Walk-up apt, over six families with stores
2461 ADAM C POWELL BLVD
MANHATTAN · Harlem (North) · BIN 1060128
💬 Discuss this project
1920Year Built
5Stories
C7Building Class
R7-2Zoning
17,161 sfGross Floor Area
20Units
Rent Stabilized13 Open Violations 9 unresolved · 4 paperwork only ▸
Walk-up apt, over six families with stores · Owner of record: NYC HOUSING AUTHORITY · 4,292 sf lot · 4 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingEquipmentGeneral
Permit Issued — active, not yet Signed-off
Roof97p · 1 filing · 20 docs
Floor 590p · 1 filing · 20 docs
Floor 488p · 1 filing · 20 docs
Floor 394p · 1 filing · 20 docs
Floor 289p · 1 filing · 20 docs
Floor 193p · 1 filing · 20 docs
CellarUnder Construction103p · 2 filings · 20 docs
Site & exteriorUnder Construction53p · 3 filings · 20 docs
Filed — no permit issued4p · 1 filing · 7 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
SAM CITY COLLABORATIVE LLC2303/22/2026
NEW YORK CITY HOUSING AUTHORITY1904/09/2026
SETTLEMENT HOUSING FUND, INC.207/08/2026
NYC Housing Authority203/22/2026
NYCHA203/21/2026
HPD103/21/2026
SAM CITY MASTER TENANT LLC103/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
GACE DPC406/15/2026
EMTG CONSULTANTS INC1201/20/2026
WELLWORTH CONSULTING LLC209/29/2025
RLM ENGINEERING PLLC101/05/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
JM ZONING, LLC.3003/21/2026
SKYLINE ACCESS103/21/2026
UNITED SAFETY CONSULTANTS203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
CEGF & G PLUMBING CORPPlumbing707/08/2026
DUAL FUEL PLUBING & HTINGPlumbing507/08/2026
DUAL FUEL COMPANY LLCGeneral Contractor404/09/2026
MONADNOCK GEN'L CONT INCGeneral Contractor307/03/2026
SPRING SCAFFOLDING LLCGeneral Contractor304/09/2026
PREMIER CONSTRUCTION INCGeneral Contractor104/09/2026
MARK REYESElectrical103/21/2026
YOUNG LIMElectrical103/21/2026
LIM YOUNGElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
MILROSE CONSULTANTS LLC20031606/15/2026
Building Lifecycle
All (123)Filed (22)Permit Issued (17)Signed Off (8)Violation (26)Inspection (10)Objection (10)Special Inspection (30)
09/10/2026
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
07/17/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
07/01/2026
Permit issued — Structural
M01380852-I1-ST
06/15/2026
Filed — Alteration
REPLACE DETERIORATED SIDEWALK VAULT FRAMING AND SLAB WITHNEW STEEL BEAMS AND SLAB. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
M01380852-I1
05/28/2026
Signed off — Alteration
MECHANICAL WORK IN CONJUNCTION WITH RENOVATION OF 5-STORY NYCHA MULTIPLE DWELLING THROUGHOUT: INSTALLATION OF NEW AIR-CONDITIONING SYSTEMS, VENTILATION SYSTEMS AND MISCELLANCEOUS HVAC WORK; NO CHANGES TO USE, EGRESS, OR OCCUPANCY.
M00882813-S6
05/20/2026
Signed off — Alteration
M01148257-I1
05/13/2026
Permit issued — Suspended Scaffold
M01148257-I1-SC
05/11/2026
Permit issued — Suspended Scaffold
M01392288-I1-SC
05/05/2026
Signed off — Alteration
INSTALLATION OF TEMPORARY SIDEWALK SHED AS PER PLAN. NO CHANGE IN USE, EGRESS OR OCCUPANCY. THE SIDEWALK SHED AT ADAM CLAYTON BLVD AND 143RD STREET ELEVATION.
M01121700-I1
04/29/2026
Violation issued (HPD, closed)
A
04/23/2026
Filed — Alteration
BETA-MAX HOIST INSTALLED IN ORDER TO LIFT MATERIAL TO PERFORM FACADE REPAIRS. SIDEWALK SHED FILED UNDER SEPARATE APPLICATION.
M01392288-I1
03/31/2026
Signed off — Alteration
MECHANICAL WORK IN CONJUNCTION WITH RENOVATION OF 5-STORY NYCHA MULTIPLE DWELLING THROUGHOUT: INSTALLATION OF NEW AIR-CONDITIONING SYSTEMS, VENTILATION SYSTEMS AND MISCELLANCEOUS HVAC WORK; NO CHANGES TO USE, EGRESS, OR OCCUPANCY.
M00882813-S4
03/31/2026
Special inspection requirement — Tenant Protection Plan Compliance
Benjamin Plotnick
03/31/2026
Special inspection requirement — Structural Steel - Welding
Benjamin Plotnick
03/31/2026
Special inspection requirement — Structural Steel - Details
Benjamin Plotnick
03/31/2026
Special inspection requirement — Final
Benjamin Plotnick
03/31/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
Benjamin Plotnick
03/31/2026
Special inspection requirement — Concrete - Cast-In-Place
Benjamin Plotnick
03/13/2026
Signed off — Alteration
MECHANICAL WORK IN CONJUNCTION WITH RENOVATION OF 5-STORY NYCHA MULTIPLE DWELLING THROUGHOUT: INSTALLATION OF NEW AIR-CONDITIONING SYSTEMS, VENTILATION SYSTEMS AND MISCELLANCEOUS HVAC WORK; NO CHANGES TO USE, EGRESS, OR OCCUPANCY.
M00882813-I1
03/05/2026
Signed off — Alteration
MECHANICAL WORK IN CONJUNCTION WITH RENOVATION OF 5-STORY NYCHA MULTIPLE DWELLING THROUGHOUT: INSTALLATION OF NEW AIR-CONDITIONING SYSTEMS, VENTILATION SYSTEMS AND MISCELLANCEOUS HVAC WORK; NO CHANGES TO USE, EGRESS, OR OCCUPANCY.
M00882813-S1
03/02/2026
Permit issued — Sidewalk Shed
M01121700-I1-SH
02/27/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
02/20/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
02/13/2026
Special inspection requirement — HVAC-R and service water heating system controls
Christopher Drutjons
02/13/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Christopher Drutjons
02/13/2026
Special inspection requirement — Post-installed Anchors
Christopher Drutjons
02/13/2026
Special inspection requirement — Tenant Protection Plan Compliance
Christopher Drutjons
02/13/2026
Special inspection requirement — HVAC-R and service water heating equipment
Christopher Drutjons
02/13/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
Christopher Drutjons
02/13/2026
Special inspection requirement — Maintenance information
Christopher Drutjons
02/13/2026
Special inspection requirement — Energy Code Compliance Inspections
Christopher Drutjons
02/13/2026
Special inspection requirement — Permanent certificate
Christopher Drutjons
02/10/2026
Special inspection requirement — HVAC-R and service water heating system controls
Christopher Drutjons
02/10/2026
Special inspection requirement — Maintenance information
Christopher Drutjons
02/10/2026
Special inspection requirement — HVAC-R and service water heating equipment
Christopher Drutjons
02/10/2026
Special inspection requirement — Shutoff dampers
Christopher Drutjons
02/10/2026
Special inspection requirement — Mechanical Systems
Christopher Drutjons
02/10/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
Christopher Drutjons
02/10/2026
Special inspection requirement — Post-installed Anchors
Christopher Drutjons
02/10/2026
Special inspection requirement — Heating Systems
Christopher Drutjons
02/10/2026
Special inspection requirement — Permanent certificate
Christopher Drutjons
02/10/2026
Special inspection requirement — Energy Code Compliance Inspections
Christopher Drutjons
02/10/2026
Special inspection requirement — Final
Christopher Drutjons
02/10/2026
Special inspection requirement — Tenant Protection Plan Compliance
Christopher Drutjons
01/30/2026
Inspection — Pass-Final Boiler Equipment Inspection
Pass
View inspection ↗
01/20/2026
Filed — Alteration
MECHANICAL WORK IN CONJUNCTION WITH RENOVATION OF 5-STORY NYCHA MULTIPLE DWELLING THROUGHOUT: INSTALLATION OF NEW AIR-CONDITIONING SYSTEMS, VENTILATION SYSTEMS AND MISCELLANCEOUS HVAC WORK; NO CHANGES TO USE, EGRESS, OR OCCUPANCY.
M00882813-A2
01/16/2026
Objection resolved — Addressed
01/15/2026
Signed off — Alteration
INSTALL HOIST IN ORDER TO PERFORM EXTERIOR FACADE REPAIRS. SIDEWALK SHED FILED UNDER SEPARATE APPLICATION.
M01251423-I1
01/14/2026
Signed off — Alteration
MECHANICAL WORK IN CONJUNCTION WITH RENOVATION OF 5-STORY NYCHA MULTIPLE DWELLING THROUGHOUT: INSTALLATION OF NEW AIR-CONDITIONING SYSTEMS, VENTILATION SYSTEMS AND MISCELLANCEOUS HVAC WORK; NO CHANGES TO USE, EGRESS, OR OCCUPANCY.
M00882813-S2
01/14/2026
Special inspection requirement — Maintenance information
Christopher Drutjons
01/14/2026
Special inspection requirement — Permanent certificate
Christopher Drutjons
01/14/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
Christopher Drutjons
01/13/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
01/13/2026
Objection raised — Admin
01/05/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
12/20/2025
Inspection — Certified Storm Drainage-ST-Fixtures-Finish
Certified
View inspection ↗
12/20/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
12/11/2025
Objection resolved — Addressed
12/11/2025
Objection resolved — Addressed
12/10/2025
Objection raised — Scope
Latest 60 of 123 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWStructuralPermit IssuedMONADNOCK GEN'L CONT INC07/01/2026
DOB NOWSuspended ScaffoldSigned-offSKYLINE RESTORATION INC05/13/2026
DOB NOWSuspended ScaffoldPermit IssuedPREMIER CONSTRUCTION INC05/11/2026
DOB NOWSidewalk ShedSigned-offSPRING SCAFFOLDING LLC03/02/2026
DOB NOWMechanical SystemsSigned-offDUAL FUEL COMPANY LLC12/05/2025
DOB NOWPlumbingSigned-offDUAL FUEL PLUBING & HTING11/06/2025
DOB NOWBoiler EquipmentSigned-offDUAL FUEL PLUBING & HTING11/06/2025
DOB NOWSidewalk ShedSigned-offSPRING SCAFFOLDING LLC10/02/2025
DOB NOWGeneral ConstructionSigned-offMONADNOCK GEN'L CONT INC09/09/2025
DOB NOWSuspended ScaffoldSigned-offPREMIER CONSTRUCTION INC07/09/2025
DOB NOWGeneral ConstructionSigned-offPREMIER CONSTRUCTION INC06/17/2025
DOB NOWPlumbingSigned-offBELL CONST SERV INC01/10/2025
DOB NOWMechanical SystemsSigned-offDUAL FUEL COMPANY LLC12/17/2024
DOB NOWBoiler EquipmentSigned-offDUAL FUEL PLUBING & HTING11/18/2024
DOB NOWPlumbingSigned-offDUAL FUEL PLUBING & HTING11/18/2024
DOB NOWSidewalk ShedSigned-offSPRING SCAFFOLDING LLC10/04/2024
DOB NOWGeneral ConstructionSigned-offMONADNOCK GEN'L CONT INC10/02/2024
BISFPISSUEDFIRE ZONE VENT & SUPP INC10/11/2013
BISPLISSUEDCATMAN PLUMBING INC07/17/1996
BISMHISSUEDCHUNG KEE CNSTRUCTION INC.06/13/1996
BISOTRE-ISSUEDCHUNG KEE CONSTRUCTION INC.02/28/1996
1 project · most recent 01/20/2026
Heating and Air Conditioning Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
01/20/2026Signed-offDUAL FUEL COMPANY LLCHeating and Air Conditioning Systems, Ventilation Systems
Heat / Cool
Mitsubishi Electric PUY-AH24NL 24,000 BTU · Condensing Unit ×3
Ventilation
Greenheck CUE-099-VG 775 CFM · Exhaust Fan ×3
SQ-100-VG 775 CFM · Exhaust Fan ×3
1 project · most recent 01/20/2026
Gas Storm Water/Sanitary
FiledStatusContractorScope
01/20/2026Signed-offDUAL FUEL PLUBING & HTINGGas, Storm, Water/Sanitary
4 projects · most recent 08/11/2026
General Wiring Boiler Controls
FiledStatusContractorScope
08/11/2026CompleteGOTHAM TECHNICAL SERVICESGeneral Wiring
12/14/2024CompleteSTX ELECTRICAL CORPBoiler Controls
10/04/2024CompleteTOP SHELF ELECTRIC CORP—
09/18/2020CompleteHERTZ ELECTRIC LLC—
2 projects · most recent 06/15/2026
Steel Concrete
FiledStatusContractorScope
06/15/2026Permit IssuedMONADNOCK GEN'L CONT INCSteel, Concrete
01/20/2026Signed-offDUAL FUEL COMPANY LLC1 scope_items
1 project · most recent 09/29/2025
Sidewalk Shed
FiledStatusContractorScope
09/29/2025Signed-offSPRING SCAFFOLDING LLCSidewalk Shed
1 project · most recent 04/23/2026
Suspended Scaffold (SC)
FiledStatusContractorScope
04/23/2026Permit IssuedPREMIER CONSTRUCTION INCSuspended Scaffold (SC)
▾Field Inspections (DOB CAP) — 10
DateTypeResultReport
09/10/2026Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
07/17/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
02/27/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
02/20/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
01/30/2026Pass-Final Boiler Equipment InspectionPassView ↗
01/13/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
01/05/2026Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
12/20/2025Certified Storm Drainage-ST-Fixtures-FinishCertifiedView ↗
12/20/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
11/03/2025Pass-Final PL - Up to 9 Requested FloorsPassView ↗
▾Special Inspection Requirements (DOB NOW) — 120
DateRequirementInspectorRole
03/31/2026Tenant Protection Plan ComplianceBenjamin Plotnickspecial
03/31/2026FinalBenjamin Plotnickprogress
03/31/2026Structural Steel - WeldingBenjamin Plotnickspecial
03/31/2026Structural Stability – Alterations of existing buildingsBenjamin Plotnickspecial
03/31/2026Concrete - Cast-In-PlaceBenjamin Plotnickspecial
03/31/2026Structural Steel - DetailsBenjamin Plotnickspecial
02/13/2026HVAC-R and service water heating system controlsChristopher Drutjonsenergy_progress
02/13/2026Energy Code Compliance InspectionsChristopher Drutjonsprogress
02/13/2026Tenant Protection Plan ComplianceChristopher Drutjonsspecial
02/13/2026Fire-Resistant Penetrations and JointsChristopher Drutjonsspecial
02/13/2026Post-installed AnchorsChristopher Drutjonsspecial
02/13/2026Permanent certificateChristopher Drutjonsenergy_progress
02/13/2026HVAC-R and service water piping design and insulationChristopher Drutjonsenergy_progress
02/13/2026HVAC-R and service water heating equipmentChristopher Drutjonsenergy_progress
02/13/2026Maintenance informationChristopher Drutjonsenergy_progress
02/10/2026Heating SystemsChristopher Drutjonsspecial
02/10/2026Tenant Protection Plan ComplianceChristopher Drutjonsspecial
02/10/2026Permanent certificateChristopher Drutjonsenergy_progress
02/10/2026Shutoff dampersChristopher Drutjonsenergy_progress
02/10/2026Maintenance informationChristopher Drutjonsenergy_progress
02/10/2026HVAC-R and service water heating system controlsChristopher Drutjonsenergy_progress
02/10/2026HVAC-R and service water heating equipmentChristopher Drutjonsenergy_progress
02/10/2026HVAC-R and service water piping design and insulationChristopher Drutjonsenergy_progress
02/10/2026Energy Code Compliance InspectionsChristopher Drutjonsprogress
02/10/2026FinalChristopher Drutjonsprogress
Latest 25 of 120.
▾Documents — 135 on file (BIS + DOB NOW)
▸Plans & Drawings22
▸DOB NOWPlans/Sketch22
09/03/2026M00651920-I1Request digital key ↗
08/27/2026M00882813-P1Request digital key ↗
08/27/2026M00882813-A2Request digital key ↗
Showing 3 of 22 on file for this type
▸Applications & Permits3
▸BISPLAN / WORK APPROVAL APPLICATION2
10/03/2013121541028Open ↗
02/27/2013121541028Open ↗
▸BISWORK PERMIT APPLICATION1
10/16/2013121541028Open ↗
▸Seals & Professional Certifications64
▸DOB NOWProgress Inspector Seal & Signature22
09/23/2026M00882813-S4Open ↗
09/01/2026M00882813-S1Open ↗
09/01/2026M00882813-P9Open ↗
Showing 3 of 22 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature21
09/23/2026M00882813-S4Open ↗
09/23/2026M00882813-S4Open ↗
09/02/2026M00882813-A1Open ↗
Showing 3 of 21 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature19
09/03/2026M00651920-I1Open ↗
08/27/2026M00882813-P5Open ↗
08/27/2026M00882813-P4Open ↗
Showing 3 of 19 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION2
10/16/2013121541028Open ↗
02/27/2013121541028Open ↗
▸Trade Schedules & Equipment2
▸BISSCHEDULE B - PLUMBING2
10/03/2013121541028Open ↗
02/27/2013121541028Open ↗
▸Environmental & Asbestos17
▸DOB NOWDEP ACP-5: Asbestos Assessment Report16
09/03/2026M00651920-I1Open ↗
08/27/2026M00882813-S3Open ↗
08/27/2026M00882813-P5Open ↗
Showing 3 of 16 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
02/27/2013121541028Open ↗
▸Energy Compliance1
▸DOB NOWPreliminary Commissioning Report Certification1
08/27/2026M00882813-S3Open ↗
▸Approvals, Objections & Sign-offs19
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter18
09/03/2026M00651920-I1Open ↗
08/27/2026M00882813-P1Open ↗
08/27/2026M00882813-P5Open ↗
Showing 3 of 18 on file for this type
▸BISADMINISTRATIVE OBJECTIONS1
02/27/2013121541028Open ↗
▸Cost, Insurance & Ownership1
▸BISCOST AFFIDAVIT1
02/27/2013121541028Open ↗
▸Filing & Intake Forms1
▸BISEFILING COVER SHEET1
02/27/2013121541028Open ↗
▸Other Documents5
▸DOB NOWManufacturer's Specifications2
08/17/2026M01392288-I1Open ↗
08/13/2026M01251423-I1Open ↗
▸DOB NOWCalculations2
08/17/2026M01392288-I1Open ↗
08/13/2026M01251423-I1Open ↗
▸DOB NOWIRA Certification1
08/13/2026M01148257-I1Open ↗