ECB07/15/2025Artoi observed a second floor enclosed deck at the rear exp 3 with the full roof removed., obtain required demolition permit$5K due
ECB07/15/2025Atoi observed new HVAC mini split line sets with bx cable electric power throughout the house., obtain permit$2K due
ECB07/15/2025Atoi observed garage split in half. Front for storage back used as living space with lighting and ac. Cellar converted to living space. 2 br with full 3 piece bath. Cofo states cellar to be used for storage and$2K due
ECB07/15/2025Atoi observed new electric recessed lights, wires hanging openended at boxes, approx 40 recessed lights. New switches and outlets out of walls. New outlets in basement newly built walls., obtain permit$2K due
ECB07/15/2025Atoi observed interior renovation. New walls, cellar built into living space, garage wall buil to split garage half into living space., obtain permit$2K due
ECB07/15/2025Atoi observed plumbing in new built bathroom in cellar. Shower body, new tub, toilet and sink roughs., obtain permit$2K due