ECB06/23/2005FAILURE TO PROVIDE PROTECTION AT SIDES OF EXCAVATION.NO SHORING,BRACING,UNDERPINNING,SHEETING OR GUARD RAIL HAS BEEN PROVIDED.REMEDY:STOP ALL WORK EXCEPT TO PROVIDE PROTECTION.$-131 due
ECB02/12/2005FAILURE TO PROVIDE 8 FT HIGH FENCE WHERE REQUIRED DURING EXCAVATION OPERATION. 10 FT DEEPX 20W X 20 FT LENGTH HAS BEEN EXCAVATION AT REAR OF PROPERTY WITHOUT 8 FT HIGH FENCE PROVIDED. REMEDY:PROVIDE 8 FT HIGH$-25 due
ECB02/12/2005FAILURE TO PROVIDE ADEQUATE HOUSEKEEPING VARIOUS CONSTRUCTION DEBRIS &MATERIALS STORED OUT SIDE AND REAR YARD OF PREMISES. REMEDY:MAINATAIN ADEQUATE HOUSEKEEPING.$-26 due
ECB02/12/2005FAILURE TO PROVIDE PROTECTION AT SIDES OF EXCAVATION 10 FT DEEP X 20 FEET WIDE X 20 FT LENGTH AT REAR OF PREMISES NO B SHORING, C BRACING, DUNDERPINNING AND E GUARD RAIL FENCE HAS BEEN PROVIDED. REMEDY:PROVIDE$-134 due
ECB02/12/2005FAILURE TO PROTECT ADJOINING STRUCTURES DURING EXCAVATION OPERATIONS. EXCAVATION AT REAR OF PROPERTY TO DEVELOPE STRESS CRACKS. REMEDY:STOP ALL WORK IMMEDIATELY EXCEPT TO PROVIDE PROTECTION$-131 due
ECB10/15/2004FAILURE TO MAINTAIN ADEQUATE HOUSE KEEPING. NOTED. THE DIRT FROM THE APPROXIMATE 9 FEET DEEP EXCAVATED REAR YARD IS NOW STORED APPROXIMATE FROM (4) FEET HIGH AT THE WEST AND NORTH SIDE OF REAR YARD, WITHOUT$-26 due
ECB10/08/2004FAILURE TO PROVIDE 8 FOOT HIGH FENCE WHERE REQUIRED DURING EXCAVATION OPERATION 10FT DEEP X 20W X 20 FT LENGTH HAS BEEN EXCAVATED AT REAR OF PROPERTY NO 8 FT FENCE PROVIDED REMEDY:PROVIDE 8FT HIGH FENCE$-25 due
ECB10/08/2004FAILURE TO PROVIDE PROTECTION AT SIDES OF EXCAVATION 10FT DEEP X 20FT W X 20FT LENGTH HAS BEEN EXCAVATED AT REAR OF PREMISE NOB)SHORING C)BRACING D)UNDERPINNING E)GUARDRAIL FENCE HAS BEEN PROVIDED.REMEDY:PROVID$-52 due
ECB10/08/2004NO GUARD RAILS AT 1ST FLOOR DOOR LEADING TO REAR NO GUARD RAIL ALSO ATADJACENT PROEPRTY APPROX DROP OF 12-10FT REMEDY:PROVIDE GUARD RAILS$-52 due
ECB10/08/2004NO JOB SITE FENCE AT SIDES OF PREMISE ALSO REAR NO FENCE.REMEDY:PROVIDE JOB SITE FENCE.REMEDY:PROVIDE JOB SITE FENCE$-52 due
ECB10/04/2004FAILURE TO COMPLY WITH THE COMMISSIONER'S ORDER #CORRECT THE VIOLATINGCONDITION, AND FILE A CERTIFICATE OF CORRECTION WITH THE N.Y. DEPARTMENT OF BUILDING FOR NOTICE OF VIOLATION 34432235P-052206 CERJM04. NOTED$-150 due
ECB06/23/2005FAILURE TO PROVIDE ADEQUATE HOUSEKEEPING.CONSTRUCTION MATERIALS BEING STORED AT REAR YARD.REMEDY:MAINTAIN ADEQUATE HOUSEKEEPING.Nothing owed — awaiting certificate of correction
ECB02/12/2005FAILURE TO MAINTAIN CHIMNEY AT REAR OF PREMISES SPALLING BRICK AND MASONRY JOINTS AND BRICK IS PULLING AWAY FROM GROUND FLOOR TO ROOF. REMEDY:MAINTAIN AND REPAIR.Nothing owed — awaiting certificate of correction
ECB02/12/2005NO JOB SITE FENCE AT SIDEWALK AND REAR OF PREMISES. REMEDY:PROVIDE JOBSITE FENCE.Nothing owed — awaiting certificate of correction
ECB10/15/2004FAILURE TO PROVIDE 8 FOOT HIGH FENCE WHERE REQUIRED DURING EXCAVATION OPERATIONS: NOTE: APPROXIMATE 20"FT X 36"FEET OF THE REAR YARD HAS BEEN EXCAVATED APPROXIMATE 9 FEET DEEP AND NO FENCE PROVIDED AT THE SIDESNothing owed — awaiting certificate of correction
ECB10/08/2004FAILURE TO PROTECT ADJOING STRUCTURES DURING EXCAVATION OPERATION 10FTDEEP X 20FT L AREA HAS BEEN EXCAVATED AT REAR OF PREMISES CAUSING CHI MNEY STRESS ATTACHED ADJACENT PROPERT TO TO DEVELOP STRESS CRACKSNothing owed — awaiting certificate of correction
ECB05/22/2004WORK WITHOUT PERMIT AT REAR OF ABOVE PREMISES EXQAUATED AREA APPROX 10' DEEP X 20 X 20 TO MAKE EXTENSION ON EXISTING PREMISES EXCAVATION UNDERMING ADJACENT PROEPRTY NO PERMITS ON PLANS AT SITE REMEDY:STOP ALLNothing owed — awaiting certificate of correction