← Back
BuildNYC
Two family frame
2461 BELMONT AVENUE
BRONX · Belmont · BIN 2012238
💬 Discuss this project
1899Year Built
2Stories
B2Building Class
R6Zoning
1,752 sfGross Floor Area
2Units
Rent Stabilized1 Active Violation 0 unresolved · 1 paperwork only ▸
Two family frame · Owner of record: Sandhills 8 · 1,457 sf lot · 1.2 FAR built · Flood zone X
Locations of Work
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Floor 2Interior refurbishing throughout building2 filings · 4 docs
Floor 1Interior refurbishing throughout building2 filings · 4 docs
Sub-Basement1 filing · 2 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Sandhills 8103/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
03/07/2025$810K—2461 BELMONT BH LLC → SANDHILLS 8 LLC$462/sf building
10/30/2024$517K—LI BRONX RENTALS LLC → 2461 BELMONT BH LLC$295/sf building
06/03/2015$385K—Private party → LI BRONX RENTALS LLC$220/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Michael Depasquale, Architect210/13/2025
Basic Groups211/21/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Basic Groups403/21/2026
Building Lifecycle
10/13/2025
Filed — Alteration
Cap and remove existing gas service piping to the residence, including disconnection at point of entry, installation of approved cap, and inspection for final sign-off. No new gas piping or fixtures are included.
X01273841-I1
10/06/2025
Special inspection requirement — Energy Code Compliance Inspections
MICHAEL DEPASQUALE
10/02/2025
Objection resolved — Addressed
09/15/2025
Objection resolved — Addressed
09/10/2025
Objection resolved — Addressed
47 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Nothing on file for this building.
1 project · most recent 10/13/2025
Gas
FiledStatusContractorScope
10/13/2025——Gas
1 project · most recent 07/10/2025
General Wiring
FiledStatusContractorScope
07/10/2025Permit IssuedPower Surge ElectricGeneral Wiring
▾Special Inspection Requirements (DOB NOW) — 14
DateRequirementInspectorRole
10/06/2025Energy Code Compliance InspectionsMICHAEL DEPASQUALEprogress
09/09/2025Energy Code Compliance InspectionsMICHAEL DEPASQUALEprogress
08/26/2025Fire-Resistant Penetrations and Joints—special
08/26/2025Structural Stability – Alterations of existing buildings—special
07/28/2025Final—progress
11/21/2024Maintenance information—energy_progress
11/21/2024HVAC-R and service water heating system controls—energy_progress
11/21/2024Fire-Resistant Penetrations and Joints—special
11/21/2024Energy Code Compliance Inspections—progress
11/21/2024HVAC-R and service water heating equipment—energy_progress
11/21/2024HVAC-R and service water piping design and insulation—energy_progress
11/18/2024Fire-Resistant Penetrations and Joints—special
11/18/2024Fire-Resistance Rated Construction—progress
11/18/2024Energy Code Compliance Inspections—progress
8 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account