoundationPermit IssuedJCT Development NY11/13/2025
DOB NOWFoundationPermit IssuedJCT Development NY10/27/2025
DOB NOWConstruction FencePermit IssuedJCT Development NY10/24/2025
DOB NOWSprinklersPermit IssuedM. Early Plumbing & Heating09/15/2025
DOB NOWPlumbingPermit IssuedM. Early Plumbing & Heating06/11/2025
DOB NOWSidewalk ShedPermit IssuedConsolidated Scaffolding06/03/2025
DOB NOWProtection and Mechanical MethodsPermit IssuedConsolidated Scaffolding06/03/2025
DOB NOWSupported ScaffoldPermit IssuedConsolidated Scaffolding06/03/2025
DOB NOWGeneral ConstructionPermit IssuedJCT Development NY03/18/2025
DOB NOWFoundationPermit IssuedJCT Development NY02/19/2025
DOB NOWStructuralPermit IssuedJCT Development NY02/19/2025
DOB NOWMechanical SystemsPermit IssuedJCT Development NY02/19/2025
DOB NOWConstruction FencePermit IssuedJCT Development NY10/24/2024
DOB NOWSprinklersPermit IssuedM. Early Plumbing & Heating09/19/2024
DOB NOWProtection and Mechanical MethodsPermit IssuedConsolidated Scaffolding07/24/2024
DOB NOWSupported ScaffoldPermit IssuedConsolidated Scaffolding07/24/2024
DOB NOWSidewalk ShedPermit IssuedConsolidated Scaffolding07/24/2024
+ 10 more permits on file
3 projects · most recent 06/30/2025
General Wiring
FiledStatusContractorScope
06/30/2025Permit IssuedAmpacity ElectricalGeneral Wiring
12/19/2024Permit IssuedTF ElectricalGeneral Wiring
08/07/2024Permit IssuedSolas Electrical—
1 project · most recent 08/17/2026
FiledStatusContractorScope
08/17/2026Permit IssuedM. Early Plumbing & Heating2 scope_items
2 projects · most recent 08/20/2026
Scaffold Sidewalk Shed Fence
FiledStatusContractorScope
08/20/2026Permit IssuedConsolidated ScaffoldingScaffold, Sidewalk Shed
02/23/2023Permit IssuedJCT Development NYFence
▾Field Inspections (DOB CAP) — 4
DateTypeResultReport
08/29/2025Certified Storm Drainage-ST-Piping-RoughingCertifiedView ↗
08/29/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
05/23/2025Certified Sprinkler - SP - RoughingCertifiedView ↗
06/13/2024Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 114
DateRequirementInspectorRole
06/23/2026Concrete - Cast-In-PlaceJOHN MCMONAGLEspecial
06/23/2026Footing and FoundationJOHN MCMONAGLEprogress
06/23/2026FinalJOHN MCMONAGLEprogress
06/23/2026Energy Code Compliance InspectionsJOHN MCMONAGLEprogress
06/23/2026Subsurface Investigations (Borings/Test Pits)JOHN MCMONAGLEspecial
06/23/2026Subsurface Conditions – Fill Placement & In-Place DensityJOHN MCMONAGLEspecial
06/23/2026Subgrade InspectionsJOHN MCMONAGLEspecial
06/03/2026Fenestration air leakageJOHN MCMONAGLEenergy_progress
06/03/2026Lighting controlsJOHN MCMONAGLEenergy_progress
06/03/2026Fenestration and door U-factor and product ratingsJOHN MCMONAGLEenergy_progress
06/03/2026Protection of exposed foundation insulationJOHN MCMONAGLEenergy_progress
06/03/2026Insulation placement and R valuesJOHN MCMONAGLEenergy_progress
06/03/2026Interior lighting powerJOHN MCMONAGLEenergy_progress
06/03/2026VestibulesJOHN MCMONAGLEenergy_progress
06/03/2026Lighting in dwelling unitsJOHN MCMONAGLEenergy_progress
06/03/2026MeteringJOHN MCMONAGLEenergy_progress
06/03/2026Air barrier — testing JOHN MCMONAGLEenergy_progress
06/03/2026Electrical motors and elevatorsJOHN MCMONAGLEenergy_progress
06/03/2026Exterior lighting powerJOHN MCMONAGLEenergy_progress
06/03/2026Air barrier - visual inspectionJOHN MCMONAGLEenergy_progress
06/03/2026Fenestration areasJOHN MCMONAGLEenergy_progress
06/03/2026MasonryJOHN MCMONAGLEspecial
06/03/2026Sprayed fire-resistant materialsJOHN MCMONAGLEspecial
06/03/2026Fire-Resistant Penetrations and JointsJOHN MCMONAGLEspecial
06/03/2026Wall Panels, Curtain Walls, and VeneersJOHN MCMONAGLEspecial
Latest 25 of 114.
▾Documents — 10 on file (BIS + DOB NOW)
▸Seals & Professional Certifications10
▸DOB NOWProgress Inspector Seal & Signature7
09/17/2026B00708599-P9Open ↗
09/01/2026B00708599-P5Open ↗
09/01/2026B00708599-P5Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature3
09/17/2026B00708599-P9Open ↗
09/01/2026B00708599-P5Open ↗
08/29/2026B00708599-I1Open ↗