← Back
Predominantly retail with other uses
246 UTICA AVENUE
BROOKLYN · BIN 3037077
💬 Discuss this project
1925Year Built
2Stories
K4Building Class
C4-3Zoning
2,060 sfGross Floor Area
1Units
0 Open ViolationsFDNY Report ↗
Predominantly retail with other uses · Owner of record: W.K. PARK 1, LLC · 1,173 sf lot · 1.76 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
P&Y MGNT LLC703/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
CHON ENGINEERING204/12/2022
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
HINKE, WILLIAMElectrical103/21/2026
JACKUS, STEVEElectrical103/21/2026
AVON PLBG & HTG INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
CHON ENGINEERING PC2454204/12/2022
Building Lifecycle
All (8)Filed (2)Permit Issued (1)Violation (3)Inspection (1)Special Inspection (1)
04/12/2022
Filed — Alteration
TO REPALCE EXISTING GAS PIPING TO GAS EQUIPMENT AND COMMERCIAL APPLIANCES DUE TO GAS LEAK.
B00697166-P2
04/12/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
Steve Chon
03/31/2022
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
03/18/2022
Permit issued — Plumbing
B00697166-I1-PL
03/16/2022
Filed — Alteration
TO REPALCE EXISTING GAS PIPING TO GAS EQUIPMENT AND COMMERCIAL APPLIANCES DUE TO GAS LEAK.
B00697166-I1
03/02/2022
Violation issued (FDNY_ORDER, closed)
03/16/1999
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
05/04/1998
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offAVON PLBG & HTG INC03/18/2022
1 project · most recent 04/12/2022
Gas
FiledStatusContractorScope
04/12/2022Signed-offAVON PLBG & HTG INCGas
▾Field Inspections (DOB CAP) — 1
DateTypeResultReport
03/31/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
▾Special Inspection Requirements (DOB NOW) — 1
DateRequirementInspectorRole
04/12/2022Fire-Resistant Penetrations and JointsSteve Chonspecial
▾Documents — 7 on file (BIS + DOB NOW)
▸Plans & Drawings2
▸DOB NOWPlans/Sketch2
08/30/2026B00697166-P2Request digital key ↗
08/30/2026B00697166-I1Request digital key ↗
▸Seals & Professional Certifications3
▸DOB NOWDPL-1: Design Professional Seal & Signature2
08/30/2026B00697166-P2Open ↗
08/30/2026B00697166-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature1
09/01/2026B00697166-I1Open ↗
▸Environmental & Asbestos2
▸DOB NOWDEP ACP-5: Asbestos Assessment Report2
08/30/2026B00697166-P2Open ↗
08/30/2026B00697166-I1Open ↗