246 WEST 18TH STREET
MANHATTAN · Chelsea-Hudson Yards · BIN 1013857
💬 Discuss this project
1915Year Built
5Stories
C7Building Class
C6-2AZoning
15,371 sfGross Floor Area
40Units
Rent Stabilized100 Open Violations 99 unresolved · 1 paperwork only ▸
Walk-up apt, over six families with stores · Owner of record: 246 WEST 18TH STREET LAND LLC · 4,598 sf lot · 3.34 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingFire ProtectionEquipmentGeneral
Permit Issued — active, not yet Signed-off
RoofUnder Construction2p · 2 filings
Bulkhead1p · 1 filing · 1 doc
Floor 8Under Construction1p · 1 filing
Floor 7
Floor 6
Floor 51p · 1 filing
Floor 41p · 1 filing
Floor 31p · 1 filing
Floor 22p · 2 filings
Floor 11p · 1 filing
Cellar1p · 1 filing
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
SKYLINE SCAFFOLDING GROUP3509/13/2026
ALLTECH CONSTRUCTION GROUP209/01/2026
W V CONTRACTORS NIC408/29/2026
ALL STATE 12 GENERAL CON307/08/2026
246-18 REALTY1403/22/2026
246 WEST 18TH STREET LAND LLC403/21/2026
246-18 REALTY LLC /DIRECT MGT.CO1003/21/2026
246-18 REALTY LLC DIRECT MGT1803/21/2026
246 WEST 18TH ASSOCIATES103/21/2026
CHELSEA103/21/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
08/05/2024$10.5M—246-18 REALTY LLC → 246 WEST 18TH STREET LAND LLC$683/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
RYDE706/15/2026
RIGID STRUCTURAL DESIGN, LLC1905/19/2026
KESHAV ENGINEERING LLC103/02/2026
PLAN B ENGINEERING402/24/2026
STRUCTURAL ENGINEERING TECHNOLOGIES601/08/2026
RASESH DOSHI201/08/2026
FNA ENGINEERING SERVICES PC212/01/2025
ART OF FORM, ARCHITECTS212/13/2023
CAMERON ENGINEERING310/25/2022
WSP108/02/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
ART OF FORM ARCHITECTS1203/21/2026
Rigid Structural Design, LLC2603/21/2026
PINE RE CONSULTING1303/21/2026
A1 EXPEDITING SERVICE803/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
SKYLINE SCAFFOLDING GROUPGeneral Contractor1508/30/2026
W.V CONTRACTORS NIC CORPGeneral Contractor1207/19/2026
PRIME PIPING & HEATING INFire Protection306/28/2026
OLIVER CHRISTOPHERElectrical203/21/2026
FLINT MECHANICAL CORPPlumbing107/08/2026
HARARI DAVIDElectrical103/21/2026
PRIME PIPING & HEATING INPlumbing106/28/2026
MARIO CASTROElectrical103/21/2026
ALL STATE 12 GENERAL CONTRACTINGGeneral Contractor107/08/2026
ALLTECH CONSTRUCTION GRGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
RI CONSULTING SERVICES IN8904208/18/2026
DELTA TESTING LABS6871404/23/2026
Building Lifecycle
All (263)Filed (49)Permit Issued (32)Signed Off (2)Violation (60)Inspection (14)Objection (76)Special Inspection (30)
08/28/2026
Permit issued — Sidewalk Shed
M01234902-I1-SH
08/18/2026
Filed — Alteration
SUSPENDED SCAFFOLD OUTRIGGER SYSTEM FOR MATERIAL HOIST FOR RESTORATION WORK.
M01406821-P1
08/18/2026
Violation issued (ECB, open)
Unknown
08/18/2026
Special inspection requirement — Alternative Materials - OTCR Buildings Bulletin Number
MD ISLAM
08/18/2026
Special inspection requirement — Post-installed Anchors
MD ISLAM
08/13/2026
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
07/21/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
07/17/2026
Permit issued — General Construction
M01135836-I1-GC
07/17/2026
Permit issued — Construction Fence
M01163538-I1-FN
07/13/2026
Inspection — Pass-Final PL - Up to 9 Requested Floors
Pass
View inspection ↗
07/01/2026
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
06/16/2026
Permit issued — Suspended Scaffold
M01406821-I1-SC
06/16/2026
Permit issued — Protection and Mechanical Methods
M01135836-Z4-PMM
06/15/2026
Filed — New Building
11 story, 21 dwellings new building
M01135836-Z4
06/11/2026
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
RICHARD GREENWALD
06/11/2026
Special inspection requirement — Maintenance information
RICHARD GREENWALD
06/11/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
RICHARD GREENWALD
06/11/2026
Special inspection requirement — HVAC-R and service water heating system controls
RICHARD GREENWALD
06/11/2026
Special inspection requirement — HVAC-R and service water heating equipment
RICHARD GREENWALD
06/11/2026
Special inspection requirement — Soil Percolation Test - Private On-Site Storm Water Drainage Disposal Systems, and Detention Facilities
RICHARD GREENWALD
06/11/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
RICHARD GREENWALD
06/11/2026
Special inspection requirement — Post-installed Anchors
RICHARD GREENWALD
06/10/2026
Objection resolved — Addressed
06/05/2026
Filed — New Building
11 story, 21 dwellings new building
M01135836-Z3
06/05/2026
Permit issued — Protection and Mechanical Methods
M01135836-Z3-PMM
06/05/2026
Objection raised — Other
06/04/2026
Permit issued — Sidewalk Shed
M01234902-I1-SH
06/01/2026
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
05/26/2026
Filed — Alteration
SUSPENDED SCAFFOLD OUTRIGGER SYSTEM FOR MATERIAL HOIST FOR RESTORATION WORK.
M01406821-I1
05/19/2026
Filed — Alteration
Installation of a temporary needle beam per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
M01352304-P3
05/14/2026
Permit issued — Protection and Mechanical Methods
M01287999-I1-PMM
05/14/2026
Permit issued — Protection and Mechanical Methods
M01135836-S8-PMM
05/14/2026
Permit issued — Protection and Mechanical Methods
M01352304-I1-PMM
05/14/2026
Permit issued — Supported Scaffold
M01234915-I1-SF
05/13/2026
Filed — Alteration
Installation of a temporary SUPPORTED SCAFFOLD & SITE SPECIFICENGINEERED ENCLOSURE and plywood enclosure per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
M01234915-P6
05/13/2026
Permit issued — Protection and Mechanical Methods
M01343377-I1-PMM
04/29/2026
Violation issued (HPD, open)
A
04/23/2026
Filed — New Building
11 story, 21 dwellings new building
M01135836-P6
04/21/2026
Filed — Alteration
Installation of a temporary SUPPORTED SCAFFOLD & SITE SPECIFICENGINEERED ENCLOSURE and plywood enclosure per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
M01234915-P5
04/20/2026
Filed — Alteration
Installation of a temporary needle beam per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
M01352304-P2
04/15/2026
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
04/15/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
04/14/2026
Filed — Alteration
Installation of a temporary SUPPORTED SCAFFOLD & SITE SPECIFICENGINEERED ENCLOSURE and plywood enclosure per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
M01234915-P4
04/07/2026
Signed off — Alteration
PLACEMENT AND USE OF KNUCKLEBOOM ON SIDEWALK AND ROADWAY FOR HOISTING MATERIALS FOR NEW BUILDING CONJUNCTION WITH M01135836-I1
M01365939-I1
04/03/2026
Permit issued — Mechanical Systems
M01135836-S6-MS
04/03/2026
Permit issued — General Construction
M01135836-I1-GC
04/01/2026
Violation issued (ECB, open)
Construction
04/01/2026
Special inspection requirement — Post-installed Anchors
RICHARD GREENWALD
04/01/2026
Special inspection requirement — Concrete - Cast-In-Place
RICHARD GREENWALD
04/01/2026
Special inspection requirement — Final
RICHARD GREENWALD
04/01/2026
Special inspection requirement — Air barrier — testing
RICHARD GREENWALD
04/01/2026
Special inspection requirement — Fire-Resistance Rated Construction
RICHARD GREENWALD
04/01/2026
Special inspection requirement — Air barrier - visual inspection
RICHARD GREENWALD
04/01/2026
Special inspection requirement — Protection of exposed foundation insulation
RICHARD GREENWALD
04/01/2026
Special inspection requirement — Insulation placement and R values
RICHARD GREENWALD
04/01/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
RICHARD GREENWALD
04/01/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
RICHARD GREENWALD
04/01/2026
Special inspection requirement — Fenestration air leakage
RICHARD GREENWALD
04/01/2026
Special inspection requirement — Air barrier continuity plan testing
RICHARD GREENWALD
04/01/2026
Special inspection requirement — Fenestration areas
RICHARD GREENWALD
Latest 60 of 263 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSidewalk ShedPermit IssuedSKYLINE SCAFFOLDING GROUP08/28/2026
DOB NOWGeneral ConstructionPermit IssuedW.V CONTRACTORS NIC CORP07/17/2026
DOB NOWConstruction FencePermit IssuedW.V CONTRACTORS NIC CORP07/17/2026
DOB NOWSuspended ScaffoldPermit IssuedALLTECH CONSTRUCTION GR06/16/2026
DOB NOWProtection and Mechanical MethodsPermit IssuedW.V CONTRACTORS NIC CORP06/16/2026
DOB NOWProtection and Mechanical MethodsPermit IssuedW.V CONTRACTORS NIC CORP06/05/2026
DOB NOWSidewalk ShedPermit IssuedSKYLINE SCAFFOLDING GROUP06/04/2026
DOB NOWProtection and Mechanical MethodsPermit IssuedSKYLINE SCAFFOLDING GROUP05/14/2026
DOB NOWProtection and Mechanical MethodsPermit IssuedSKYLINE SCAFFOLDING GROUP05/14/2026
DOB NOWProtection and Mechanical MethodsPermit IssuedSKYLINE SCAFFOLDING GROUP05/14/2026
DOB NOWSupported ScaffoldPermit IssuedSKYLINE SCAFFOLDING GROUP05/14/2026
DOB NOWProtection and Mechanical MethodsPermit IssuedSKYLINE SCAFFOLDING GROUP05/13/2026
DOB NOWMechanical SystemsPermit IssuedW.V CONTRACTORS NIC CORP04/03/2026
DOB NOWGeneral ConstructionPermit IssuedW.V CONTRACTORS NIC CORP04/03/2026
DOB NOWSprinklersPermit IssuedA M B MECHANICAL INC03/25/2026
DOB NOWStandpipePermit IssuedA M B MECHANICAL INC03/24/2026
DOB NOWProtection and Mechanical MethodsSigned-offALL STATE 12 GENERAL CONT03/04/2026
DOB NOWProtection and Mechanical MethodsPermit IssuedSKYLINE SCAFFOLDING GROUP02/10/2026
DOB NOWProtection and Mechanical MethodsPermit IssuedSKYLINE SCAFFOLDING GROUP01/30/2026
DOB NOWProtection and Mechanical MethodsPermit IssuedSKYLINE SCAFFOLDING GROUP01/23/2026
DOB NOWStandpipePermit IssuedA M B MECHANICAL INC01/21/2026
DOB NOWProtection and Mechanical MethodsPermit IssuedSKYLINE SCAFFOLDING GROUP01/08/2026
DOB NOWGeneral ConstructionPermit IssuedW.V CONTRACTORS NIC CORP12/17/2025
DOB NOWStructuralPermit IssuedW.V CONTRACTORS NIC CORP12/17/2025
DOB NOWPlumbingPermit IssuedPRIME PIPING & HEATING IN12/16/2025
DOB NOWPlumbingPermit IssuedFLINT MECHANICAL CORP11/20/2025
DOB NOWFoundationPermit IssuedW.V CONTRACTORS NIC CORP10/30/2025
DOB NOWSupport of ExcavationPermit IssuedW.V CONTRACTORS NIC CORP10/16/2025
DOB NOWFull DemolitionSigned-offW.V CONTRACTORS NIC CORP08/19/2025
DOB NOWConstruction FencePermit IssuedW.V CONTRACTORS NIC CORP07/16/2025
DOB NOWSupported ScaffoldPermit IssuedSKYLINE SCAFFOLDING GROUP06/27/2025
DOB NOWSidewalk ShedPermit IssuedSKYLINE SCAFFOLDING GROUP06/27/2025
BISPLISSUEDULTIMATE PLBG AND HTG COR04/23/2019
BISMHISSUEDARIEL SERVICES INC03/13/2019
BISPLISSUEDULTIMATE PLBG AND HTG COR04/20/2018
BISOTISSUEDINNOVATIVE CONSTRUCTION04/10/2018
BISFPISSUEDALLIED FIRE CONTROL SVCS07/01/2014
BISFPISSUEDALLIED FIRE CONTROL SVCS01/29/2014
BISPLISSUEDARIEL SERVICES INC09/06/2012
BISPLISSUEDARIEL SERVICES INC01/30/2012
+ 17 more permits on file
1 project · most recent 10/25/2022
Air Conditioning Systems Heating and Air Conditioning Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
10/25/2022——Air Conditioning Systems, Heating and Air Conditioning Systems, Ventilation Systems
Cooling
Lg ARUN038GSS4 3 tons · Vrf Outdoor ×1
Heat / Cool
Lg ARUM121BTE5 10 tons · Vrf Outdoor ×2
ARUM168BTE5 14 tons · Vrf Outdoor ×2
ARUN024GSS4 2 tons · Vrf Outdoor ×2
ARUM036GSSS 3 tons · Condensing Unit ×1
ARUM072BTE5 6 tons · Vrf Outdoor ×1
ARUM096BTE5 8 tons · Vrf Outdoor ×1
ARUN038GSS4 3 tons · Vrf Outdoor ×1
Ventilation
Aaon RN-020-8-0-K60E-122 3,462 CFM · Erv ×1
2 projects · most recent 06/15/2026
Sprinkler System
FiledStatusContractorScope
06/15/2026Permit IssuedPRIME PIPING & HEATING INSprinkler System
10/25/2022——Sprinkler System
2 projects · most recent 06/15/2026
Gas Storm Water/Sanitary
FiledStatusContractorScope
06/15/2026Permit IssuedPRIME PIPING & HEATING IN—
10/25/2022——Gas, Storm, Water/Sanitary
4 projects · most recent 03/24/2026
General Wiring
FiledStatusContractorScope
03/24/2026Permit IssuedTITAN ELEC'L & ELEV CONTR—
02/05/2026Permit IssuedOMD ELECTRICAL CORP—
12/19/2025Permit IssuedOMD ELECTRICAL CORPGeneral Wiring
06/04/2025Permit IssuedTOP SHELF ELECTRIC CORP—
2 projects · most recent 06/15/2026
Concrete Steel Masonry
FiledStatusContractorScope
06/15/2026Permit IssuedW.V CONTRACTORS NIC CORPConcrete
08/02/2022——Steel, Masonry
2 projects · most recent 05/13/2026
Scaffold Sidewalk Shed
FiledStatusContractorScope
05/13/2026Permit IssuedSKYLINE SCAFFOLDING GROUPScaffold
01/05/2026Permit IssuedSKYLINE SCAFFOLDING GROUPSidewalk Shed
1 project · most recent 08/18/2026
Suspended Scaffold (SC)
FiledStatusContractorScope
08/18/2026Permit IssuedALLTECH CONSTRUCTION GRSuspended Scaffold (SC)
▾Field Inspections (DOB CAP) — 14
DateTypeResultReport
08/13/2026Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
07/21/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
07/13/2026Pass-Final PL - Up to 9 Requested FloorsPassView ↗
07/01/2026Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
06/01/2026Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
04/15/2026Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
04/15/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
02/13/2026Certified StandPipe - SD - Hydrostatic 63/09 Test (Initial 75 Feet)CertifiedView ↗
01/29/2026Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
01/29/2026Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
11/21/2025Fail-Final PL - Up to 3 Requested FloorsFailView ↗
08/01/2025Certified Gas-Gas-Piping-RoughingCertifiedView ↗
08/01/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
08/01/2025Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 101
DateRequirementInspectorRole
08/18/2026Post-installed AnchorsMD ISLAMspecial
08/18/2026Alternative Materials - OTCR Buildings Bulletin NumberMD ISLAMspecial
06/11/2026Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationRICHARD GREENWALDspecial
06/11/2026Post-installed AnchorsRICHARD GREENWALDspecial
06/11/2026HVAC-R and service water heating equipmentRICHARD GREENWALDenergy_progress
06/11/2026Maintenance informationRICHARD GREENWALDenergy_progress
06/11/2026HVAC-R and service water piping design and insulationRICHARD GREENWALDenergy_progress
06/11/2026HVAC-R and service water heating system controlsRICHARD GREENWALDenergy_progress
06/11/2026Soil Percolation Test - Private On-Site Storm Water Drainage Disposal Systems, and Detention FacilitiesRICHARD GREENWALDspecial
06/11/2026Fire-Resistant Penetrations and JointsRICHARD GREENWALDspecial
04/01/2026Fenestration areasRICHARD GREENWALDenergy_progress
04/01/2026Energy Code Compliance InspectionsRICHARD GREENWALDprogress
04/01/2026Protection of exposed foundation insulationRICHARD GREENWALDenergy_progress
04/01/2026Fire-Resistance Rated ConstructionRICHARD GREENWALDprogress
04/01/2026Air barrier — testing RICHARD GREENWALDenergy_progress
04/01/2026Post-installed AnchorsRICHARD GREENWALDspecial
04/01/2026Fire-Resistant Penetrations and JointsRICHARD GREENWALDspecial
04/01/2026FinalRICHARD GREENWALDprogress
04/01/2026Fenestration air leakageRICHARD GREENWALDenergy_progress
04/01/2026Insulation placement and R valuesRICHARD GREENWALDenergy_progress
04/01/2026Air barrier continuity plan testingRICHARD GREENWALDenergy_progress
04/01/2026Fenestration and door U-factor and product ratingsRICHARD GREENWALDenergy_progress
04/01/2026Air barrier - visual inspectionRICHARD GREENWALDenergy_progress
04/01/2026Concrete - Cast-In-PlaceRICHARD GREENWALDspecial
12/26/2025Concrete - Cast-In-PlaceRICHARD GREENWALDspecial
Latest 25 of 101.
▾Documents — 478 on file (BIS + DOB NOW)
▸Plans & Drawings45
▸DOB NOWPlans/Sketch45
08/28/2026M08041166-I1Request digital key ↗
08/24/2026M01163527-I1Request digital key ↗
08/23/2026M01163538-I1Request digital key ↗
Showing 3 of 45 on file for this type
▸Applications & Permits58
▸BISPLAN / WORK APPROVAL APPLICATION33
01/07/2026141028625Open ↗
10/18/2022123916628Open ↗
03/13/2019123596894Open ↗
Showing 3 of 33 on file for this type
▸BISWORK PERMIT APPLICATION22
03/13/2019123596894Open ↗
04/20/2018140748029Open ↗
04/10/2018140748029Open ↗
Showing 3 of 22 on file for this type
▸BISPLAN - WORK & PERMITS - SUPPPORTING DOCUMENTATION1
01/07/2026141028625Open ↗
▸BISBPP-5 - Authorization to the Department of Transportation1
01/07/2026141028625Open ↗
▸BISPLAN - WORK & PERMITS - SUPPPORTING DOCUMENTATION1
08/02/2010120239214Open ↗
▸Zoning, Tax Lot & Property Records8
▸DOB NOWZD1: DOB Zoning Diagram3
08/13/2026M01135836-I1Open ↗
08/13/2026M01135836-P3Open ↗
08/13/2026M00502161-I1Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp2
08/13/2026M01135836-P3Open ↗
08/13/2026M01135836-I1Open ↗
▸DOB NOWZoning Exhibit form (1-5)2
08/13/2026M01135836-P3Open ↗
08/13/2026M01135836-I1Open ↗
▸BISZONING DIAGRAM1
08/02/2010120239214Open ↗
▸Seals & Professional Certifications160
▸DOB NOWDPL-1: Design Professional Seal & Signature44
09/02/2026M00738814-I1Open ↗
08/24/2026M01163527-I1Open ↗
08/20/2026M01234902-P3Open ↗
Showing 3 of 44 on file for this type
▸DOB NOWProgress Inspector Seal & Signature41
09/13/2026M01135836-S4Open ↗
09/13/2026M01135836-S4Open ↗
09/13/2026M01135836-S4Open ↗
Showing 3 of 41 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION31
11/15/2022123916628Open ↗
03/26/2019123596894Open ↗
03/13/2019123596894Open ↗
Showing 3 of 31 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature30
09/23/2026M01135836-S7Open ↗
09/13/2026M01135836-S4Open ↗
09/13/2026M01135836-S4Open ↗
Showing 3 of 30 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST4
03/13/2019123596894Open ↗
09/19/2011120694472Open ↗
Showing 2 of 4 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM3
09/19/2011120694472Open ↗
Showing 1 of 3 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT2
03/13/2019123596894Open ↗
03/14/2018140748029Open ↗
▸BISAPPLICANT OWNER SIGNATURE2
01/07/2026141028625Open ↗
04/03/2015140324423Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY2
01/07/2026141028625Open ↗
03/14/2018140748029Open ↗
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION1
03/14/2018140748029Open ↗
▸Trade Schedules & Equipment41
▸BISSCHEDULE B - PLUMBING14
03/14/2018140748029Open ↗
04/03/2015140324423Open ↗
11/17/2011120694472Open ↗
Showing 3 of 14 on file for this type
▸BISSELF-CERT PLUMBING NOTICE10
10/25/2012120239214Open ↗
08/07/2012120025882Open ↗
07/31/2012120025882Open ↗
Showing 3 of 10 on file for this type
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE5
05/24/2018140748029Open ↗
05/21/2018140748029Open ↗
05/18/2018140748029Open ↗
Showing 3 of 5 on file for this type
▸BISEQUIPMENT USE PERMITS3
03/26/2019123596894Open ↗
04/29/2011120158587Open ↗
04/29/2011120158587Open ↗
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)2
08/13/2026M00502161-I1Open ↗
Showing 1 of 2 on file for this type
▸BISEQUIPMENT USE APPLICATION/PERMIT1
03/26/2019123596894Open ↗
▸BISPLUMBING - SUPPORTING DOCUMENTATION1
05/26/2010120045003Open ↗
▸DOB NOWElectric Cut-Off1
08/13/2026M01163527-I1Open ↗
▸DOB NOWGas Cut-Off1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWWater Cut-Off1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWStandpipe Alarms Drawings1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWSewer Cut-Off1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Safety & Tenant Protection11
▸BISSTREET TREE CHECKLIST5
01/07/2026141028625Open ↗
01/29/2013120045003Open ↗
12/07/2012120239214Open ↗
Showing 3 of 5 on file for this type
▸BISTenant Protection Plan and Notes2
03/13/2019123596894Open ↗
03/14/2018140748029Open ↗
▸DOB NOWStreet Tree Checklist2
08/13/2026M01135836-I1Open ↗
08/13/2026M01135836-P3Open ↗
▸BISST-1 Street Tree Checklist1
07/14/2010120239214Open ↗
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Environmental & Asbestos16
▸BISASBESTOS: CERTIFICATION (DEP ACP5)7
03/13/2019123596894Open ↗
03/14/2018140748029Open ↗
09/17/2015122503647Open ↗
Showing 3 of 7 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'5
01/19/2010120243655Open ↗
Showing 1 of 5 on file for this type
▸DOB NOWDEP ACP-5: Asbestos Assessment Report2
08/24/2026M01163527-I1Open ↗
Showing 1 of 2 on file for this type
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER1
01/07/2010120239214Open ↗
▸DOB NOWRodent Control1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Energy Compliance7
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY3
03/19/2018140748029Open ↗
03/14/2018140748029Open ↗
04/03/2015140324423Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS2
03/26/2019123596894Open ↗
03/13/2019123596894Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS1
03/14/2018140748029Open ↗
▸BISAS-BUILT ENERGY ANALYSIS1
03/26/2019123596894Open ↗
▸Inspections & Test Reports7
▸BISTECHNICAL REPORT: RESPONSIBILITY3
03/23/2018140748029Open ↗
03/14/2018140748029Open ↗
04/03/2015140324423Open ↗
▸DOB NOWSOIL REPORT2
08/13/2026M01135836-S2Open ↗
08/13/2026M01135836-P2Open ↗
▸BISTECHNICAL REPORT: CONCRETE-TEST CYLINDER1
07/22/2010120200852Open ↗
▸DOB NOWTR4 Test Report and Plot Diagram1
08/13/2026M01135836-S2Open ↗
▸Approvals, Objections & Sign-offs27
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST14
03/26/2019123596894Open ↗
01/29/2013120207114Open ↗
01/29/2013120045003Open ↗
Showing 3 of 14 on file for this type
▸BISADMINISTRATIVE OBJECTIONS7
09/19/2011120694472Open ↗
01/19/2010120243655Open ↗
Showing 2 of 7 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION5
07/22/2010120200852Open ↗
Showing 1 of 5 on file for this type
▸BISBPP-8 - Request Items for Builders Pavement Plan Signoff1
01/07/2026141028625Open ↗
▸Cost, Insurance & Ownership28
▸BISCOST AFFIDAVIT28
11/15/2022123916628Open ↗
03/26/2019123596894Open ↗
03/13/2019123596894Open ↗
Showing 3 of 28 on file for this type
▸Filing & Intake Forms29
▸BISEFILING COVER SHEET13
10/18/2022123916628Open ↗
03/13/2019123596894Open ↗
09/17/2015122503647Open ↗
Showing 3 of 13 on file for this type
▸BISADDITIONAL INFORMATION9
05/24/2018140748029Open ↗
05/21/2018140748029Open ↗
06/21/2012120207114Open ↗
Showing 3 of 9 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET4
01/07/2026141028625Open ↗
03/14/2018140748029Open ↗
04/03/2015140324423Open ↗
Showing 3 of 4 on file for this type
▸BISBOROUGH INTAKE FORM3
03/26/2019123596894Open ↗
05/24/2018140748029Open ↗
05/18/2018140748029Open ↗
▸Other Documents41
▸DOB NOWDHCR Document16
08/13/2026M00502161-S3Open ↗
08/13/2026M00502161-S1Open ↗
08/13/2026M01135836-P3Open ↗
Showing 3 of 16 on file for this type
▸BISSupporting Document: Fee Exempt6
08/02/2010120239214Open ↗
04/20/2010120207114Open ↗
04/20/2010120207114Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWProperty Ownership Certification3
08/24/2026M01163527-I1Open ↗
08/16/2026M01135836-P3Open ↗
08/16/2026M01135836-I1Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸DOB NOWSite Survey: Initial2
08/13/2026M01135836-P3Open ↗
08/13/2026M01135836-I1Open ↗
▸DOB NOWCalculations2
08/19/2026M01406821-P1Open ↗
08/14/2026M01406821-I1Open ↗
▸DOB NOWManufacturer's Specifications2
08/19/2026M01406821-P1Open ↗
08/14/2026M01406821-I1Open ↗
▸BISPLOT DIAGRAM1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISRECORDS MGMT FEE PAYMENT RECEIPT1
01/07/2026141028625Open ↗
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION1
09/19/2011120045003Open ↗
▸DOB NOWFull Demo: 10-Day Notice1
08/13/2026M01163527-I1Open ↗
▸DOB NOWCommunity Board Notification1
08/13/2026M01163527-I1Open ↗
▸DOB NOWStructure Photographs1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWAdjoining Owners Notification1
08/13/2026M01135836-S1Open ↗