Professional building / stand-alone funeral home
2460 FLATBUSH AVENUE
BROOKLYN · BIN 3241969
💬 Discuss this project
1950Year Built
2Stories
O7Building Class
C8-1Zoning
8,000 sfGross Floor Area
6Units
1 Open Violation ▸FDNY Report ↗
Professional building / stand-alone funeral home · Owner of record: FLATBUSH REALTY HOLDINGS ACQUISITIONS LL C · 4,000 sf lot · 2 FAR built · Flood zone X500
Locations of Work
ArchitectureStructuralMechanicalPlumbingFire ProtectionCivilGeneral
Roof8p · 4 filings · 20 docs
Bulkhead1p · 1 filing · 16 docs
Floor 23p · 2 filings · 20 docs
Floor 16p · 2 filings · 20 docs
Cellar4p · 2 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
FLATBUSH REALTY HOLDINGS LLC4909/13/2026
BROOKDALE MEDICAL ASSOC203/21/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
03/20/2023$3.3M—FLATBUSH REALTY HOLDINGS LLC → FLATBUSH REALTY HOLDINGS ACQUISITIONS LLC$412/sf building
03/07/2014$2.4M—BUDGET WINES & LIQUORS INC. → FLATBUSH REALTY HOLDINGS LLC$300/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
AA BLDG & INSP SVC LLC106/29/2026
THE MTM DESIGN GROUP, LLC408/20/2025
ENGINEERING PROFESSIONAL SERVICE P.804/29/2025
YOUN DESIGN CORP.111/17/2024
SELF EMPLOYED105/09/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
MARIA903/21/2026
CONSTRUCTION PERMIT SERVICES403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
ALLIED RESTORATION CORPGeneral Contractor707/14/2026
ATLANTA TRA&ENG CO.LLCGeneral Contractor404/09/2026
PREMIER CONSTRUCT SVC LLCGeneral Contractor204/09/2026
H BRONNER & SON PLBG & HTGPlumbing207/08/2026
AURA PLUMBING INCPlumbing107/08/2026
NEPTUNE SIGNS AWNINGSScaffold107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
AA BUILDING & INSPECTION1519806/29/2026
THE MTM DESIGN GROUP, LLC1319408/20/2025
Building Lifecycle
All (148)Filed (15)Permit Issued (13)Signed Off (9)Violation (20)Inspection (11)Objection (58)Special Inspection (22)
07/16/2026
Signed off — Alteration
Filing application for certificate of compliance for equipment since it was not uploaded in Appl. #B00853101 and all work done in that application. No change in egress, use or occupancy.
B01410930-I1
07/13/2026
Permit issued — Mechanical Systems
B01410930-I1-MS
06/29/2026
Filed — Alteration
Filing application for certificate of compliance for equipment since it was not uploaded in Appl. #B00853101 and all work done in that application. No change in egress, use or occupancy.
B01410930-I1
06/02/2026
Special inspection requirement — Mechanical Systems
Younes Abouyaala
06/02/2026
Special inspection requirement — Final
NAVEEN KUMAR
06/01/2026
Signed off — Alteration
FILING TO DEMOLISH SOME INTERIOR WALLS. NO CHANGE IN EGRESS, USE OR OCCUPANCY.
B00871122-I1
05/18/2026
Signed off — Alteration
FILING TO ENLARGE WINDOW OPENINGS AND REPLACE WITH NEW WINDOWS, INSTALL STUCCO OVER EXISTING EXTERIOR BRICK, INTERIOR PARTITION, BATHROOMS, PANTRY AND REPLACE MECHANICAL UNITS. NO CHANGE IN EGRESS, USE OR OCCUPANCY.
B00853101-I1
04/20/2026
Signed off — Alteration
FILING TO AMEND GREATER THAN 1/2 PSIG TO LESS THAN 1/2 PSIG. NO CHANGE IN EGRESS, USE OR OCCUPANCY.
B00871124-I1
12/09/2025
Signed off — Alteration
Installation of new VERIZON site on the roof. Installation of 3 sectors (12 antennas) with associated parts, 9 RRHs, 4 GPS antennas, 3 OVPs and 1 equipment platform with 3 related cabinets. Related conduits on facade and service connection in basement.
B01087635-I1
12/09/2025
Signed off — Alteration
Installation of new VERIZON site on the roof. Installation of 3 sectors (12 antennas) with associated parts, 9 RRHs, 4 GPS antennas, 3 OVPs and 1 equipment platform with 3 related cabinets. Related conduits on facade and service connection in basement.
B01087635-S3
12/09/2025
Signed off — Alteration
Installation of new VERIZON site on the roof. Installation of 3 sectors (12 antennas) with associated parts, 9 RRHs, 4 GPS antennas, 3 OVPs and 1 equipment platform with 3 related cabinets. Related conduits on facade and service connection in basement.
B01087635-S2
11/25/2025
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
08/29/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
08/27/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Robert Toms
08/20/2025
Filed — Alteration
Installation of new VERIZON site on the roof. Installation of 3 sectors (12 antennas) with associated parts, 9 RRHs, 4 GPS antennas, 3 OVPs and 1 equipment platform with 3 related cabinets. Related conduits on facade and service connection in basement.
B01087635-P1
07/31/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
06/17/2025
Permit issued — Plumbing
B01087635-S2-PL
06/02/2025
Permit issued — General Construction
B01087635-S3-GC-CX
06/02/2025
Permit issued — Antenna
B01087635-I1-AN
05/28/2025
Signed off — Alteration
FILING TEMPORARY CONSTRUCTION FENCE. NO CHANGE IN EGRESS, USE OR OCCUPANCY.
B00865166-I1
05/16/2025
Inspection — Fail-Final General Construction Non-Directive 14
Fail
View inspection ↗
05/07/2025
Special inspection requirement — Final
NAVEEN KUMAR
05/07/2025
Special inspection requirement — HVAC-R and service water heating equipment
Younes Abouyaala
05/07/2025
Special inspection requirement — Mechanical Systems
Younes Abouyaala
05/07/2025
Special inspection requirement — Exterior Insulation and Finish Systems (EIFS)
Younes Abouyaala
04/29/2025
Filed — Alteration
FILING TO ENLARGE WINDOW OPENINGS AND REPLACE WITH NEW WINDOWS, INSTALL STUCCO OVER EXISTING EXTERIOR BRICK, INTERIOR PARTITION, BATHROOMS, PANTRY AND REPLACE MECHANICAL UNITS. NO CHANGE IN EGRESS, USE OR OCCUPANCY.
B00853101-P2
03/14/2025
Permit issued — General Construction
B01087635-S3-GC-CX
03/14/2025
Permit issued — Antenna
B01087635-I1-AN
02/13/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Younes Abouyaala
02/05/2025
Special inspection requirement — Exterior Insulation and Finish Systems (EIFS)
Younes Abouyaala
02/05/2025
Special inspection requirement — Mechanical Systems
Younes Abouyaala
02/05/2025
Special inspection requirement — Final
NAVEEN KUMAR
02/05/2025
Special inspection requirement — HVAC-R and service water heating equipment
Younes Abouyaala
01/28/2025
Signed off — Alteration
B01140340-I1
01/17/2025
Inspection — Pass-Final Sign Permit Inspection
Pass
View inspection ↗
12/10/2024
Permit issued — Sign
B01140340-I1-SG
11/17/2024
Filed — Alteration
B01140340-I1
11/12/2024
Filed — Alteration
FILING TO ENLARGE WINDOW OPENINGS AND REPLACE WITH NEW WINDOWS, INSTALL STUCCO OVER EXISTING EXTERIOR BRICK, INTERIOR PARTITION, BATHROOMS, PANTRY AND REPLACE MECHANICAL UNITS. NO CHANGE IN EGRESS, USE OR OCCUPANCY.
B00853101-P1
11/11/2024
Filed — Alteration
FILING TO AMEND GREATER THAN 1/2 PSIG TO LESS THAN 1/2 PSIG. NO CHANGE IN EGRESS, USE OR OCCUPANCY.
B00871124-P3
10/29/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Younes Abouyaala
10/21/2024
Inspection — Fail-Final General Construction Non-Directive 14
Fail
View inspection ↗
10/21/2024
Special inspection requirement — HVAC-R and service water heating equipment
Younes Abouyaala
10/21/2024
Special inspection requirement — Exterior Insulation and Finish Systems (EIFS)
Younes Abouyaala
10/21/2024
Special inspection requirement — Mechanical Systems
Younes Abouyaala
10/21/2024
Special inspection requirement — Final
NAVEEN KUMAR
09/16/2024
Objection resolved — Addressed
09/12/2024
Objection resolved — Addressed
09/11/2024
Objection resolved — Addressed
09/11/2024
Objection resolved — Addressed
09/09/2024
Objection raised — Other
09/09/2024
Objection raised — Other
09/09/2024
Objection raised — Other
09/09/2024
Objection raised — Admin
08/29/2024
Filed — Alteration
Installation of new VERIZON site on the roof. Installation of 3 sectors (12 antennas) with associated parts, 9 RRHs, 4 GPS antennas, 3 OVPs and 1 equipment platform with 3 related cabinets. Related conduits on facade and service connection in basement.
B01087635-I1
08/29/2024
Filed — Alteration
Installation of new VERIZON site on the roof. Installation of 3 sectors (12 antennas) with associated parts, 9 RRHs, 4 GPS antennas, 3 OVPs and 1 equipment platform with 3 related cabinets. Related conduits on facade and service connection in basement.
B01087635-S3
08/29/2024
Filed — Alteration
Installation of new VERIZON site on the roof. Installation of 3 sectors (12 antennas) with associated parts, 9 RRHs, 4 GPS antennas, 3 OVPs and 1 equipment platform with 3 related cabinets. Related conduits on facade and service connection in basement.
B01087635-S2
08/16/2024
Special inspection requirement — Mechanical Systems
Robert Toms
08/16/2024
Special inspection requirement — Final
Robert Toms
02/07/2024
Filed — Alteration
FILING TO AMEND GREATER THAN 1/2 PSIG TO LESS THAN 1/2 PSIG. NO CHANGE IN EGRESS, USE OR OCCUPANCY.
B00871124-P2
02/06/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Younes Abouyaala
Latest 60 of 148 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsSigned-offALLIED RESTORATION CORP07/13/2026
DOB NOWPlumbingSigned-offAURA PLUMBING INC06/17/2025
DOB NOWGeneral ConstructionSigned-offATLANTA TRA&ENG CO.LLC06/02/2025
DOB NOWAntennaSigned-offATLANTA TRA&ENG CO.LLC06/02/2025
DOB NOWGeneral ConstructionSigned-offPREMIER CONSTRUCT SVC LLC03/14/2025
DOB NOWAntennaSigned-offPREMIER CONSTRUCT SVC LLC03/14/2025
DOB NOWSignSigned-offNEPTUNE SIGNS&AWNINGS INC12/10/2024
DOB NOWGeneral ConstructionSigned-offALLIED RESTORATION11/01/2023
DOB NOWConstruction FenceSigned-offALLIED RESTORATION10/31/2023
DOB NOWConstruction FenceSigned-offALLIED RESTORATION09/05/2023
DOB NOWPlumbingSigned-offH BRONNER & SON PLBG & HT08/30/2023
DOB NOWPlumbingSigned-offH BRONNER & SON PLBG & HT07/31/2023
DOB NOWGeneral ConstructionSigned-offALLIED RESTORATION05/13/2023
BISMHISSUEDTEMP-RITE AIR CONDITIONING06/10/1996
BISPLISSUEDS B A11/24/1995
BISOTISSUEDMICRON GENERAL CONTRACTORS,INC.10/18/1995
BIS—ISSUEDL S SIGN CO INC04/18/1995
BIS—ISSUEDL S SIGN CO INC04/18/1995
BIS—ISSUEDL S SIGN CO INC04/18/1995
2 projects · most recent 06/29/2026
Heating and Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
06/29/2026Signed-offALLIED RESTORATION CORPHeating and Air Conditioning Systems
Heat / Cool
Daikin DAIKIN - DX13SA0603AE 60,000 BTU · Condensing Unit ×3
Amana AMANA-ASZS606010AA 60,000 BTU · Condensing Unit ×2
Bryant BRYANT- 114SAN042-A 42,000 BTU · Condensing Unit ×1
Carrier CARRIER-PA13NA036000ABAA 60,000 BTU · Condensing Unit ×1
Fujitsu FUJITSU= AOUH09LPAS1 9,000 BTU · Condensing Unit ×1
__Junk__ GCGD36S21S2A 36,000 BTU ×1
04/29/2025Signed-offALLIED RESTORATION CORPHeating and Air Conditioning Systems
Heat / Cool
Daikin DAIKIN #DX13SA ×6
Amana AMANA - AHVE60DP1400 5 tons · Fan Coil Indoor ×3
Ventilation
Amana AM9C961005CNA #AM9C96 100,000 BTU · Furnace ×6
5 projects · most recent 06/04/2025
General Wiring
FiledStatusContractorScope
06/04/2025Permit IssuedTOTAL ELECTRIC SOLUTIONSGeneral Wiring
03/23/2025CompleteACCURATE ELEC'L CORP.General Wiring
10/22/2024CompleteJONG HYUN KIM—
06/11/2024CompleteACCURATE ELEC'L CORP.General Wiring
05/05/2020CompleteR.C.M. ELECTRIC CORP.—
▾Field Inspections (DOB CAP) — 11
DateTypeResultReport
11/25/2025Pass-Final General Construction Non-Directive 14PassView ↗
08/29/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
07/31/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
05/16/2025Fail-Final General Construction Non-Directive 14FailView ↗
01/17/2025Pass-Final Sign Permit InspectionPassView ↗
10/21/2024Fail-Final General Construction Non-Directive 14FailView ↗
10/15/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
10/12/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
10/04/2023Certified Gas-Gas-Piping-RoughingCertifiedView ↗
10/04/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
10/04/2023Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 22
DateRequirementInspectorRole
06/02/2026Mechanical SystemsYounes Abouyaalaspecial
06/02/2026FinalNAVEEN KUMARprogress
08/27/2025Fire-Resistant Penetrations and JointsRobert Tomsspecial
05/07/2025FinalNAVEEN KUMARprogress
05/07/2025HVAC-R and service water heating equipmentYounes Abouyaalaenergy_progress
05/07/2025Mechanical SystemsYounes Abouyaalaspecial
05/07/2025Exterior Insulation and Finish Systems (EIFS)Younes Abouyaalaspecial
02/13/2025Fire-Resistant Penetrations and JointsYounes Abouyaalaspecial
02/05/2025Exterior Insulation and Finish Systems (EIFS)Younes Abouyaalaspecial
02/05/2025Mechanical SystemsYounes Abouyaalaspecial
02/05/2025FinalNAVEEN KUMARprogress
02/05/2025HVAC-R and service water heating equipmentYounes Abouyaalaenergy_progress
10/29/2024Fire-Resistant Penetrations and JointsYounes Abouyaalaspecial
10/21/2024HVAC-R and service water heating equipmentYounes Abouyaalaenergy_progress
10/21/2024Exterior Insulation and Finish Systems (EIFS)Younes Abouyaalaspecial
10/21/2024Mechanical SystemsYounes Abouyaalaspecial
10/21/2024FinalNAVEEN KUMARprogress
08/16/2024Mechanical SystemsRobert Tomsspecial
08/16/2024FinalRobert Tomsprogress
02/06/2024Fire-Resistant Penetrations and JointsYounes Abouyaalaspecial
08/16/2023Fire-Resistant Penetrations and JointsYounes Abouyaalaspecial
05/06/2023FinalNAVEEN KUMARprogress
▾Documents — 65 on file (BIS + DOB NOW)
▸Plans & Drawings15
▸DOB NOWPlans/Sketch15
08/27/2026B00871122-I1Request digital key ↗
08/27/2026B00865166-I1Request digital key ↗
08/27/2026B00871124-P3Request digital key ↗
Showing 3 of 15 on file for this type
▸Seals & Professional Certifications37
▸DOB NOWDPL-1: Design Professional Seal & Signature15
08/27/2026B00871124-P1Open ↗
08/27/2026B00871124-I1Open ↗
08/27/2026B00853101-I1Open ↗
Showing 3 of 15 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature13
09/27/2026B01087635-S2Open ↗
09/05/2026B00853101-I1Open ↗
09/05/2026B00853101-I1Open ↗
Showing 3 of 13 on file for this type
▸DOB NOWProgress Inspector Seal & Signature9
09/05/2026B00853101-I1Open ↗
09/05/2026B00853101-I1Open ↗
09/01/2026B00853101-P2Open ↗
Showing 3 of 9 on file for this type
▸Environmental & Asbestos12
▸DOB NOWDEP ACP-5: Asbestos Assessment Report12
08/27/2026B00871124-P2Open ↗
08/27/2026B00871124-I1Open ↗
08/27/2026B00853101-P1Open ↗
Showing 3 of 12 on file for this type
▸Energy Compliance1
▸DOB NOWPreliminary Commissioning Report Certification1
08/27/2026B00853101-I1Open ↗