5 Open Violations 4 unresolved · 1 paperwork only▸
DOB06/23/2025STRUCTURE RENDERED NON COMPLIANT OBSERVED WINDOWS AND DOORS OOUT , STR UCTURE CHARRED , ROOF OPEN TO THE ELEMENTS DUE TO FIRE .VACATE ENTIRE BUILDING STRUCTURE MUST BE MAINTAIN IN CODE COMPLIANT MANNER
DOB06/23/2025EMERGENCY WORK ORDER.BLDG SUSTAINED SEVERE FIRE DAMAGE ON 6/22/25 PORCH ROOF SEVERELY DAMAGED & IN DANGER OF COLLAPSE 2NDFL JOIST @FRONT SEVERELY BURNED.IMMED INSTALL FENCE TO SECURE PROPERTY DEMOLISH THE PORCH ROOF SHORE AS REQ'D WORK/BE PERFORMED UNDER DIRECT SUPV
DOB06/23/2025FAILURE TO MAINTAIN.RES BLDG THAT SUSTAIND FIRE DMGS ON 6/23/25.ROOF PARTIALLY COLLAPSD.CEILINGS COLLAPSED.SEVERE WATER DAMAGE THROUGHOUT MISSING WINDOWS,DMAAGED FACADE.ENT BLDG&RPAIR UNDR PRMT.OBTN PRMT BY 10/1/25.SIGN OFF BY 12/31/25
ECB02/25/20251RCNY 103-09(E). FAILURE TO FILE A RETAINING WALL CONDITION ASSESSMENTREPORT BY THE DEADLINE AS REQUIRED BY 1RCNY 103-09(E)(2) AND (5). TO DATE, THE DEPARTMENT HAS NOT RECEIVED A RETAINING WALL CONDITION ASSESS$1K due
ECB03/15/2006WORK WITHOUT A PERMIT-WORK NOTED: CELLAR INSTALLATION OF PARTITION FRAMING-STUDS AND FLOOR TRACK-INSTALLATION OF METAL DOOR PARTIAL COVERINGOVER WOOD COLUMN (VERT. SPLIT IN AREAS). REMEDY: STOP ALL WORK- OBTAINNothing owed — awaiting certificate of correction
Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.